Laserfiche WebLink
) <br /> We are not aware of any regulatory requirements which would prohibit constructing the <br /> USTs as proposed so long as all applicable requirements in the UST Regulations are <br /> satisfied at the time the CUPA issues an operating permit. Therefore, CUPA's may <br /> choose to proceed with permitting construction with the understanding that operating <br /> permits cannot be issued until the UST has satisfied all requirements of the regulations. <br /> Title 23, CCR Section 2643 <br /> Franklin Fueling and Veeder-Root have provided appropriate testing reports by a third <br /> party showing equipment functionality with Ultrazol. Therefore Local Guidance (LG) <br /> Letter 113 has been updated to reflect compliance with the use of Ultrazol for the <br /> following equipment: Franklin Fueling STP-MLD-D automatic line leak detector, Veeder- <br /> Root sensor 794380-323, Veeder-Root sensor 794380-208 and Veeder-Root sensor <br /> 857080. <br /> This review should not be interpreted as an endorsement of materials or components. <br /> Nor should this review be interpreted as an approval for construction. Costco must <br /> comply with all local notification, local permitting requirements and is responsible for <br /> obtaining approvals from the CUPAs prior to construction and operation. <br /> If you have any questions, please me at (916) 341-5870 or Ifisher anwaterboards.ca.pov. <br /> Sincerely, <br /> VDvw& <br /> � <br /> Laura S. Fisher, Chief <br /> UST Leak Prevention & <br /> Office of Tank Tester Licensing <br /> cc: Tim Hurlocker <br /> Costco Wholesale <br /> 999 Lake Drive <br /> Issaquah, WA 987027 <br /> John Ellingsen <br /> Barghausen Consulting Engineers, Inc. <br /> 18215 72nd Avenue South <br /> Kent, WA 98032 <br />