My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 10:45:22 AM
Creation date
11/4/2018 2:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\BILLING 2013 - 2014.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IED PROGRAM CONSOLIDATED FO� RE^ �n_ <br /> UNDERGROUND STORAGE TANK 4 r <br /> RESPONSE PLAN — PAGE 1 <br /> R01 <br />FFACILITY <br /> ❑ I.NEW PLAN M 2.CHANGE OF INFORMATION JUN — <br /> 5 2n12 <br /> I. FACILITY INFORMATION <br /> ncy Use Only) — — HOSTCO WHOLESALE GAS STATION#1031 <br /> R03 CITY MANTECA 0.NRESS 2440 DANIEL STREET <br /> 11. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures m the facility's Hazardous Materials <br /> Business Plan. <br /> 'r If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> i Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material.but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> v Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> etTective or whichis no longer intended for will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that it is <br /> non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> Y Facility personnel will determine whether or not any water removed front secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e.. rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> i We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BIT AVAILABLE FOR USE IF NEEDED: (Com fete onl if applicable) <br /> EQUIPMENT R10LOCATION AVAILABILITY <br /> . <br /> R20. R30. <br /> all R21. R31. <br /> R12. <br /> R22 R32 <br /> R13, R23. Rll <br /> R14. a24R34 <br /> . . <br /> all R25. R35, <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY TINDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE RSO <br /> DENNIS BOCK COMPLIANCE MANAGER <br /> NAME Ral. TITLE MI <br /> TIM HURLOCKER DIRECTOR OF COSTCO GASOLINE OPERATIONS <br /> NAME R42 TITLE ase. <br /> COSTCO WAREHOUSE MANGER COSTCO WAREHOUSE MANGER <br /> NAME R43. TITLE Rsl. <br /> COSTCO GASOLINE STATION SUPERVISOR COSTCO GASOLINE STATION SUPERVISOR <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE ASFOLLOWS: <br /> E]Additional system testing or data collection ® Inspection by qualified persons ❑ Recalibration of equipment ®Other(specify): Rn <br /> Site operator will contact a certified, trained pump and tank technician will be dispatched to the site to evaluate and <br /> repair alarm condition. <br /> Belshire Environmental Services,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.