My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2300 - Underground Storage Tank Program
>
PR0231893
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:28 PM
Creation date
11/4/2018 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231893
PE
2361
FACILITY_ID
FA0018028
FACILITY_NAME
AT&T CALIFORNIA - UE17L
STREET_NUMBER
2300
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
Stockton
Zip
95210
APN
12002013
CURRENT_STATUS
02
SITE_LOCATION
2300 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2300\PR0231893\INSTALL PLAN 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Secondary container othe an double-walled tanks (includes intercepti <br /> and detection systems). (`Section 2633 Ml <br /> IA. Backfill in secondary container. [Section 2635 (c) 1-83 <br /> _ B. Pore space of granular material used as backfill for primary container s) comQlies with Section 2631 <br /> (g). [Erg i neering data to support capacity requiremenO. <br /> C. Two or sore primary containers within secondary container. (include information on product <br /> coqutibility) <br /> _ <br /> V. Secondary container capable of precluding highest anticipated groundwater. <br /> E. Secondary container sloped to a monitoring sung from which leakage or precipitation can be detected <br /> and removed. <br /> _ F. Yater tight corner which extends at least a foot beyond each boundary of the secondary container <br /> excavation, sloped to drain away from excavation. <br /> 20. secondary container(s) thickness, density, composition, product compatibility. <br /> Sized to contain unauthorized releases from primary containers to allow sufficient tine for detection and removal. <br /> [Section 2631 (c)) <br /> 21. Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br /> and (2)) <br /> A. Single primary containers - 100%. <br /> B. Multiple primary containers - 150% of largest primary container or 10% above aggregate. <br /> 22. Secondary container(s) open to rainfall. [ Section 2631 (f)) <br /> _ Volunetric requirements = 24 hours of 100 year storm in addition to primary container volures. <br /> 23. Secondary container floor. (Section 2631 (i)] <br /> A. Constructed on firm base. <br /> B. sloped to collection sung ( 1/8 inch per foot). <br /> (1) One or more access casings installed in sung. <br /> (a) Size to allow removal of collected liquid. <br /> (b) Extended to ground surface. <br /> (c) Covered with a locked waterproof cap or <br /> within a secured facility. <br /> (d) Thickness allows for anticipated stresses. <br /> _ (e) Construction materials are not weakened stored product or will not donate, <br /> \ capture, or mask constituents to be monitored. <br /> 24. ` Membrane liner specifications. [Section 2631; k, 1, and m) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.