' r . Mm y:, r i Maui[! ' ,r,, ��"rr✓r �` .i, aa' \i`�xaac fiX
<br /> r
<br /> m
<br /> s^ \
<br /> PERFORMANCE SPECIFICATION ' CONTINUED
<br /> SECTION IX CANOPIES - CONTINUED
<br /> E as
<br /> s .,_,..,ter,....._._.....;. - -- a.._„�..,_.,,.,.., "•
<br /> PART 3 EXECUTION -CONTINUED r
<br /> 3. 1. 17 FABRICATION DRAWINGS SHALL BE DELIVERED TO APPLICABLE CONSTRUCTION OFFICE
<br /> t '
<br /> - A MINIMUM OF 4 WEEKS PRIOR TO COMMENCEMENT OF CONSIRUCHON. NO WORK
<br /> SHALL COMMENCE PRIOR TO APPROVAL OF DRAWINGS BY SOUTHLAND'S CONSTRUCTION
<br /> REPRESENTATIVE.
<br /> 3.2 EXECUTION:
<br /> 3.2.1 COORDINATE DELIVERY AND INSTALLATION WITH GENERAL. GASOLINE INSTALLER ,
<br /> THROUGH LOCAL CONSTRUCTION OFFICE MATERIALS SHALL BE STORED AT POSITION A
<br /> INDICATED BY GENERAL GASOLINE INSTALLER,
<br /> 3.2.2 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FOOTING ANCHOR
<br /> BOLTS AND TEMPLATE FOR DELIVERY TO GENERAL GASOLINE INSTALLATION CONTRACTOR
<br /> 2 WEEKS PRIOR TO INSTALLATION, SIZE W ACCORDANCE WITH SHOP DRAWINGS AND IN
<br /> ACCORDANCE WITH GASOLINE INSTALLING CONTRACfOR'S SCHEDULE OF CONSTRCUTION.
<br /> 3.2.3 FOOTINGS FOR CANOPY AND PLACEMENT OF ANCHOR BOLTS SHALL BE PERFORMED BY
<br /> GENERAL GASOLINE INSTALLER AS PER APPROVED SHOP. DRAWINGS. . TYPE OF CONCRETE:
<br /> SHALL BE AS PER SHOP DRAWINGS. TYPE, SIZE, AND PLACEMENT OF ALL REINFORCED
<br /> STEEL SHALL BE AS PER SHOP DRAWINGS.
<br /> 3.2.4 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND p;
<br /> NOTIFY SOUTHLAND'S CONSTRUCTION REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES
<br /> FOUND. REFER TO SITE PIAN FOR SIZE, TYPE AND PLACEMENT OF CANOPY.
<br /> 12.5 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR BEING PROPERLY LICENSED IN
<br /> LOCAL INSTALLATION AS WELL AS PROVIDING OWN PERMITS AS MAY BE REQUIRED, A -
<br /> COPY OF THE PERMIT MUST BE ON FILE IN THE LOCAL CONSTRUCTION OFFICE PRIOR ? ,
<br /> TO COMMENCING WORK,
<br /> 3.2.6 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE C
<br /> WITH ACCEPTABLE INSURANCE AS REQUIRED PER SOUTHLANO CORPORATION INSURANCE" c?
<br /> SPECIFICATIONS AND STANDARD CONTRACT FOR CONSTRUCTION, INSURANCE SHALL. BE -- 4
<br /> IN EFFECT FOR DURATION OF WORK. u
<br /> ra,
<br /> 3.2.7 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL WORK OF -
<br /> OTHER CONTRACTORS ALREADY IN PLACE, AS MAY BE REQUIRED. i n
<br /> 3.2.8 CANOPY CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING AND OBTAINING
<br /> APPROVAL OF GENERAL GASOLINE CONTRACTOR PRIOR TO PLACING OF ANY HEAVY
<br /> EQUIPMENT ON TOP OF CONCRETE WORK ALREADY IN PLACE. bN
<br /> 3.2.9 ALL FOOTINGS SHALL BE ON FIRM UNDISTURBED SOILS OR FILL COMPACTED r d6`Uy
<br /> TO 957 MAXIMUM DENSITY BASED ON A.S,T.M. D 1557-70, IF ANY POOR SOIL F v u
<br /> CONDITION IS DISCOVERED DURING EXCAVATION, THE DESIGN ENGINEER SHALL BE
<br /> NOTIFIED IMMEDIATELY FOR SOIL BEARING VERIFICATION. ,n�� Ui
<br /> 3.2.10 SUPPORTING COLUMNS SHALL BE PLACED AS PER SOUTHLAND GASOLINE PLANS AND
<br /> AS PER APPLICABLE SITE PLAN. 'K
<br /> 3.2.11 CANOPY SUPPORT COLUMNS SHALL BE CAPPED AT TOP.
<br /> 3.2,12 ALL MATERIALS SHALL BE ALIGNED TRUE AND FLAT AND ALL PLANES. SHAD. BE ` h
<br /> FLAT, TRUE TO ESTABLISHED LINES WITH ALL SOFFITS BEING LEVEL AND VERTICAL
<br /> in m
<br /> WALLS CORRECT AND ACCEPTABLE. PARAPET FASCIA SHALL BE VERTICAL AND PLUMB.
<br /> ALL INTERSECTIONS SHALL BE TRUE AND STRAIGHTEDGE LINES. MATERIALS SHALL BE a
<br /> LEFT IN ACCEPTABLE CONDITION TO OF PAINTED BY OTHERS, ALL METAL. SHALL BE :-
<br /> FREE OF DEBRIS AS MAY BE REQUIRED FOR FINAL PAINTING,/FINISHING.
<br /> 3.2.13 INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR POURING OF CONCRETE 4 GTi
<br /> AROUND CANOPY COLUMNS, COVERING ANCHOR BOLTS AS MAY BE REQUIRED. .E
<br /> 3.2.14 CANOPY CONTRACTOR SHALL_ LEAVE ALL EXPOSED STRUCTURAL STEEL, FREE OF i
<br /> DEBRIS, PRIMED AND READY FOR FINAL PAINTING BY GASOLINE CONTRACTOR.
<br /> 3.3 RESPONSIBILITIES OF GENERAL GASOLINE CONTRACTOR: N A -
<br /> 3.3.1 SHALL_ BE RESPONSIBLE FOR AMINIMUM OF 30 DAY NOTIFICATION OF DATE WHEN
<br /> SITE WILL BE READY FOR INSTALLATION OF GASOLINE CANOPY T--1--r- -L 3.3,2 UPON UPON AGREED DATE BETWEEN GASOLINE CONTRACTOR AND CANOPY CONTRACTOR, s I
<br /> THE SITE SHALL BE FREE: OF MATERIAL, MOVABLE EQUIPMENT AND DEBRIS, LEVEL AND
<br /> IN PROPER CONI)ITiON FOR CANOPY IWALI,.ATION. GENERAL GASOLINE CONTRACTOR
<br /> SHALL PERFORM SITE WORK AS MAY 13E REQUIRED TO COMPLY.
<br /> 3.3.3 GASOLINE CONTRACTOR SHALL NOT !NSTAU_. GASOLINE DISPENSERS PRIOR TO CANOPY
<br /> g ERECTION, UNLESS AGREED UPON IN WRITING BETWEEN THE CANOPY INSTALLER AND
<br /> 8 GASOLINE INSTALLER.
<br /> 3.3,4 GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF CANOPY
<br /> FOOTINGS AS DESIGNED IN SHOP DRAWINGS PROVIDED BY CANOPY MANUFACTURER, I
<br /> 7 PROVIDING ALL STEEL, ETC., (WITH THE EXCEPTION OF ANCHOR BOLTS TO BE {'
<br /> PROVIDED BY CANOPY INSTALLER} FOOTINGS SHALL BE POURED IN A SUFFICIENT
<br /> AMOUNT OF TIME, SO PROPER CURING TIME IS ALLOWED. `
<br /> 3.3.8 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR PAINTING OF ALL METAL. AND
<br /> TRIM AS RELATED TO THE GASOLINE CANOOPY AS PER STANDARD COLOR REQUIREMENTS.
<br /> 3.3.6 GASOLINE CONTRACTOR $HALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLA--PION
<br /> OFS
<br /> LIGHTS, IGNSS
<br /> , SECURITY LIGHTS, ETC., IN .CONJUNCTION WITH NORMALGASOLINE
<br /> - s ,
<br /> 3.3.7 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVING OLOCKOUTS AS MAY I~.
<br /> m BY REQUIRED FOR INSTALLATION OF CANOPY IN ACCORDANCE WITH SHOP DRAWINGS, '� M
<br /> AND PLACEMENT OF ANCHOR BOLTS IN ACCORDANCE: WITH SHOP DRAWINGS AS RELATED
<br /> THERETO,
<br /> I 3.4 WARRANTIES: CANOPY CONTRACTOR SHALL WARRANTY, IN WRITING, COMPLETE CANOPY
<br /> INSTALLATION FOR A MINIMUM PERIOD OF 2 YEARS. A 5YEAR WARRANTY ' IiL,"
<br /> GUARANTEEING INSTALLATION TO BE FREE OF DESIGN AND INSTALLATOIN DEFECTS. DATE, 15 Ut '3T
<br /> INCLUDING$ ACTS OF MAN, GOD AND NORMAL WEAR AND TEAR, SHALL BE COVERED.
<br /> 3,5 CLEAN-UP; CANOPY CONTRACTOR SHALL BE RFSPONSIBLE FOR CLEAN-UP AND PROJECT NO.
<br /> REMOVAL FROM SITE ALL TRASH AND DEBRIS RESLILIING FROM WORK RELATING TO 3011,20
<br /> INSTALLATION OF CANOPY, 7
<br /> 4RAWN:--
<br /> MSP
<br /> APPT2QVE0: CL
<br /> 6
<br /> -DRAWING, -- -
<br /> f
<br /> sp__
<br /> k
<br /> ..
<br /> 1. .c. ,
<br /> �.�}� ry . : .r. vt r _ v :ti. d w $. ♦ F ,civ
<br /> .., ,. > .. ItYFY i,' }
<br /> ., , . . . _ , . ,..,a.. . '_s . . �S . 1".,
<br /> a",�r. .. ,-,. ,''. .a""Ik. . 9, ,K.
<br /> � ,' : . . -F-c,�h.s. 4. y.... � ....C�'�,C ., .,� hU,.y.� .�4»[F4�;.;+<;§v�° .�se,,, .. r.,:<+"w\..w.-�"4ra"�A"J^.:»i 4�
<br />
|