Laserfiche WebLink
ar �s <br /> ?,�,, BACKFILL EXCAVATION CERRTIFIC.ATE4�Utd��j'�.fAi F�EAI_TI1 <br /> � i P_ l <br /> Project Location Art44 �r� / <br /> Owner 1 PhtIAN s>�P*AW4gii�� <br /> Contractor - Phone No4Z?J),S' ) .5. License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) - <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> P. <br /> Name kyrun) <br /> * &fa tf <br /> n (Print ff <br /> * <br /> Signature <br /> I * Shall be the responsible managing employee on the license or authorized agent. <br /> o <br /> i W <br /> M <br /> tV TT <br /> r <br /> i <br /> I <br />