| 
								      																																																			psig  for  one  hour.    Joints  shall  be  soaped  with  #7006
<br />    				ASPHALT CONCRETE  PAVING     									5.      Tanks  shall  be  installed  In  compliance  with  manufacturer's    			f,      Fiberglass  pipe  adhesive  shall  be  as  recommended  by   			Southbend  Leak  Detector,  Amway LOCHigh  soop  or  equal		21.    Replace  or  restore  any existing  site  condition  damaged  or       	14.    Conduit  Support:  Conduit  shall  be  supported  at  inter-
<br />      																				printed  requirements.  												pipe  manufacturer.   										using  a  garden  type  hand  pump  sprayer.    Isolate  pipes    			altered  during  the  tank  removal  and  Installation,  remove 			vols  not  exceeding  10  feet  with  a  support  not  more
<br />    				1.      Unless  otherwise  noted,  streets,  paths  or  other  paved       																																		from  tank.    Remove  extractable  elements  and  insert  Emco      		sheet  piling 												than  3  feet  from  the  outlet  and  at  any point  where
<br />     																			5.      As  a  minimum,  excavation  shall  have  12  inches  clear  at       				Install  fiber  lass      in    in  accordance  with
<br />     					areas  in  which  the  surface  is  removed,  broken,  or  																				9.       		9	P P   9     									Wheaton  #491723  test  plugsit  changes  in  direction.    Conduit  placed  aga'rost
<br />     					damaged,  or  In  which  the    round  has  coved  in  or  settled    			sides  and  bottom  and  a  minimum  burial  cover  of  3  feet       				manufacturer's  requirements;  do  not  intermix   																		ELECTRICAL   													concrete  or  masonry  above  ground sholl  be  fastened
<br />     						9 				9    									and  a  maximum  of  5  feet.											fiberglass      In    systems.      							3.      Test  j/3:   Secondary piping  shall  be  air  pressure  tested  of
<br />     					due  to  the  installation  of  the  Improvements  shall  be      																					9	piping 9   Y 										5  psig  for  one  hour  and  soaped  as  noted  in  Test  ry2.    Air  																	to  the  concrete  with  pipe  straps  or  one-screw  conduit
<br />     					resurfaced  and  brought  to  the  original  grade.    Pavement																																		pressure  shall  be  maintained  until  after  backfilling   			1.      Work  shall  conform  to  the  following  codes: 						clamps  attached  to  the  concrete  by means  of
<br />     					replacement  shall  be  in  kind  subject  to  the  following7      As     minimum,  0  12  inch  bed  of  backfill  material  shall  be  		2.      Steel  Piping 																																										expansion  anchors  and  screws.    Expanders  and  shields
<br />						p						1   								placed  in  the  excavation,  leveled  and  smoothed.      																				operations  are  completed.    									o.      NFPA  70  -  National  Electrical  Code  						and  bolts  shall  be  such  that  the   p
<br />     					minimum  pavement  sections:       																																																																											proof  test  load  will
<br />																																				o.      Protect  steel  pipe  and  fittings  against  damage  to  the		4.      Test  //4:   When  required  by local  code,  perform  o  5  psi     			b.      Unifolrn  Building  Code,  latest  edition 						not  be  less  than  four  times  the  actual  working  load.
<br />     					0.      Streets  and  Other  Areas  Subject  to  Vehicular  Traffic:  		8.      Tanks  within  12  feet  of  building  foundations  or  where  soil       				protective  coating/wrapping.    								test  on  the  system.  Cap  primary product,  return  or 				C.      Occupational  Safety and  Health  Act  (OSHA)
<br />      						3  inch  asphalt  concrete  over  12  inch  aggregate  base  			conditions  are  unstable,  contact  Pacific  Bell  to  determine      																		vapor  and  vent  lines.  Pressure  system  for  one  half    					Standards
<br />       																				if  shoring  or  alternate  excavation  methods  should  be  used   			b.      Galvanized  for  gasoline  or  Black  Iron  for  diesel,Schedule       		hour  minimum  at  5  psi,  soop  oil  joints.      						d.      Uniform  Fire  code									15.    Conduit  bends,  other  than  factory  ells,  shall  have
<br />      						material.      																												40   ASTM  A-120   Steel  Pie  with  300  pound  Molleoble 																																a  radius  of  not  less  than  ten  times  the
<br />       																																					(    		)      	P   		P    																				e.      CCR  Title  23
<br />     																			9.      Approved  backfill  materials: 											Iron  Fittings.  Do  not  use  standard  couplings  normally 		5,      Test  #5:   Prior  to  placing  finish  yard  materials,  conduct  a 			f.      Cit   or  Count   C  										internal  diameter  of  the  conduit.
<br />     					b.      Asphalt  Paths  and  Walks.   1  1/2 to  inch  asphalt     																																																			y		y   odes  as  applicable.
<br />      						concrete  over  4  inch  aggregate  base  material.																					furnished  with  the  pipe.  									state  certified  precision  leak  test  (Horner  E-Z  Check  or
<br />       																				a,      Pea  grovel;   A  clean,  naturally rounded  aggregate  with    										,, ! , 							approved  equal)  of  the  entire  system.    Test  shall  be      		2,      Electrical  materials used  on  this  project  shalt  be  new  and       	16.    Conduit  Protection:   Cap  conduit  during  construction
<br />    				2.      Before  resurfacing  material  Is  placed,  pavement  edges
<br />																						on  1/8  Inch  minimum  and  a  3/8  maximum 					C.      Pipe  wrapping:  Underground  steel  portions  of  pipe  end 			conducted  using  fuel.    No  staking,  probing  or  baring 				free  from  defects  and  shall  conform  where  applicable,  to			by means  of manufactured  seals.    Swab  out
<br />     					shall  be  trimmed  bock  far  enough  to  provide  clean,  solid      				throngdiameter.     8   to  3%  of  the  particles  may pass     					risers  shall  be  wrapped  with  two  layers  of  Cal  Ito,       			allowed  after  test. 																				PP
<br />																																									PP       		Y		P� 																			the  following  standards,  unless  otherwise  noted.       				conduit  before  putting  in  wire.
<br />     					faces  and  shall  be  free  of  an   loose  material,    Trenches      				through  a  g8  sieve,   											approPolykved
<br />   																																						n  94q   Scotchwrop  50  (10  mil.  tape)  or
<br />     											Y 																																						6.      Test  p6:   Water  test  sump  for  four  hours  after  penetrations 																17.    Pullin       No  oil,    reuse  or  similar  substances  shall  be
<br />     					shall  be  sowcut  6  inches  back  from  side  of  trench. 																					approved  equal,  2  inches  wide  with  i/2  inch  spiral  lap.     																	a.      NEMA  -  National  Electrical  Manufacturers  Association.      			9'' 		9
<br />       																				b.      Approved materials  shall  be  dr   and)  comply with    																			hove  been  sealed  to  verify  water  tightness.    Check  for 																		used  to  facilitate  the  pullingin  of  conductors.
<br />																						ASTM  C33,  Para,  9.1  for  quality  and  soundness.     																			seepage.    If  none,  remove  water  using  a  hand  pump  and			b.      ANSI  -  American  National  Standards  Institute
<br />    				3       Subgrade:   The  top  6  Inches  of  subgrade  under  areas  to  be   									q      y     							d.      Cut  steel  pipe  with  r  hand  or  power  or  power    																			C.      UL  -  Underwriters  Laboratories,  Inc.  						Use  a  UL  approved  wire  pulling  compound.    No
<br />  																																																			install  leak  detector  and  pour  pea  gravel  backfilling      																		wire  or  Coble  shall  be 								'
<br />     					paved  shall  be  scarified  and  compacted  to  95%  of  the    																				operated  pipe  cutter,  as  in  normal  fitting  practice,     																																					pulled  n   until  construction
<br />      																			10.    In  wet  hole  installations,    um    hole  continuously and      																			materials  around  sump.    																								which  might  damage  insulation  or  fill  conduit  with
<br />     					maximum  density determined  in  accordance  with  ASTM									pump    			Y     						Steel  pipe  ends  shall  be  reamed.       																				3.      The  extent  of  the  electrical  work  includes  but  is  not  limited  				9     	9
<br />     					D1557provide  geotexliles  fitter  fabric  lining  at  bottom  and  sides    																	7.      Test  #7:   Perform  o  line  block  and  drop  lest  as  follows:    			to  the  following  items;										foreign  materiels  is  completed.    Wire  shall
<br />       																				of  excavation,  Mlrofi  140N  or  approved  equal. 						e.      Threaded  joints  shall  be  reamed  and  have  clean  cut,     																																be  pulled  into  conduits  with  care  to  prevent
<br />  																																					Intact  threads,  made  up  with  non--hardening  joint -      			o.      A  liquid  blockage  test  of  all  vapor  piping  from  each 			a,      Provide  receptacle  outlets,  pull  boxes,  switches,  wire,      		damage  to  insulation,    Use  basket  pulling  grips
<br />    				PRE-CAST CONCRETE     																																																												P
<br />      																			11,    During  Installation  maintain  factory applied  pressure  or    					compound  insoluble  In  petroleum  products.     						dispenser  to  Its  underground  tank  to  insure  adequate       			circuits,and  liquid  drainage.   															accessories
<br /> 																																																																											anchors  and relays,  conduits  with  supports,    					to  ovoid  slipping  of  insulation  on  conductors.
<br />    				1.      Precast  concrete  decant  shall  be  farmed  to  size  as  noted			vacuum  test  on  the  tank  annular  space.    Prior  to  covering    																			line  slopesleeves,  additional  materials  and  accessories  as      			Nylon  rope  or  other  "soft"  surface  Coble  must
<br />     					on  Drawings.    Provide  lifting  lugs  of  minimum  #6  rebar  at
<br />       																				taor a
<br />  																																																			b.      A  pressure  drip  versus  flow  rate  test  from  each  nozzle				q 			P       		9
<br />       																				tanks  perform  tests  as  required.      								f.      Joint  compounds  shall  be  Gilbarco  Rectorseal,       																				required  fcomplete  functioning  installation.    Alarm  		be  used  for  pulling  in  conduits  other  than  steel.
<br />     					4  feet  on  center,  minimum  of  2  lugs,       																							Permotex  57  or  equal,  non-hardening,  fuel  resistant,    				to  its  associated  underground  tank.    							unit  and  bell.
<br />    				2,      Concrete  shall  be  reinforced,  minimum  4,000  psi.    Provide    																	3,      Interior  surface  of  pipes  and  fitting  shall  be  free  from  dirt,  			c.      A  pressure  decay/leak  test  of  each  product's  vapor 			b.      Install  owner  furnished  TLS-350 						18.    Connections:    Stranded  conductors  No.  8  and  smaller
<br />    																																																																									panel  sensors  and  probe,       	shall  be  terminated  with  terminals  of  appropriate
<br />     					Pacific  Bell  with  factory  test  results  of  concrete  strength   		SUMPS															scale,  metal,  fiberglass  particles,  etc.  before  connecting.					control  system  including  nozzles  and  underground																										pp opriate
<br />   																																																				tunks,  where  required  by local  authorities.       			4       Breakers:   Voltage  as; re  uired.    Manufacturer  sholl  be  the			size  where  connected  to  screw  type  lugs.    Joints,
<br />     					prior  to  installation.    Cracking  or  chipping  of  concrete  shall 																																																			9   	q     									splices  and  tops  in  dry  locations  for  conductors  No.
<br />     					berounds  for  rejection.									1       For  tank  fill  sump,  secure  sump  riser  to  containment  collar 		4.      Fuel  piping  shall  be  pitched  upward  continuously  from  			UNDERGROUND  TANK  REMOVAL  PROCEDURE  							some  as  the  panel  board  or  switchboard  in  which  they are
<br />   						9     		1    											(which  is  furnished  with  tank)  as  recommended  by  sump      			annular  space  end  a  minimum  of  1/8  inch  per  foot;  1/4  Inch  																	mounted.    If  two  or three  pole  breakers  occur  in  the      			8  and  smaller  shall  be  made  with  twist  on  connectors
<br />    																																																																																suitable  sized  for  the  number  and  gage  of  the
<br />       																				manufacturer.    												per  foot  for  suction  vent  and  return  piping.    Traps  or sags		L      Contractor  shall  call  U.S.A.  and  have  utilities  field  marked 			panels,  they  shall  be  common  trip  units     Single  pole
<br />    				CAST-IN-PLACE  CONCRETE    																																																																						conductors.    Furnish  and  install  proper  lugs  In  panel
<br /> 																																				will  not  be  permitted     Group  piping  and  locate  as  shown    			prior  to  any  excavator.    In  addition,  Contractor  shell  make     		breakers  with  tie-bdr  between  handles  will  not  be    				boards,  switchboards  and  gutters  as  required  to
<br />    				I       Comply with  requirements  of  ACI  for  cost-in-  lace      			2.      Penetrations  to  tank  fill  sump  shall  be  sealed  using  method 			on  the  plans.    Lines  are  to  be  laid  straight,  using  fittings   			visual  and  magnetic  inspection  of  work  area  for  any				accepted.    Breakers  shall  hove  toggle,  quick-make,  and  			properly Y 			y 			paralleled
<br />   						p y     	q 						p      																																																		quick-breok  operating  mechanisms  with  tri    fr  					o   era    terminate  ever   cable.    Where
<br />     					concrete,   													recommended  by sump  manufacturer.      							for  directional  and  elevation  changes.     							possible  underground  utilities  and  conduits.    Contractor  Is			a     		P	9       			trip-free  feature  to
<br />  																																																			responsible  for  restoring  any  underground  utilities      				prevent  contacts  being  held  closed  against  over  current  			conductors  or  conductors  of  large  sizes  are  to
<br />    				2.      Forms  shall  be  new  materials  of  Douglas  Fir,  Construction   		3       Water  test  sump  for  four  hours  after  penetrations  have       		5.      Do  not  support  piping  with  foreign  objects,  such  as  strops   			damaged  during  construction.       								conditions  in  the  circuit.    Trip  position  of  the  breakers  shall   		terminate  on  a  breaker,  a  short  length  of  copper
<br />     					Grade,  SIS2E,  or  Douglas  Fir  Plywood,  five-ply.  5/8  inch,     			been  sealed  to verify  water  lightness.    Check  for  seepage;   			of  wood,  pipe,  etc.    Where  piping  posses  through,.existing  																		be  clearly  indicated  by  movement  of  the  operating  handles     		cable  (of  capacity  of  the  breaker)  shall  be
<br />     					B-B  Plyform,  Class  1  Exterior  Type  with  mill-oiling  treatment      		if  none,  remove  water  using  a  hand  pump  and  install  sump 			materials  gasket  with  resilient  materials.    Where  block  iron 		2.      Notify Pacific  Bell  Facilities  Engineer,  Site  Contact,  and  US.A.   		to  the  center  position,										connected  to  the  breaker,  and  the  proper
<br />       																				monitoring   robe.      											pipe  is    rimer    support  primary      in    Inside  of  secondary    																																compression  type  lug  installed  to  connect  this
<br />      					omitted.   															9  P													P	primary,     PP      P	Y P P   9       			Y  			(800)  642-2444,  forty-eight  (48)  hours  prior  to  start  of    																	cable  to  the  feeder  cable.    The  cutting  of  cable
<br /> 																																				containment  piping  with  blocks  of  neoprene  at  a  minimum   			tank  removal  or  any excovotlon. 							5.      Rigid    Steel  Conduit:.   Comply  to  Underwriter's  					strands  to  fit  the  breaker  will  not  be  permitted.
<br />    				3.      Reinforcement,   ASTM  A615.  Grade  40  for  bars  No.  4  and    		4      For  3,000  gallon  tanks  which  are  64  inches  in  diameter,       			of  5  feet  on  center.      																									Laboratories  Li  specification,  ANSIC80.1  and  Federal    			Copper  to  aluminum  connections  of  bus  bars
<br />      					smaller.      													change  42  inch  diameter  reducer  sump  to  38  inch      																																		specification  WW-C-581  or  latest  revisions.    Hot  dip
<br /> 																																																		3.      Fuel  in  existing  underground  tank  shall  be  removed																			and  lugs  shall  be  made  using  bellevitle  washers
<br />       																				diameter  bottdm  by 33  inch  diameter  top  tapered       			6.      for  bedding  of  piping  runs  and  backfill  of  pipe  trenches,    																		galvanized  on  the exterior.    Zinc  or  enamel  on  the  interior.
<br />  																																																			and  disposed  by Pacific  Bell     																							and  flat  washers  to  compensate  for  differing  rates
<br />    				4      Concrete:   Read mixed,  ASTMC94,  or  job  mixed     Cement.      			containment  sump  and  Tiny,     									refer  to  other  portions  of  these  specifications.    																				Couplings,  locknuts, .and  other  fittings  shall  be  galvanized Y  				J  																																																																			of  thermal  expansion.    Only crimping  tools  approved
<br />      					ASTM   atter   Type  II,    Aggregate:  ASTM  C33,  clean  and 																																																	or  sheardized,  waterproof  and  threaded  type  only.
<br />      																			RISERS  AND  ASSOCIATED  PIPING       								7.      Fiberglass  to  steel      e  connections.    Fiberglass  threaded-  		4.      Engineer  will  apply  for  and  pay  for  tank  removal  permits.      																	by  the  manufacturer  to  the  terminals  or  lugs  shall
<br />      					dry.    Water   Potable,  clean,  from  domestic  source,    Curing  																			9      		pipe				9    																																			be  used.    Non-insulated  if   s  and  wire  ends  shall
<br />      					Compound:   Liquid  membrane,  ASTM  C309,  Type  1.  																				end  adapters  are  to  be  threaded  Into  the  steel  pipe or       			Contractor  Is  responsible  for  arranging  inspections.    All  tank  	6.      Outlet  Boxes:   Gal venized  steel,  boxes  installed  In  any   									9
<br />      					Curie    Sheet  Meteriol:   ASTM  C171. 							1.      Underground  steel  portions  of  pipe  and  risers  ,  including				fitting  before  bonding  onto  the  fiberglass  pipe.      					and  piping  removal  is  by  Contractor.    Contractor  shall     			exterior  location,  where  exposed  to  rain  or  where  exposed       		in   insulated  with  layers  of  plastic  tape  equal   rl
<br />     						9														one  located  in sumps,  shall  be  Wrapped  with  two  layers  of   																		cooperate  with  "Environmental  Contractor"  for  soil  woter      																	insulation  of  wire,  with  irregular  surfaces  properly
<br />      																								p			pp			y      																													/  				to  moisture  laden atmosphere  shall  be  cost  screw  hub  type
<br />    				5.      Batch  and  mix  concrete  in  accordance  with  ASTM  C94  at     			Colpico,  Polyken '940     Scotchwrop  50  (1(0  mil,  tape)  or 																			sampling  and  disposal  of  tank.    								with  gosketed  weatherproof  covers.    Boxes  for  vapor       			padded  with  insulation  putty prior  to  appllca tion
<br />       																				approved  equal,  2  inches  wide  with  1   2  finch  spiral  la  																																		proof    													of  tape.    Splices  in  underground  pull  boxes  or  in
<br />      					an  established  plant,  or  job-mix.    Mix  concrete  in  quantity   			pP    	q					/      	P 	p															;       																		p   of  or  explosion proof  applications  shall  be  designed
<br />       																																		8.      Flexible  connectors    Flexible  connectors  for  cannot GTa  of   		5.      Provide  fire  extinguishers  of  size  and  roan    specified  b 																		other  areas  subject  to  moisture  shall  be
<br />      					for  Immediate  use,    Do  not  re-temper  or  use  set  concrete. 																		fuel  return  and  vent      in    at  tanks  may be  used  in lieu  of  						9					9   p      	y   			specifically  for  such  use.     									provided  with  cast  resin  kits.    Prepare  splices  as
<br />      																			2      Connections  to tank  risers  shall  flexible  connectors.  									ed   9      		Y      						local  fire  departments.
<br />      ' 																				No  direct  connections  allowed.  									swing  saints  if  approved  by  local  jurisdiction.   																																			specified  before  resin  kits  are  applied
<br />    				6.      Concrete  shall  be  regular  weight,  145  pfc.    Minimum  28-day      																																														7       Where  applicable,  pall  boxes  and  cabinets  shall  be  pre-
<br />     																							1   																										6.      There  shall  be  no  welding  or  other  sources  of  ignition  in   			fabricated  concrete  type;  Christ   Concrete  Products,
<br />      					compressive  strength  at   slob  on  grade  shall  be  for  r   minimum       																																																		Boxes    	y       						19,    Systems  shall  test  free  from  short  circuits  and
<br />       																																		9.      All  lines  shall  be  located  as  shown  on  the  buildingthe  area  while  the  removal  operations  are  In  progress.     			Brooks  or  equal    Boxes  shall  have  standard  brass  hold-  			Y
<br />      					psi.    Maximum  aggregate  size  shall  be  3/8  inch  for  regular-    	FUEL  PIPING       													drowin    and  shall    rade  down  to  tank.  Identify lines es     				There  shall  be  no  smoking  on  the  job  site.    ' NO 							q												grounds  and  be  free  from  mechanical  and  electrical	-
<br />      					weight  concrete.    Maximum  slum    shall  be  4  inches.       																				9  		9  					Y      										9      	1   							down  bolts  and  hardware.    Boxes  located  in  paved  areas
<br />  						9       					P											I   												with  brass  engraved  togs  at  both  ends. 							SMOKING'   signs  shell  be  posted.      																						defects.    Circuits  shall  be  tested  for  the  proper
<br />       																																						g     	g      					;      						9    		P   									or  the  areas  over which  vehicles  normally may  travel  shall
<br />     				7      Design  and  construct  formwork.    Forms  shall  be    					Comply with  the  following  requirements: 																																					have  traffic  covers.      										neutral  connection  and  rotation  of  motors.    Where
<br />    																							o       																																																								tests  Indicate  fault   installation  or  other  defects,
<br />      					substantially built  and  of  sufficient  strength  and  rigidity  to  																	10.    The  foot  valve  shall  be  removed  from  the  tank  with  the  full			Provide  barricades  with  (lashing  yellow  lights  and  warning     																					Y
<br />       																				o.      CCR  Title 19,  State  Fire  Marshal.      																						signs  to  protect  pedestrians  and/or  motor  vehicles  from		8.      Relays  for  pumps  and  generator  shall  be  heavy  dui   type			they shall   tr  located,  repaired  and  retested
<br />      					produce  finished  concrete  of  the  precise  size,  Shope  and      																		length  of  extractor  pipe  in  place  In  presence  of  telephone       																		Y 	P     P  	9    				Y       Y				at  the  Contractor's  expense.
<br />      					location  indicated      											b.      CCR  Title 8.  Industrial  Safety Orders.      						company representatives. 										work  area  and  tank  hots.     									safety switches  as manufactured  by  G.E .  Westinghouse,
<br />																																																																																					P
<br />       																				c.      American Petroleum  Institute  (API)  Standards  for															-																			Cutler-Hammer,  Gould  or  Square  D.    Furnish  with
<br />     				8      Finish  shall  be  medium  broom.    Keep  surfaces							double  wall  tank  installations. 							11.    If  Pacific  Bell  Engineer  has  required  total  containment  			8.      Droin,  and  when  appropriate,  flush  product  in  the  piping   			enclosure  suitableforapplication.    Provide  fused  type     		20.    Electrical  contractor  shall  refer  to  latest  issue  of
<br />      					continuously damp  for  twenty-four  hours     Curing  is    				d.      Materials; fabricotion  and  testing  shiall  conform  to 				'Enviroflex"  product  piping  to  be  installed,  see  Sheet P-3.E 			into  the  tankwhere  indicated  or  required  by  code.    Motor  starters  shall       		Veeder  Root  installation  instruction  prior  to
<br />      					intended  to  maintain  water  for  proper  hydration  and  to 					stondard§ -of  NEMP,  IEEE,  NFPA,  UL.  and  USAIA.    				for  additional  piping  specifications.       																						be  disconnect  switch  type  complete  with  three  overload   			starting  work.
<br />       																				e.      National  Electrical  Code,  NFPA  70.   																					9.      The  Rinse  Contractor  shall  remove  all  remaining  flammable       		relays  and  enclosure  suitable  for  application,  G.E.,
<br />      					minimize  temperature  ranges.    Procedures  shall  be 																																			liquid  from  the  tank  which  can  be    								Y
<br />																					It.      CCR  Title 24,  Part  3,  State  Electrical  Code.      																				q      						pumped  out.    It  may  be     		Westinghouse,  Cutler-Hammer,  Gould  or  Square  D.
<br />      					consistent  therewith  as  for  as  practical  and  within  scope     				CCR  TRIS  24,  Part  5,  State  Plumping  Code.  				BEDDING  AND  BACKFILL     											necessary  to  use  a  hand  pump  to  remove  the  bottom  few
<br />      					of  work  specified.      											9'								9
<br />       																				h.      NFPA  30 and  31.       																									inches  of  product  and  rinsate.    All  residual  liquid  or  sludge,   	g,      Conductors:   Unless  specifically noted  otherwise  herein,
<br />       																					Required   ark  labeling,  UL  58. 							1.      A  4  inch  minimum  bed  of bockfill  material  is  to  be   laced   			including  rinstote  will  be  disposed  by  Environmental  Contractor.		conductors  for  general  wiring  shall  be  a  minimum  of  987
<br />     				9.      Defective  ctional     shall    to
<br />  											repaired  or  replaced  as  directed    				9   			9•   																				P 																						9  		9
<br />      					at  no  additional  expense  to  Poclfic  Bell. 							j.      CCR  Title 23;  Wolter  Resources  Control  Board. 					in  piping  trenches.    Smooth,  compact  and  slope  bedding   																		conductivity,  stranded,  soft  drown  copper,  No.  10  and
<br />       																				k.      Requirements  of  local  authorities,    							material  to  allow  a  slope  of  1/4  inch  per  foot  toward  the  		10.    Sowcut  and  remove  concrete  or  A.C.  cover  for  access  to  			smaller  shall  be 600  volt,  Type  THWN.
<br />     				UNDERGROUND  FUEL  STORAGE   										I,      Local  fireandhealth  departments,    							tanks.    In  extreme  conditions,  1/8  inch  per  foot  may be     			tank,  dispose  of  concrete  and  A   .  debris.
<br /> 																																				used  if  approved  by Pacific  Bell. 																						10.    Connections:   #8 and  smoller,  pre-insulated  spring  type
<br />      																			I       Fiberglass  Pi       																										11.    Shore  the  edge  of  the  tank  hole,  if  required.    All  shoring  is     		connectors.    Threaded  or  trim    types  will  not  be  accepted
<br />     				1.      Comply  with  the  following  requirements. 								9   	py																																																P      				p
<br />																																			2.      Piping  shall  be  placed  on  prepared  bed  in  such  a  manner  as       		to  be  in  place  before  excavating  tank							Use  SkotchlOC<,  Hyder3,  T&B  or  equal,    Terminals  for
<br />      					o.      CAC  T,i;Io  19,  State  Fire  Marshal.    							o.      Protect   berglass  pipe  and  fittings  against  abrasion      			to  minimize  paints  at  which  one  pipe  may cross  over																			strcnded  conductors  No,  8  and  smaller  shall  be  a  pre-															-
<br /> 																						from  sh(r    or  hard  objects;   impact  damage  from       			another      e    At  points  where      in    must  cross  over,  a   		12.    Dig  down  to  the  top  of  the  tank. 								Insulated  crime   type.    Lugs  and  connectors  for  conductors
<br />	i     				b.      CAC  Title  8,  Industrial  Safety (Jrders.      									P   		1     	P       	9							pipe. 	P    		piping																									P   )'P  	9
<br />      					c.      Americon  Petroleu-i  Ins-.,tute  (AP')  S':cndcrds  for   					imp^ape  storage,  tronsport,  laying  or  backfilling,  				minimum  of  1  1/2  pipe  diameter  shall  separate  the  pipes,  		13    Remove  the  fill  (drop)  tube  and  TLS  probe.    Disconnect  the     		No.  S  and  Icrger, shall  be  compression  types  of one  piece
<br />       						double  AGI;  tong  ,nstra!;aLcns   									Inspect  dipe  for  damage  prior  to  using  in  the  piping     																		fill,  gouge,  and  product  and  vent  lines.    Cap  or  plug  open       		tubular  construcl,Von  with  flat  rectangular  tongues,    Two
<br />      					d.      Materials,  fabrication  and  testing  shell  conform  to 					system. (Protect  piping  from  prolonged  exposure  to   		3.      Approved  backfill  materials:      									ends  of  the  lines  whi-h  are  not  to  be  used  further.  				hole  lugs  shall  be  used  for  sizes  4/0  and  larger.    Fittings
<br />       						standards  of  Ni  IEEE,  NFPA,  UL  and  USAIA.     					ultraviolet  light. 																										Remove  any  remaining  liquid  from  the  delivery  line  using  			for  copper  ccnduictors  shall  be  tin-plated  copper.    Cost						sEnu rf7 u�  Jc n'. ENGmEER
<br />      					e.      National  Electrical  Code,  NFPA  70.										1  												o.      Pea  gravel:  A  clean,  naturally rounded  aggregate with  			using  care  to  avoid  spillage.
<br />																																																																		resin  kits  shall  be  Skotchlock  sealing  pocks  for  wire  size  to
<br />       																				b.      Primary   rid  secondary  pipe  and  fittings  shall  be  UL    																			9c   										LIQ  RCB6RT  o 1.  L2S  A ASSOCIATUS   INC.
<br />     									Part  3,  State  Eleclriccl  Code.      																					an  1/8  inch  minimum  and  a  3/8  Inch  maximum       																		r#10ecommended
<br />       																																																																		and  Sked  byJck  kits  for  larger  splices  as     														r
<br />      					I.      CAC  Title  24,      												approved; non-metallic,  100%  alcohol  and  methanol     																	74.    Plug  all  tank  openings  with  one  plug  to  have  1  8  inch  vent
<br />      						CAC  Title  24,  Part  5,  State  plumbing  Code,     																					diameter    Up  to  3%  of  the  particles  may pass through 			9p   g 		/					recommended by 3M  Company. 											T�       	ter' uv.N°     	ENA`
<br />      																																																																																									EERINQ
<br />      					9 								9      							compatible,  for  underground  piping  of  petroleum    					a    8  sieve.      											hold  for  temperature  expansion.  																								sX ro.,.xon's� ,n.m.       .-E,ravw ca   �       I>o» ,�,  a
<br />      					h.      NFPA  30  and  31.       											products[   The  primary pipe  shall  have  bell  and						#  																															'   												.nr w. .u�na�a,*rc*  		.v.�es Knnr.ov eix�s,
<br />    		N       		i.      Required  tank  labeling,  OL  58    									spigot  0  threaded  and  bonded   oints.    Secondary       																	15.    The  tank  shall  be  'nerted  b   usin    thirt     aunds  of  dr   �c       	ii.    Grounding  and  bo' ding:   The  entire  electrical  system  shall
<br />  																						P 9     					1   			Y     																						6..-----X---B�x-E'--
<br />      						CAC  Title  23,  Water  Resources  Control  Board.  																				b.      Approved  materials  shall  be  dry and  comply  with 															Y'^'�       		form  a  continuo  s  metallic  electrical  conductor  from
<br />    		an       		j 																piping  s "alt  have  flanged  and  bolted  joints.    Ciba-       																		per,  thousand  gallons  of  tank   opacity or  as  required
<br />    		o       		k,      Requirements  of  lanai  authorities.      																							ASTM  C33,  Para,  9.1  for  quality and  soundness. 																			service  point  to  every outlet  and  shall  be  grounded  by
<br /> 																						Gedgy,   ,    oy 3,000  Pipe  System,  Smith,  Red  Thread   																		by local  authorities.      										connection  to  the  main  service   round.    Electrical  systems,
<br />    		.n       		I.      Local  fire  and  health  departments.    								II  Pipe  System,  or  approved  equal.  																																								as			9       			Ys
<br />    		m 																																PIPING  TERMINATION  SUMP       									16.    After  tank  has  been  inspected  by  local  health  and  fire      			supports,  cabinets,  control  equipment,  motor  frames  and
<br />    		m																		c.      Cut  fibertlass      e  with  a  fine-toothed  hacksaw  blade
<br />     				Z.      When  lifting  or  moving  tanks,  always  use  adequate  sized     						9       pipe     																									inspectors,  excavate  and  remove  tank  and  piping,      				utilization  appar  lus  shall  be  permanently  and  effectively
<br />    		n       		equipment  and  lift  by lifting  lugs  and  use  a  spreader  bar  to				or  an  abrasive  wheel  on  a  circular  power  sow.    Use  a       	i.      Piping  shall  terminate  in  200  mil.  thick  polyethylene  sumps.  			Contractor  to  toad  tonk  and  piping  on  transport  provided 			grounded,   	t
<br />      					ensure  a  lift  angle  of  at  least  45'  at  each  lifting  lug.    Each				saw  guide  or  "Wrap  Around"  to  ensure  a  square  cut    																		by  others.    Disposal  of  tank  and  piping  by Enviro.  Contractor   					j
<br /> 																						end.    Cul      e  end  must  be  within  1   8  inch  of  square.     	2.      Seal  penetrations  in  sumps  with  bulkheads  per  sum
<br />    		n       		tank  shall  have  a  minimum  of  two  lifting  lugs.    Do  not  set   						PP      				/  		q     				P      			P    			P   	P    				Contractor  to  remove  and  dispose  of  existing  concrete   		12     Conduit  Applieatl6  :  Minimum  size  of  conduit  shall  be  i/2
<br />      					I  with  less  than  two  lifting  lugs.																							manufacturer's  recommendations.    								tie-down  slab  beneath  tank  if  specified  in  Scope  of  Work			inch.    In  no  cosrshall  the  conduit  size  be  smaller  than  that
<br />																					d.      Tapering and  reaming:  Cut  fiberglass  pipe  ends  shall     																		on  sheet  P-1.       											shown  on  the drawings.    Boxes  installed  indoors  or			rvO.     		REVISIONS / AUTHORIZATIONS     		DATE    BY
<br />     				3,      Protect  tanks  against  abrasion  from  sham    or  hard  ob eats,   				be  tapered  using  standard  tapering  tools  available      		3.      See  Test  q5  for  sump  test.   																								imbedded  in  concrete  shall  be  galvanized  steel  type.
<br />       								9					P   		1  																																	17.    After  the  existing  tank  Is  removed,  soil  and/or  water
<br />      					impact  damage  from  improper  storage,  transport,  laying  or   				from  the pipe  manufacturer.    Protect  pipe  during       																																	Boxes  installed  6posed  or  outdoors  shall  be  gclvcnized								/'�
<br />  																																																			samples  will  be  taken  from  the  tank  hole  by  the     																				SPECIFICATIONS
<br />      					backfilling.    Protect  steel  pipe  and  fittings  against  damage   				tapering'to  prevent  damage  to  pipre.    The  finish  taper       	TESTING   																													cost  steel  with  thread  hubs.    Branch  circuit  conduits  under   				f
<br />  																																																			Environmental  Contractor,    If  contamination  is
<br />      					to  the  protective  tooting  or  wrapping,    Protect  tanks  from   				shall  be;^,mouth,  clean  and  free  from  surface  defects.       																																slab  shall  be  separated  by at  least  one  inch.    In  cases
<br /> 																						The  length  of  toper  for  2  inch  diameter  is  1  5/8  inches   	1       Test   1:  Primarysuction  and  return      es  shall  be  tested     			discovered,  Contractor  to  notify Pacific  Bell  Project  Manager    		where  two  or  more  conduits  are  installed  in  a  common
<br />      					prolonged  exposure  to  ultra  violet  light.       									y     	P						/    											pipes      						immediate)    Contaminated  soil  is  to  be  stacked  separately and  ford  inch  diameter  pipe  is  1   3/4  inches.    For  other   		to  26  inches  of  vacuum  for  ahalf-hour  minimum  duration  					Y�								P 	Y      		concrete  encasement,  they  shall  be  separated  6y of  least 					DRAWINGS PREPARED FOR
<br /> 																						size  pi  e   																											on  visqueen  firmly  to  prevent  it  from  being  blown  off.
<br />	I    			4      Underground  fuel  tanks  shall  be  a  steel  primary  tank							p ,  consult  pipe  manufacturer's  instructions.       			without  pumping  and  in  the 		of  Pacific  Bell   																			three  inches.    Conduit  shall  be  securely  fastened  in  place
<br />  																																																			Provide  an  asphalt;  concrete  or  sandbag  berm  around  all
<br />      					meting  UL58  with  secondary containment  provided  by a      						'p  												company representative:																									so  that  absolutely  no  shifting  will  occur  during  placing  of 				PACIFIC [,,"J  BELL
<br />      					steel  fiber  loss  reinforced  plastic  composite  secondary 				e.      Fiberglass pipe  surfaces  to be  bundled  shall  be  cleaned 																		dirt  stack  piles (clean
<br />      																																																								runoff.  Disposal  of  all  tank      			concrete  encasement.    Joints  In  conduit  installed  in
<br />     						/      q   					p       		Y   																																		excavation  soil  (clean  or  contaminated)  will  be  by
<br />      					tank.    The  tanks  shall  Corry UL  label  approval  for  						with  solvent  as  supplied  by pipe  mlonufacturer.    If       			Suggested  procedure:       										Environmental  Contractorconcrete  or  exposed  to  weather,  shall  be  liquid  and  gas    					sacRnMENro, CALIFORNIA
<br />      					underground  motor  fuel  storage.    Tanks  shall  comply with     				tapered Section  is  wet  or  moist,  dry with  propane      																																	tight. 		2       									FACILITY ADDRESS
<br />      					ANSI  B137.1  and  NFPA  Standards  30  &  31,    Annular     					torch,      do  not  overheat  or  burn   the  pipe.    If    				a.      Tank  shall  be  vented  to  atmosphere  at  all  times,			18.    If  contamination  Is  discovered,  Contractor  shall  notify Pacific
<br /> 																						temperature  is  below  60'  F,  worm  'tapered  surfaces      																		Bell  Engineer  Immediately,    Contaminated  soil  is  to  be    		13.    Conduit  location:^   Exposed  conduit  shall  be  neat)   installed		2300   E.   EIGHT  MILE   ROAD
<br />      					cavities  shall  be  monitored  with  electronic  monitoring  						P						"   P  																																								P    					Y
<br /> 																						with  propane  torch,  -  do  not  overtheat  or  burn  ilio  pipe    		b.      Remove  foot  valve  and  ca    suction  line  at  bottom  of  			stacked  separately on  visyueen  and  covered  with 					arallel  to  or  at right  angles  to  the  structural  members
<br />      					equipment     Working  capacities,  openings  and 								P   P       								P P 									P  																							P   			9 	9
<br />      					appurtenances  shall  be  as  shown  on  Drawings.    Unused 					epoxy
<br />      																						fitting.    Bell  and  spigot  joints  sy  t   be  made  up  with       			suction  stub.    											visqueenEnvironmental
<br />    																																																					Disposal  of  contaminated  soil  will  be by   				Exposed  conduits. stubbing  up  through  the  floor  into  the   			STOCKTON    CALIFORNIA
<br />    		`D  																			e  ox   adhesive  as  recommended  b�   the  pipe 																				Environmental  Contractor.  Contractor  shall  load  contaminated   		bottom  ofex expo's'ed    oriels,  cabinets  orequipment  shall  be  							r
<br />    		a.       		tank  openings  shoal  be  tightly sealed  with  plugs  and  caps       				P    Y       					,Y	PP     																																					P 	P
<br />    		CR  																			manufacturer,    Adhesive  shall  be  mixed  thoroughly  in  			C.      A	26  inches  of  vacuum  to  suction  line  at    Dint  of 			soil  on  truck  provided  by Environmental  Contractor,   				line  dup,  properly spaced  and  shall  be  straight  and  plumb.
<br />    		o       		installed  in  accordance  with  manufacturer's																	9   Y 					PPY   								P    																				P.  s   ll    Y   P     				9
<br />    		Al       		recommendations.       												accordance  with  manufacturer's  instructions  and  shall   				connection  to  equipment     f       																						Conduits  shall  be  installed  at  sufficient  depth  below  the       						DATE     		DanwN Br.       SEf
<br />    		m  																			be  applied  to  both  surfaces.    Insert  the  spigot  end  into     																19.    If  hole  Is  left  open  overnight,  Contractor  to  completely  fence    		floor  to  eliminate  any part  of  the  bend  above.    Maintain  12
<br /> 																						the  bell beinga  slight  turnip    motion   one-half  turn  to     		d.      Do  not    	vacuum  to  tank  or  generator  engine.       			off  the  tank  hole  with  six  (6)  foot  high  temporary chain  			inches  separation  between    ower  and  intercommunication    			PROJECT ENGINEER CHECKED BY  J. Mc GRATH
<br />       																									9      	9       	(       								PPY  				9  		9																					P   			P
<br />  																																																			link  fencing,  no  exceptions.  A  lockable  gate  shall  be
<br />     		o  																			a  full  turn  is  necessary)  and  push.    Apply pressure    																																	cables.    Conduit  shalt  be  kept  at  least  6  inches  from  the   	E,T/RO NO.  			St+EET   6  	of   6	SHEETS
<br />    		Z       		Alternate:  Steel    rimar   tank  ass  ecified  above  with  a  																																		provided  on  all  excavations  left  open  more  than  2  days,
<br /> 									primary 		P 									until  mechanical  lock  is  achieved.    Back  axial  pressure       	2.      Test  �(2:  Primary pipe  shall  be  air  pressure  tested  of  75      			See  plans  for  location. 										covering  on  hot'. water  pipes  and  18  Inches  from  the    		APPROVED    			DRAWING NO
<br />    		0       		ILL   listed  secondary containment  and  corrosion  protection    				should  be  maintained  on  previously  assembled  joints   																																	covering  on  flues  and  breaching.
<br />      					jacket  of  high  density polyethylene.   									to  reduce  tle  chance  of separation,      																				20.    Upon  approval  of  Pacific  Bell  Facility Engineer,  Contractor  																						_
<br />    		Qshall  Install  new  tank.      																										MANAGER      Y					P-6
<br />
								 |