Laserfiche WebLink
UST SYS-,M PRINTSET INFORMATION <br /> 1: v Four complete sets of plans (To include specification sheets and/or equipment brochures if not on file). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location and nanber of tanks. <br /> 4. Tank cross-sectional diagram included on prints submitted. <br /> 5. Detail of tank, piping system, excavation and cover. <br /> 6. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Subchapter 16, <br /> Article 3, Sec. 2631 (r) E 26353 <br /> 7. verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. [Section 2635 (b) (5)3 <br /> 9. Tightness Test (NFPA 30) is required on both primary (10) and secondary (20) containment systems before covering. <br /> [Section 2635 (b) (6) d (7)1 <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular space. [Section 2635 (b) (7)3 <br /> 11. \ NFPA 329 "Precision Test- required upon completion of installation with tank in operating condition. Test results to <br /> be submitted directly to PHS/EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (s)] <br /> 12. TANK COMPOSITION <br /> TANK # # I # # # # <br /> CAPACITY <br /> MANUFACTURER G <br /> COMPOSITION sT '/FG <br /> MODEL <br /> PRODUCT p�jL <br /> CORROSION PROTECTION FI$ <br /> U.L. LISTED i <br /> COMPATIBILITY WITH 100% <br /> METHANOL NF7� <br /> 13. TANK(s) TO BE INSTALLED _ <br /> A. Steel-clad with fiberglass reinforced plastic. - <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - 40,000 volts). (Section 2635 (b) (4)] <br /> C. Fiberglass (Sections 2635 (3) and 2631 (p)] <br /> (1) Striker plate dimensions and materials. <br /> (2) Striker plate under all accessible openings. <br /> \ (3) Installation instructions require an air test and soap bubble test prior to installation. <br /> D. Non-clad steel tank [Section 2635 (b)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Approved by a corrosion engineer or N.A.C.E. technician. <br /> (3) Document stating inspection method and frequency (minimum semi-annual inspection requirement). <br /> 4 <br />