Laserfiche WebLink
AINLAY T ' NK TIGHTNESS TEST No. <br /> 10 <br /> INCLUDE ENOUGH INFO TO ACCURATELY IDENTIFY TANK.(NUM BE RI CONTENTS I POSITION, ETC.) <br /> TANK LD. �'1f <br /> TANK DIA6!E7ER -7A4 INS FILL PIPE LENGTH os'y TtiS <br /> 11 <br /> WATER IN lal START WATER IN TANK - (NS (q END WATER IN TANK INS <br /> TANK Ib)START WATER IN TANK GALS -(0)END WATER IN TANK L) GALS <br /> 12 <br /> PRODUCT (al NOMINAL CAPACITY GALS (0)DEDUCT WATER iN TANK GALS S m <br /> VOLUME (b)ACTUAL CAPACITY ` GALS (0)TOTAL PRODUCT VOL. !:_GALS N <br /> (FROM TANK. CHART) m c- <br /> 13 (a) HEIGHT OF WATER TABLE ABOVE TANK BOTTOM = N7)1. el INS <br /> (b, DENSITY OF TANK PRODUCT = Iwi LB;CU. IN. (FROM TABLES) ' <br /> FILL DENSITY OF EXTERNAL WATER = OD36 LBICU. IN. F <br /> PIPE (c, ADDITIONAL HEAD REQUIRED = IN 0.036 ■ 0036 _ _ INS <br /> EXTENSION <br /> T <br /> NOTE: _ <br /> TO AVOID POSSIBLE TANK DAMAGE THE ADDED PRESSURE FROM A FILL PIPE EXTENSION MUST NEVER <br /> EXCEED 5 A.S.I. AT THE WATER LEVEL.14 1 <br /> J <br /> W START TEMP CHECK yF AMIPM (d) A.P.I. GRAV17Y.�7._•}`_ AT%(_.L c S-rls, <br /> PRELIM .;'.END TE MP CHECKAMIPM le; A.P.I. GRAVITY �'7., I_ AT 6^'F <br /> TEST DATA TfM E SINCE LAST LIG ADDED I:Q—MRS (II COEF F D.-EAPANSIGN <br /> 51 <br /> START TEST_1C'Q0_ GIPMEND TEST I1 '.Z�_rej„n,�PM TEST TIME u` "_ MINS I <br /> f <br /> TEST TME TEMP TEMP TEMP WTD, TIME I TEMP I TEMP TEMP <br /> DATA t 2 3 AVG. 3 AJG yS <br /> I <br /> T Ti <br /> N V <br /> J .. <br /> � T <br /> O S <br /> L.,G I I z <br /> > I <br /> Z I`,1 <br /> 1 05 ^25 a a' ` <br /> I �1 <br /> I <br /> (D)TOTAL TEMP.CHANGE(AVG END TEMP.—AVG START TEMP.) z r .a _ , _ -(--4 .0 -F. <br /> (c) VOL CHANGE DUE TO TEMP = PRODUCT VOL x TEMP.CHANGE <br /> I ,x(�C1OEFF. TEXP. .,1.� <br /> 1V2C1 x oI x -tlL �_I� AL.' (—i c +le ��J���:yy - GALS <br /> Itl; TOTAL LIQUID VOL.ADDEDI SUBTRACTED AT ENOOF TEST. . ... .-. =I5_" . 2. GALS. <br /> (e) VOL CHANGE NOT DUE TO TEMP I(c) + (C)I..... ... .. .. _ •Ck L- + ,L�91 -_ + - .' GALS <br /> (1) LEAK RATE _ (e) x_c = .D -x _ �-' --- G P.H. <br /> TIME OF TEST(MINS) ILI:b <br /> THIS LEAK RATE �1 ESN EXCEED THE STANDARD OF 0.050 G.P H DESCRIBED IN NATIONAL <br /> r_ FIRE PROTECTION ASSOC-, BULLETIN N.F.P.A. 329. <br /> THE TANK IS TIGHT/ THE TANK IS NOT TIGHT L <br />