Laserfiche WebLink
%%.Wl ..0 <br /> 2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION. <br /> Complete to scale As-Built Plans <br /> Complete Monitoring and Response Plan <br /> UPCF Underground Storage Tanks - Installation Certificate of Compliance (one <br /> form pertank) <br /> Completed Underground Storage Tank Certification of Financial Responsibility <br /> form along with any required attachments <br /> Passing Line Leak Detector Test Results <br /> Passing Line Tightness Test Results (Required if the UST system does not satisfy <br /> the California Code of Regulations 2636(g)for automatic pump shut-off.) <br /> Passing Enhanced Leak Detection Results <br /> D. INSPECTIONS: <br /> Note: A representative from the San Joaquin County Environmental Health Department <br /> must witness all activities described below. <br /> [] Tank holiday test (for fiberglass-coated steel tanks) performed prior to <br /> installation in excavation <br /> ❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br /> ITank soap test (for fiberglass tanks) performed prior to installation in excavation <br /> Verification of tank set and anchorage in excavation <br /> Primary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> =1 Secondary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> C 24-Hour secondary containment lake test on sumps and under-dispenser <br /> containment <br /> Piping Slope & cathodic protection prior to covering <br /> L Overfill performance test <br /> Prior to receiving fuel, a complete functional test of tank and piping monitoring <br /> system(s) including overfill prevention <br /> Final inspection and demonstration of automatic shut down (if applicable). <br /> Revised 8/1/11 5 <br />