My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:30 PM
Creation date
11/4/2018 2:26:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> Donna Heran,REHS <br /> r.` 1868 East Hazelton Avenue <br /> y. Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> Robert McClellon,RENS <br /> Jeff Carruesoo,REHS, RDI <br /> • c:, -' .'p • Kasey Foley, REHS <br /> 6Ra\ website: www.sjgov.org/ehd <br /> PLinda Turkatte, REHS <br /> hone: (209) 468-3420 <br /> March 19, 2013 Fax: (209) 464-0138 <br /> Alexia Inigues <br /> Barghausen Consulting Engineers, Inc. <br /> 1821572 nd Avenue South <br /> Kent, Washington 95136 <br /> Amended <br /> SUBJECT: Costco Gasoline #1031 2440 Daniels Street, Manteca, CA, 95336 SR0066049 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the permit application for installing of a 1,500 gallon Fuel Additive underground storage tank, <br /> and product piping from new UST to the existing gasoline UST's fill sumps on the underground <br /> storage tank (UST) system at the above noted address. <br /> Inspection/testing verification in condition #3 have been amended due to existing double-walled <br /> fill sumps at the site. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Thuy Tran at (209) 468-8257 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. <br /> b. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br /> pressure, or 40 psi, whichever is greater. <br /> c. Secondary piping soap test: One hour pressure test per manufacturer's guidelines. If <br /> there are no manufacturer's guidelines, test shall be performed using an applicable <br /> method specified in an industry code or engineering standard. <br /> d. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> e. Verify no brine leaks from existing fill sumps annular space. <br /> f. Verify annular space communication between new fill sump top to existing fill sump <br /> bottom. <br /> Please be aware that the facility cannot operate the Lubrizol Product UST prior to <br /> the EHD inspection and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.