My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2300 - Underground Storage Tank Program
>
PR0231893
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 11:19:23 AM
Creation date
11/4/2018 2:13:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231893
PE
2361
FACILITY_ID
FA0018028
FACILITY_NAME
AT&T CALIFORNIA - UE17L
STREET_NUMBER
2300
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
Stockton
Zip
95210
APN
12002013
CURRENT_STATUS
02
SITE_LOCATION
2300 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2300\PR0231893\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/14/2012 8:00:00 AM
QuestysRecordID
84848
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
azo ^ ea <br /> NW <br /> 9TAT[OFCALIFORMA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> n UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B <br /> COMPLETE A SEPARATE FORM FOR EAC TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKN WN <br /> A. OWNER'S TANK I.D.• O� B. MANUFACTURED BY: v^oe <br /> C. DATE INSTALLED(MO/DAYIYEAR) `' D. TANK CAPACITY IN GALLONS: 442-12 <br /> ILTANKCO S IFA-11S MARKED.COMPLETE ITEM C. <br /> A1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. Ir I BREGLILAR UNLEA ED 3 DIESEL ❑ 6 AVIATIONGAS <br /> 712 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ 1b PREMIUM 4 GASAHOL O 7 METHANOL <br /> UNLEADED ❑ 5 JET FUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN O 2 WASTE O 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D- BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.4: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 11 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 52-12 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) O 9 BRONZE ❑ 10 GALVANIZED STEEL F2�95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING LINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3VIVINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE I?95 UNKNOWN ❑ 98 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION p PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWNA U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A®a5 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION Q<AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING ❑ MDNRORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING &14 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW ' <br /> COUNTY# JURISDICTION# FACILITY* TANK# <br /> STATE I.D.# 37 F-71 = I I I I Ill li 131f( <br /> PERMITNUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE \ I\ <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. O <br /> ' FORM11415 <br />
The URL can be used to link to this page
Your browser does not support the video tag.