My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
D
>
36
>
2300 - Underground Storage Tank Program
>
PR0508192
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:34 PM
Creation date
11/4/2018 2:19:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0508192
PE
2381
FACILITY_ID
FA0002253
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
36
Direction
N
STREET_NAME
D
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318028
CURRENT_STATUS
02
SITE_LOCATION
36 N D ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\D\36\PR0508192\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. <br />B. Medical <br />All contractor and subcontractor field personnel assigned to this operation will <br />have completed a comprehensive medical examination within the last 12 months. <br />C. Field Supervision <br />All field activities will be supervised by a Field Supervisor having training and <br />experience commensurate with the activity. Field Supervisors have the authority <br />and responsibility to correct any unsafe act or condition during the course of <br />operations. <br />D. Safe Work Practices <br />All contractor and subcontract personnel assigned to the operation will follow <br />safe work practices including good personal hygiene, reporting all injuries, <br />following instructions, inspecting equipment before use, anticipating hazards, <br />utilizing the buddy system, etc. <br />E. Job Safety Review <br />Field Supervisors will conduct daily pre -operations safety meetings with all <br />contractors and subcontractor personnel. <br />VII. SPECIFIC HEALTH AND SAFETY REQUIREMENTS <br />A. Site Control <br />Work zones and other site control measures will be established as needed for the <br />operation, depending on chemical hazards, work location and other requirements. <br />B. Decontamination <br />When personal protective clothing and equipment (Le., respirators) are required <br />for use, standard decontamination procedures shall be followed. <br />1. Recommended Procedure <br />(a) Move to designated area (decontamination station). <br />(b) Wash boots, gloves and suit, as needed. <br />(c) Remove tape. <br />(d) Remove disposable suit (from the inside, out) <br />(e) Remove boots. <br />(f) Remove respirator. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.