My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 10:45:22 AM
Creation date
11/4/2018 2:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\BILLING 2013 - 2014.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> L UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD g9as4. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49asw <br /> ❑� 4.NO DISPENSERS ❑99.OTHER 5 i : <br /> PANEL MANUFACTURER: 49-66 MODEL q: �— 49-s6. <br /> LEAK SENSOR MANUFACTURER: 49asr <br /> DETECTION OFA LEAK INTO MODEL#(S): -vasa <br /> THE UDC 7RIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 49-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGG ERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 49-62 <br /> 2.UDC CONSTRUCTION IS ❑1.SINGLE-WALLED ❑2.DOUBLE-WALLED9D �N <br /> 49062 <br /> IF DOUBLE WALLED: _UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LI UID 2.PRESSURE 3.VACUUMqw a.A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL .YES ❑b.NO 49 bVII.PERIODIC SYSTEM TESTING <br /> 1.ELDTESTING:THIS FACILITY HAS BEEN NOTIFIED BY THB STATE WATER RESOURCES CONTHAT ENHANCED 49-65.LEAK DETE D MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHD. 23 CCR 2641.12.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066®3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> 49-61VIII.RECORDKEEPING <br /> Thefollowing muni OMg/maintenance records are kept for this feeitity©Aloun logs 490-69. 0 Visual Inspcotion Records 490-6s6 ❑Tank integrity testing results 491]-bac <br /> ❑SIR testing results(and supporting documentation records). 49-6ad ❑ Tank gauging results(and supporting docus). 4906 e❑ATO Testing results(and supporting documentation records).49aiaf ❑ Corrosion Protection 60-day logs 490-6ss®Equipment maintenance and calibration records. 49o.sahIX.TRAINING <br /> V Personnelwith UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob d . <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑� THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69h <br /> ❑Q <br /> OPERATING MANUALS FOR ELECTRONIC MONITORINGEQUIPMENT(Required)g9069e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o.sm <br /> ❑ CALDiORNIA UNDERGROUND STORAGE TANK LAW 49-69- <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: ..BAND FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49oof <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49a69g <br /> ❑ OTHER(Specify):hoign m69t <br /> This facility has a"Designated UST Operator"who has pasud Ute California UST System Operator Exam administered by the Intemational Code Comcil(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner wnsistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments hem or indicate how many pages with additional information On specific monitoring procedures are attached to this plan.49-71 <br /> Audible and visual overfill alarm set a190%of tank capacity for overfill protection.See additional attachment. <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Opemtor is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,said 3)all monitoring records are maintained properly. <br /> The following peraonre(s)aresponsible for performing the monitoring and equipment maintenance: <br /> NAME Tim Hurlocker g9an TtTLE Director of Gasoline Operations <br /> NAME Dennis Bock4M73 <br /> 49-74 TITLE Environmental Compliance Manager 49-15 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform thtM6iiii pemtor of any <br /> conditions that need follow-up action. <br /> XH,OWNER/OPERATOR SIGNATURE f.^.. <br /> CERTIFICATION:I certify t the information provided herein is true and accurate to the best of my knowledge. <br /> APPL�AN'FSIGNATURE 490.]6 DATE: qy-]r <br /> Il r� <br /> APPLICANTNAME(print): 490'9- APPLICANT TITLE: 490'+9 <br /> David H Rogers C Director of Real Estate Development <br /> UPCF UST-D(12l20n 3!4 lit! Co9&fi`&�-A <br /> \' Z �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.