My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
D
>
36
>
2300 - Underground Storage Tank Program
>
PR0508192
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:34 PM
Creation date
11/4/2018 2:19:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0508192
PE
2381
FACILITY_ID
FA0002253
FACILITY_NAME
JACK FROST ICE SERVICE
STREET_NUMBER
36
Direction
N
STREET_NAME
D
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318028
CURRENT_STATUS
02
SITE_LOCATION
36 N D ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\D\36\PR0508192\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%r <br />M <br />These items are the minimum required for all personnel working at the site <br />in work zones or areas which do not present any potential chemical <br />exposure hazard. <br />(a) Hard hat. <br />(b) Work clothes (coveralls or work uniform). <br />(c) Safety glasses or goggles. <br />(d) Hearing protection required if noise levels exceed 90 dBA, eight <br />(8) hour average at driller operation (or 85 dBA for workers who <br />have not received a baseline audiogram or have a permanent <br />threshold shift). <br />D. Safety <br />The following safe work practices shall be followed for all construction activities: <br />♦ 1. Underground and overhead utilities shall be identified and located prior to construction. <br />♦ 2. Only authorized personnel shall be allowed in the work area. <br />♦ 3. The drilling or excavation areas shall be clearly marked. <br />♦ 4. All soil staging areas shall be marked, as needed. <br />♦ 5. Vehicle traffic shall not be allowed in equipment operating areas. <br />♦ 6. Unauthorized foot traffic shall not be allowed into the construction area. <br />E. Emergency Procedures <br />All field personnel shall comply with the following emergency procedures: <br />1. Safety standby equipment (include a first aid kit, fire extinguisher and a <br />portable eye wash) shall be set up at the job site prior to the beginning of <br />work. <br />2. All incidents shall be reported to the Field Supervisor immediately. <br />3. The Field Supervisor shall report incidents to the DEL TECH Project <br />Manager. <br />4. Emergency response support including fire department and/or paramedic <br />ambulance shall be requested as needed. (See Table 1.) <br />5. Emergency telephone numbers shall be indicated on Table 1. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.