Laserfiche WebLink
RESISTANT SEALANiTOM TES; NOTE, SPECIFICATIONS <br /> 1, MINIMUM BURY 0 RISER LOCATION L DEADMAN TO BE LOWERED DOWN IN TANK <br /> TOOLED TO 1/4" RADIUS IF IS 1s" BELOW GRADE (TYP.) HOLE WITH THE CABLES ATTACHED. <br /> W <br /> EnoflPiping <br /> PLASTIC INSERT 2. BACKFILL THE TANK HOLE WITH 72" OF 1. Shelll c consist of flexible inner primary ' <br /> 1/2. IS NOT USED 2. PAINT PIPE ABOVE GRADE. System <br /> - <br /> 3. NEC CLASS I, DIVISION 2 PEA GRAVEL AND THEN SET THE TANK IN pipe contained <br /> AREA 5' AROUND END OF PLACE IN ACCORDANCE WITH THE TANK within o flexible outer containment pipe. <br /> VENT RISER. MANUFACTURES SPECIFICATIONS. NATIVE SOIL 2, Shall be continuous, wherebythere shall be no fittings or <br /> m BACKER TUR PER piping connections, for either the primary n secondary <br /> MANUFACTURER'S SPECS _ TANK piping containment pipe which ore not visible or or secondary <br /> from <br /> 3 ON TA KITH NAATT CHL CAB ES OVERTANK <br /> OR HOLD-DOWN the aboveground surface. <br /> JOINT FILLER " AND SECURE WITH CABLE CLAMPS MIN. OF CABLE <br /> / \ 3 PER CABLE END. PULL CABLE TIGHT WITH 3. Shoe provitle watertight containm<nt of the tanks piping <br /> r THICKENED SLAB 40OW METAL HALIDE LUMINAIRE COME ALONG PRIOR TO ATTACHING CABLE CLAMPS, PEA GRAVEL and its associated fittings, and the shear valve assembly <br /> WHERE OCCURS / \ ON 5' SQUARE LIGHT POLE located below each ground fuel dispenser unit. <br /> 4, REFER TO HOLD DOWN CALCULATIONS, - BACKFILL <br /> A EXPANSION DONT / \ (OWNER SUPPUED) <br /> "BURK <br /> SHEET P-1 FOR NUMBER OF HOLD DOWN 1 DEADMAN 4. Shell be made of non-corrosive materials,. or if metallic, ~ <br /> RESIST " PETROLEUM / STRAPS REQUIRED. such as the fittings and couplings, Isolated from <br /> - / -A corrosion causing elements <br /> RESISTANT SEALANT <br /> 1-1/2- OR 1 4 \ 5. Outer secondary containment system shall be of such a [y <br /> TOOLED TO 1/4" RADIUS <br /> J J IF PLASTIC INSERT I FILTER FABRIC IF REQUIRED. SEE design 9 <br /> 0 \ to withstand the <br /> maximum <br /> mAASHTOr M294.burial loods and <br /> 1/4" IS NOT USED NOTE q10 OF SPECIFICATIONS. <br /> ted in <br /> nce <br /> th <br /> g and made of materials to have sufficient strength <br /> SLAB DEPTH I '. <br /> PRESSURE VACUUM CAP FOR STAINLESS STEEL CABLE CLAMPS <br /> GASOLINE TANK OPEN VENT CAP TYP, OF 3 MINIMUM . 5. Flexible inner primary piping system shall be capable of., <br /> FOR DIESEL TANK withstanding liquid pressure five times graoter"thou the <br /> BACKER ROD PER ( ) <br /> MANUFACTURER'S SPECS i <br /> FUEL ISLAND designed operating p "f <br /> 6' SOH, a0 GALVANIZED 9pressures. ,. <br /> STEEL PIPE FILLED <br /> WITH CONCRETE 7 Outer s oondar containment system shall undergo on-air <br /> t TOOLED CONTROL JOINT GALV STEEL UNISTRUT BRACING #4 REBAR 0 EA CORN, pressure ho est (3 to 5'-psi) after installation.and <br /> 4'-0" I MOUNTED TO LIGHT POLE WJ #3 TIES 0 16' O.C. before lhe�_^final^ back ., <br /> 2' BLACK IRON VENT RISER 8. Flexible 'nnecp" my„y i�ng_yystem shall be subject to <br /> PAINT SAFETY �- 50 a av pressure hold test prior to final backfill, ` <br /> 8 CON/'� SCALE: 1 1/2"=1' 0" YELLOW �_ - ' <br /> CRETE JOINTS PULL HOLE IN POLE WALL Design of secondary containment system Shall permit qny <br /> / 12'X12" PRECAST C C. DEADMAN EA. SIDE OF leak in the primary piping system to flow from its source <br /> NOTE TANK (MINIMUM) SEE P-1, TANK HOLD DOWN to a surface access containment chombee which con be <br /> CENTER WELL BOX DIRECTLY OVER ANCHOR BOLTS w/ LEVELING • _ CALL FOR SIZE REQUIRED. fitted with an electronic leak detection system, <br /> 1'-3" CONCRETE CROWN, z — — _ _ y <br /> CONFIRM W/ PACIFIC BELL TEST PIPE AS SHOWN, LIMITED NUTS (BY SUPPLIER) THROUGH <br /> ENGINEER, ACCESS MANHOLE EMCO WHEATON BASE PLATE ON DRY PACK <br /> 1/2" 0 STAINLESS STEEL STRANDED CABLE 10. Secondary containment pipe shall be sized to allow removal <br /> pA722-007. 72' m MANHOLE N1 TH a GROUT FURNISHED BY THE GENERAL CONTRACTOR, of primary pipe without need for excavation. <br /> LOCKING CAP AND COLLAR, o it USE 3 CABLE CLAMPS PER END OF CABLE <br /> ISLAND BEYOND SPACED 2" APART AND ONE 4" LONG LOOSE <br /> 1. a (5) #3 TIES 0 3" O.C. END, WRAP WITH CALPICO TAPE AND COVER <br /> WITH ASPHALT EMULSION _ <br /> ,d I CONCRETE ISLAND <br /> ° - SLAB OR 1 TANK HOLD DOWN DETAIL SCALE: NONE - <br /> CONCRETE SLAB YARD PAVING 8" CONCRETE TANK SLAB <br /> 10 r—�'---_L <br /> NOTE: ^ 4 .• . . ..•' e• ! o f__-___ WRAP PIPE BELOW GRADE <br /> TEST POINT PIPE & SATURATION TESTING . e °; . a p 1 ��\�� r------� <br /> 4" SOH. 40 P,V.C. & THREADED PIPE OBTAINED FROM AARDVARK CORP, I °d ' ° I < I ro %�\�� (-------1' W SLOPED CTTOP & TOOQNCREIE LED <br /> 1475 MERIDIAN EAST, H7 (206) L,------ EDGES <br /> COUPLING TO 2'-0" BELOW GRADE WASHINGTON 98371 PH; (206)927-4321 <br /> (USE OR EQUAL) I I I,• m I 1 <br /> 4" 0 SCH. 40 P.V.C. FACTORY - I I .4 • I t-r-+-�.__ #3 HOOP 0 6" O.C, (TYP) INSIDE OF SUMP OUTSIDE OF SUMP <br /> SLOTTED TEST WELL PIPE. SLOTS LENGTH OF TEST PIPE WILL VARY <br /> 020', APPROX, 1/4" APART X 2" PER DEPTH OF EXCAVATION <br /> LONG. APPROX. 48 SLOTS PER FT. I I I I L J .L J' (4) #4 VERTICAL BARS <br /> 4" p P.V:C. PIPE CAP 4 - - � '�(TYP,) <br /> INSTALL IN DIAGONAL CORNERS OF 2"0 X 24" LONG FLEX CONNECTOR. <br /> CLOSED END OF PIPE AT BOTTOM TANK HOLE UNLESS SITE PLAN TI TE FLEX WITH FLEXIBLE <br /> OF EXCAVATED TANK HOLE SPECIFIES OTHERWISE. CONTAINMENT BOOT OR TELEFLEX SUMP WALL ENVIROFLEX SECONDARY PIPING <br /> 18" DIA. "SOIL SAFE 30" (SEE EQUIPMENT UST FOR <br /> a CONC, FOOTING SIZE REWIRED) <br /> PEA GRAVEL BACK FILL - 2' FIBERGLASS BELL & FEMALE <br /> OR MALE AS PREFERRED ENVIROFLEX PRIMARY PIPING <br /> FOR WET & DRY HOLE INSTALLATIONS <br /> ) (SEE EQUIPMENT UST FOR <br /> SIZE REWIRED) <br /> 9 TEST POINT AT TANK BACK FILL <br /> SCALE 6 BOLLARD DETAIL SCALE: NONE 4 TANK VENT RISERS WITH YARD LIGHT SCALE: v2 = 1'-0 <br /> YARD LIGHT WI4ER <br /> VENT RISERS,FOOTING BELOWUNLEADED DISPENSER <br /> 6" HIGH CONCRETE <br /> W <br /> DIESEL DISPENSDISPENSER ISLAND ENVIRCFLEX FLAT BULKHEAD FITTING <br /> AIR AND WATER DISPENSER <br /> FIELD DRILL SUMP FOR <br /> EXISTNG BOOTH BULKHEAD FITTINGBOLLARD (TYP OF 4) SEE SHEET P-3 <br /> SEE <br /> VAPOR RETURN <br /> LINE IN DISPENSER <br /> SHEAR VALVE <br /> MOUNT FLUSHTOP OFISLANDDISPENSER <br /> 'oL DISPENSER A60O002EATON SHEAR VALVE STABILIZER BAR _STEEL ISLAND FORM TOP OF CONIC. ISLAND EXPANSION JOINT 2 SUMP PE-NE:TRATION DTL (ENVIROFLEX PIPING) <br /> O STEEL ISLAND FORM i'-0' J'_0" 3._0,. 2,_0,(TYP � a. ' a 'u '< - _._ a a •o <br /> C( - < a 4 od e GRADE GRADE a. a a 4 �s CI <br /> Q SEAL BY LOCAL ENGINEER <br /> GRA4 ' <br /> N�RTH F a 4 aQ o.'d4 GRADE RCONFAT N. E 8 ASSOCIATES, INC. <br /> ). �/ ARcHnECrunsi PLANNNO @IONEEFMO <br /> INSIDE OF 5LMPS OUTSIDE OF SUMP rrar w.nmcrvac aw. wrPcuw u a+®4 no'n zca-rap <br /> SCALE: 1/4"=1 -0' ' <br /> AN w.AfBYI P TELT • .YAE.K RPV.�.B'CfY_'ER '.� <br /> ro <br /> 1O ISLAND DETAIL HEAR,VALVE STABILIZER BAR �(y, PENETRATION, <br /> SUMP DISPENSER <br /> " V Y t PENETRAFION, SEE CONTAINMENT BO% <br /> -SHEAR VALVE ° I_ r <br /> MOUNT FLUSH w/ \ �� <br /> N CONCRETE OR ASPHALT (TOP OF ISLAND ENVIROFLEX 2"x24" FLEX CONNECTOR CONDUIT <br /> GRADE COVER E,MCO WIEATON A60-002 SECONDARY PIPING w/ ONE END SWIVEL <br /> 6" WIDE YELLOW MARKING rENVIROFLEX ADAPTER <br /> N TAPE ALONG TRENCH. x l\Vt y +` °1 <br /> > DISPENSER - <br /> ALLEN MFG.# AMT-1006-RE. CONTAINMENT BOX I :_ f. <br /> _ FIELD DRILL SUMP FOR BULKHEAD <br /> o' BACKFILL MATERIAL: PEA. \ �� \ / AND PIPE INSERT, SEE 22 SHEET ISSUED FOR BID 11/22/9 CTL <br /> is, �. NO. REVISIONS / AUTHORIZATIONS DATE BY <br /> GRAVEL (TYP.) BELOW \ / P-3. " <br /> CONCRETE OR ASPHALT -_- ,4 <br /> i) - ENVIROFLEX PIPING <br /> GRADE COVER, <br /> U SEE NOTES 1 AND 2 SEE PRODUCT <br /> PENETRATION PRODUCT PIPE <br /> PRODUCT -I� 2.. FRp p,PiNO STANDARD TANK AND PIPING <br /> 2" FIBERGLASS <br /> O w SUMP PENETRATION PRODUCT PIPE <br /> SEEDETAILS (FLEET TANKS) <br /> : <br /> N / `��II p) 2" NET STEEL 90' ELBOW e - DRAWINGS PREPARED FOR .I <br /> TOP OF 3' MIN I ''^Q T Il�W <br /> CCC <br /> PIPE L.- -I_ a J W o'' l�r-'�4 V, I, f�yl,�.. 2° eXM FIBERGLASS PACIFIC El BELL <br /> SACRAMENTO, CALIFORNIA <br /> FIELD DRILL SUMP FOR <br /> 3" MIN—.{ i 4ewU, BULKHEAD AND <br /> SHEET <br /> FACILITY ADDRESS <br /> INSERT, SEE <br /> NATES <br /> P-3, 2300 E. EIGHT MILE ROAD <br /> Q_ I BACK FILL AND COMPACTION FOR ALL CONDUIT & PIPING TRENCHES TO MEET. F STOCKTON, CALIFORNIA <br /> N STATE, CITY, COUNTY, AND LOCAL REQUIREMENTS. <br /> O L'. <br /> 2. BACKFILL AND COMPACTION FOR SERVICE LATERAL CONDUIT TRENCH TO <br /> MEET LOCAL ELECTRIC UTILITY COMPANY REQUIREMENTS. IF SOIL IS NOT DATE: 72/6/95 DRAWN BY: CTL <br /> ROCK FREE, ADD 4" TO DEPTH OF SERVICE LATERAL CONDUIT TRENCH, <br /> NO IF: PROJECT ENGINEER CHECKED BY: J, McGRATH <br /> O EST RO NO, SHEET 4 OF 6 SHEETS <br /> Z SCALE: NONE <br /> VJ <br /> z 1 REFER TO SHE. P-3 FOR <br /> U SCALE; NONE EQUPMF.NT ITEMS. 0 SCALE: 1-1/2"=1'-0" APPROVED DRAWING NO. <br /> 0 <br /> 11 TRENCH DETAIL SCALE NONE 7 DISP. PIPING TERM DETAIL (PRODUCT PIPING) 5 DISP. PIPING TERM DETAIL (VAPOR RETURN PIPING) 3 SUMP PENETRATION DTL (FIBERGLASS PIPING) Y- P-4 <br /> MANAG€R <br />