My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
4520
>
2300 - Underground Storage Tank Program
>
PR0504070
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2021 10:45:13 PM
Creation date
11/4/2018 2:17:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0504070
PE
2381
FACILITY_ID
FA0006067
FACILITY_NAME
SJ OAK GROVE REGIONAL PARK
STREET_NUMBER
4520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
4520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\4520\PR0504070\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/27/2012 8:00:00 AM
QuestysRecordID
85465
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD <br /> FORM 'B': UNDERGROUND STORAGE TANK PROGRAM <br /> TANK TANK PERMIT APPLICATION INFORMATION <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. _ <br /> MARK ONLY ❑ 1 NEW PERMIT ❑3 RENEWAL PERMIT ❑5 CHANGE OF INFORMATION ❑7 PERMANENTLY CLOSED TANK <br /> ONE ITEM ❑2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 98 TANK REMOVED Q <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: J-JTFARM TANK-YES❑ NO N <br /> I. TANKOESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY N <br /> A. OWNERS TANK ID# I B. MANUFACTURED BY U[� cn <br /> C. YEAR INSTALLED �(_ D. TANK CAPACITY IN GALLONS. <br /> II. TANK CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑2 PETROLEUM B. C. ❑ 1 UNLEADED ❑2 LEADED ❑3 DIESEL <br /> ❑3 CHEMICAL PRODUCT ❑ 4 OIL ❑ 1 PRODUCT ❑4 GASAHOL ❑5 JET FUEL ❑6 AVIATION GAS <br /> ❑5 HAZARDOUS ❑ 80 EMPTY ❑95 UNKNOWN ❑2 WASTE ❑7 METHANOL ❑99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.# C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,&D <br /> A.TYPE OF ❑ 1 DOUBLE WALLED ❑3 SINGLE WALLED WITH EXTERIOR LINER ❑95 UNKNOWN <br /> SYSTEM ❑2 SINGLE WALLED ❑4 SECONDARYCONTAINMENT ❑ 99 OTHER <br /> ❑ 1 STEBUIRON ❑2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑4 STEEL CLAD W7FIBERGLASS REINFORCED PLASTIC <br /> IL TANK ❑5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑ 7 ALUMINUM ❑ <br /> MATERIAL 810096 METHANOL COMPATIBLE FHP <br /> ❑9 BRONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN ❑99 OTHER <br /> C. INTERIOR ❑I RUBBERLINEO ❑2 ALKYD LINING ❑3 EPDXYLINING ❑4 PHENOLIC LINING <br /> LINING ❑5 GLASS UNING ❑6 UNLINED ❑95 UNKNOWN <br /> ❑ IS LINING MATERIAL COMPATIBLE WITH 10096 METHANOL? ❑YES ❑NO ❑99 OTHER <br /> D. CORROSION ❑ I POLYETHLENE WRAP ❑2 TAR OR ASPHALT ❑3 VINYL WRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑5 CATHODIC PROTECTION ❑91 NONE ❑95 UNKNOWN 99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U i SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASSPIPE A U 91 NONE <br /> C.MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL CLAD W/FRP A U B 10096 METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 95 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 8 1 VISUAL CHECK P 8 2 INVENTORY RECONCILIATION P 83 VADOSE WELLS P 8 4 ELECTRONIC MONITOR P S 5 GROUND WATER MONITORING WELLS <br /> P 8 6 PRECISION TESTING P 5 7 PRESSURE TESTING P S 91 NONE P 8 95 UNKNOWN P 8 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1.ESTIMATED DATE LAST USED(MO/VR) 2.ESTIMATED QUANTITY OF3. WAS TANK FILLED WITH <br /> GALLONS <br /> SUBSTANCE REMAINING IN INERT MATERIAL? [-]YES [—] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANT'S NAME(PRINTED&SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY# JURISDICTION# AGENCY# FACILITY ID# TANK ID# <br /> CURRENT LOCAL AGMCY FACILITY ID# APPROVED BY NAME PHONE#WITH AREA CODE <br /> PERMIT NUMBER PERMIT APPROVAL DATE PERMIT EXPIRATION DATE <br /> CHECK# PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPT# 8Y: <br /> � 1 <br /> - 7RM 0 TB-r-�NNIS FORM MUST BE ACCOMPAN � A FACILITY/SITE APPLICATION, FORM 'A',UNLESS A RENT FORMA' HAS BEEN FILED <br /> f DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.