My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2300 - Underground Storage Tank Program
>
PR0231557
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:51 PM
Creation date
11/4/2018 2:18:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231557
PE
2381
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
02
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\E\EIGHT MILE\11530\PR0231557\COMPLIANCE INFO 1987 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION:The Tank Assen.Pry unit is the pressure TO ORDER: S*ify model 1372 Tank Assembly and <br /> sensing and transmitting part of theta nk gauge system. length in feet. To obtain correct length:Measure <br /> An open air bell, when filled with air, converts the distance from the indicator to the bottom of thetank. <br /> weight of the tank liquid to air pressure. Tubing Units are available in lengths of 25, 50, 75, 100 and in <br /> transmits this pressure to the tank gauge. multiples of 10 feet thereafter. <br /> NOTES: 1. THIS UNIT IS FOR TANKS 100%VENTED <br /> TO THE ATMOSPHERE. Approximate shipping weight:A 25 ft.unit is 5lbs.Add <br /> 2. A 2" NPT tank top opening is required. 3/4 lbs. for each additional 10 ft. <br /> TRANSMISSION LINE TO <br /> El <br /> TANK LEVEL INDICATOR C= <br /> i <br /> OR CONTROL SPRING PROTECTOR, <br /> ITI <br /> STEEL PLATED <br /> COMPRESSION NUT, <br /> I1H•TUBE,BRASS <br /> II COMPRESSION CONNECTOR,1H' TUBE K 1H'IPS. BRASS `� �REDUCING BUSHING, <br /> 1-1/P' X IW Ips. SHIPPEDBLACKIRONIN COILS <br /> BUSHING, DOUBLE TAPPED./ J I ASSEMBLED <br /> 3•K 1-1/t' X 1-1/p'IPS, <br /> BLACK IRON <br /> IREINFORCER PIPE, <br /> I TRANSMISSION LINE, SCHEDULE AG 1-112'IPS <br /> 1/A'O.D.SOFT COPPER TUBE �___ SUPPLIED BT INSTALLER <br /> Tit <br /> I AIR BELL, BRASS <br /> 1-1/2'o.D.TUBE,\ LL <br /> 1 It <br /> a.Loxa 1 <br /> \ I I <br /> 1JA' TO B' UNLESS OTHERWISE SPECIFIED EXTENSION, <br /> MUST BE ABOVE AIR BELL OPENIND NYLON <br /> STANDARD E• - FIRST READING ON INDICATOR <br /> SCALE UNLESS OTHERWISE SPECIFIED <br /> INSTALLATION <br /> INSTALLATION INSTRUCTIONS <br /> REINFORCER PIPE: A Reinforcer Pipe (not supplied) SPRING PROTECTOR: Before bending the transmis- <br /> of 1-1/2"NPT,schedule 40 pipe(not heavy duty), must sion line,slide the spring protector down and over the <br /> be used to insure the proper positioning of the Air Bell. fittings. This will permit bending of the transmission <br /> Cut the reinforcer pipe 4 to 6 inches shorter than the line without kinking and protect the fittings and tubing - <br /> vertical depth of the tank. Thread one end of the pipe from the backfill. <br /> and ream both ends to remove burrs. IMPORTANT: TRANSMISSION LINE: Uncoil the 1/4" O.D. copper <br /> TesttheReinforcer Pipeforfreepassage oftheAirBell <br /> . tube transmission line carefully to avoid bending or <br /> THE AIR BELL MUSTPASSALLTHEWAYTHROUGH kinking. Run the transmission tine along with the <br /> THE PIPE SO THAT THE EXTENSION RESTS ON suction or return lineand if possible install in a manner <br /> THE BOTTOM CAUSE THE TANK. that permits condensate to drain - pitched toward the <br /> T AIAMMI GOFTH AIR BELL RRECT <br /> REINFORCERTION <br /> tank avoiding dips and traps. The transmission line <br /> ISJAMMINGOFTHEAIRBELLINTHEREINFORCER contains only air and may becut tosuit.If possible,the <br /> PIPE' lineshouldbeonecontinuousrun,thus eliminatin the <br /> tape bushinp the g an install i nopeninto on top <br /> tanke possibilityof leaks at joints and couplings. When <br /> tapped bushing and install in opening on top of tank. tbing mut bejoined in he field the connctin MUST <br /> AIR BELL: The brass Air Bell at the end of the trans- BE ABSOLUTELY AIR TIGHT. Whenever possible <br /> mission I I ne is the"PICK-UP"device for the Petro meter protect the tubing by running through conduit or pipe. <br /> Tank Gauge. Therefore, its position in the tank is of When tubing is not protected,use only soft soil or sand <br /> prime importance. The Air Bell Extension must be as a cover before backfilling. <br /> resting on the bottom of the tank to give accurate and Fittings MUST be made up ABSOLUTELY AIR TIGHT <br /> correct tank gauge readings. to obtain accurate readings. Ends of tubing should be <br /> TANK FITTING:When the Air Bell Extension is resting cut square (use tube cutter) and deburred. When <br /> firmly on the tank bottom, make up the compression making up compression fittings,tubing must beseated <br /> fitting to lock the transmission line in place. This will and nut tightened with proper size open-end wrenches. <br /> permanently keep the Air Bell in position. Use no pipe joint compound on compression nuts. <br /> PETROMETER CORPORATION TANK ASSEMBLY UNIT REVISED 10-88 <br /> P.O.DRAWER P <br /> 1807 GILFORD AVENUE MODEL 1372—FOR 100%VENTED TANKS 1372 <br /> NEW HYDE PARK.NEW YORK 11040 CAN BE INSTALLED WHEN TANK IS FULL OR EMPTY <br />
The URL can be used to link to this page
Your browser does not support the video tag.