My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2300 - Underground Storage Tank Program
>
PR0231557
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:51 PM
Creation date
11/4/2018 2:18:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231557
PE
2381
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
02
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\E\EIGHT MILE\11530\PR0231557\COMPLIANCE INFO 1987 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRIT= MONTTORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be i=c at the USI'location at all times_ The information on this monitoring <br /> program are conditions of the Operating permit. The permit holder must notify San Joaquin County <br /> Envirottmental Health Divis=phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, tmles required to obtain approval before making the change. <br /> Rimed by Sections 2632(d) and 2641(h) CCP- <br /> Facility <br /> CRFacility Name KIN L IS L A WD R ESnda T <br /> Facility Address I I S30 WEf EILH T MILE RoAD STOL- TM CA °15119 <br /> A. Describe the frequenn of performin the monitoring. <br /> Tank DRILY AND MO01 2 REPORTS MOULUED M USTMAM <br /> 1NDuSTR.IES -TUC . <br /> Piping ANNUAL LI.NETESTS PEIUMMEI) M AFFOR>- A - TEST <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the mottftog: <br /> Tank PETROMETER LICItAb LEVEL 1JUILATIC S15TEM MODCL 1329 TYPE <br /> 114A (QIESEL) MODEL 1329 7VE 221A ( GAS) MFG i3Y PETRO/)ETE2 CORP, <br /> Piping EXTENDLD LIFE LEAK DEIECToRS. MODEL IL- 631.-XL- r) <br /> L DIAPNRAIY\ TYPE MFG BY ED JACKET I A MAi LEV CLMP. <br /> C. Describe the locaticr{s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> PETRI)METEK LDCATED -IN MAIN20MCE SHOP N EAT To EHE <br /> Kim(. -nl-Amb STORE. <br /> D. List the name(s) and ale(s) of the people responsible for performing the monitoring <br /> and/or maintaining :�e equipment: <br /> 7EW WALi< : HARI OR MASTER <br /> hou(o ELSt.)ORTN : ASSISTANT �AARMk MASTS <br /> SAM HILLIKE2 : MARINA AALCHAMIL <br /> E. Reporting format f¢monitoring: <br /> Tank MONT"N REPORT PROVIDED By USrMAKI - <br /> Piping ANNUAL TEST PE-kFnkME1 B`I AFFORD-A -TEST <br /> F. Describe the prever-+e maintenance schedule for the monitoring equipment. More: <br /> Maintenance must �e in accordance with the manufacturers' maintenance schedule <br /> but not less than ere.-r 12 months: AWIUAL Lk AS NEEIED. <br /> G. Describe the train;-. necessary for the operation of UST system, including piping, <br /> and the monitoring -:tlipment: HAR86A MASTER TRAI1JS ALC NEW . <br /> PERSONNEL A►JD ENSU WEq MEET AND AA&ITVTAlln <br /> ACCEPTA3LE auiDELIN>=S AND STANDARD . <br />
The URL can be used to link to this page
Your browser does not support the video tag.