Laserfiche WebLink
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location <br /> Owner Phone No. <br /> Contractor Phone No. License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.p., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2)inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofpprcject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame rent <br /> u e rent <br /> f <br /> Signature <br /> " Shall be the responsible managing employee on the license or authorized agent. <br /> !I <br /> i <br />