My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
4520
>
2300 - Underground Storage Tank Program
>
PR0504070
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:45:13 PM
Creation date
11/4/2018 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0504070
PE
2381
FACILITY_ID
FA0006067
FACILITY_NAME
SJ OAK GROVE REGIONAL PARK
STREET_NUMBER
4520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
4520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\4520\PR0504070\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/27/2012 8:00:00 AM
QuestysRecordID
85465
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNF WATER RESOURCES CONTR BOARD <br /> FORM 'B': UNDE%GROUND STORAGE TANK PR0 RAM W <br /> TANK TANK PERMIT APPLICATION INFORMATION <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. 4 _ Z <br /> 10 <br /> MARK ONLY 1 NEW PERMIT F-13 RENEWAL PERMIT E]5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED TANK <br /> EM <br /> ONE ITINTERIM PERMIT ❑ 4 AMENDED PERMIT ❑6 TEMPORARY TANK CLOSURE ❑8 TANK REMOVED agk0 <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: FARM TANK-YES❑ NO <br /> 1. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN—SO SPECIFY OD <br /> 01 <br /> A. OWNERS TANK IDR B. MANUFACTURED BY: W <br /> C. YEAR INSTALLED D. TANK CAPACITY IN GALLONS: <br /> 11. TANK CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUM B. C. ❑ 1 UNLEADED ❑2 LEADED ❑ 3 DIESEL <br /> ❑ 3 CHEMICAL-PRODUCT ❑ 4 OIL ❑ 1 PRODUCT ❑4 GASAHOL ❑5 JET FUEL ❑ 6 AVIATION GAS <br /> ❑5 HAZARDOUS ❑ 80 EMPTY ❑ 95 UNKNOWN ❑2 WASTE ❑7 METHANOL ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.R C.A.S.N: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B.C,&D <br /> A.TYPE OF ❑ I DOUBLE WALLED ❑3 SINGLE WALLED WITH EXTERIOR LINER ❑95 UNKNOWN <br /> SYSTEM ❑2 SINGLE WALLED ❑4 SECONDARY CONTAINMENT ❑99 OTHER <br /> ❑ 1 STEEL/IRON ❑2 STAINLESS STEEL ❑3 FIBERGLASS ❑4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑7 ALUMINUM ❑8198%METHANOL COMPATIBLE FRP <br /> MATERIAL <br /> ❑9 BRONZE ❑ 18 GALVANIZED STEEL ❑95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR F—] I RUBBERUNED ❑2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING ❑ 5 GLASS LINING ❑6 UNLINED ❑ 95 UNKNOWN <br /> ❑ IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? ❑YES ❑ NO ❑99 OTHER <br /> D. CORROSION ❑ 1 POLYETILENE WRAP ❑2 TAR OR ASPHALT ❑3 VINYL WRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑5 CATHODIC PROTECTION ❑91 NONE ❑ 95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IFABOVEGROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLEWALLED A U 2 DOUBLEWALLED A U 3 LINED TRENCH A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> C. MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELCLAD W/FRP A U 8 100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 95 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 8 1 VISUAL CHECK P 8 2 INVENTORY RECONCILIATION P 8 3 VADOSE WELLS P S 4 ELECTRONIC MONITOR P 8 5 GROUND WATER MONITORING WELLS <br /> P S 6 PRECISION TESTING P S 7 PRESSURE TESTING P S 91 NONE P S 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1.ESTIMATED DATE LAST USED MO/YR) 2. ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING IN GALLONS INERT MATERIAL? DYES <br /> ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY R JURISDICTION R AGENCY R FACILITY ID R TANK ID R <br /> CURRENT LOCAL AGENCY FACILITY ID N APPROVED BY NAME PHONE N WITH AREA CODE <br /> PERMIT NUMBER PERMIT APPROVAL DATE _PERMIT EXPIRATION DATE <br /> CHECK# PERMITAMOUNT SURCHARGE AMT. FEECODE RECEIPT# BY: <br /> FORM B(6-29-ee) THIS FORM MUST BE ACCOMPANIE A FACILRY/SITE APPLICATION, FORM 'A',UNLESS A dMRENT FORMA' HAS BEEN F1 D <br /> DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.