Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YESWJ NOf—] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the `Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank lop upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Installation of a 1,500-gallon automated underground fuel additive storage tank system, which includes minor <br /> excavation for the tank, piping to the existing UST fill sumps, and an electrical trench to access spare conduits. <br /> For additional information, please refer to the attached Scope of Work. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Please refer to the attached T-X Materials List <br /> 3 <br />