Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae l of 2 <br /> TYPE OF ACTION [0 1.NEW PLAN E] 2.CHANGE OF INFORMATION 41 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 9942 <br /> Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)• <br /> L FACILITY INFORIMATION <br /> FACILITY ID#(Agency Use Orly) I r 1 - 1 - t <br /> BUSINESS NAME(Same as FACILITY NAME)Costco Manteca Gas Station#1031 3. <br /> BUSINESS SITE ADDRESS 2440 Daniels Street 101. 1 CITY Manteca 104, <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive mamt=wc,and cabbmition of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel- <br /> 23 CCR2632,2634,L638,2641) _ <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY [199.OTHER(Specify): 490 y <br /> HL MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. 0 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4905 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4906 <br /> PANEL MANUFACTURER Veedw Root 4907. MODEL#: TLS-35OR <br /> LEAK SENSOR MANUFACTURER: Vender Root --� 49P9. MODEL#(S): 7943110-301 49010 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TK( ).(23 CCR§2643) a90'Ir <br /> PANEL MANUFACTURER: 49012. MODEL#: 4900 <br /> IN-TANK PROBE MANUFACTURER 49014. MODEL#(S): 49015 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ It.DAILY/NIGHTLY ❑ c.WEEKLY 49x16 <br /> ❑ d.MONTHLY ❑ c.OTHER(Specify): -_ 4901? <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h ❑ 6.02 g.p.b. ❑ c.OTHER(Specify): 49Pi9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49x20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD. ❑ a.36 HOURS ❑ b.60 HOURS 49021 <br /> 490-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49025 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BINNNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490.26 <br /> ❑ <br /> 99.OTHER (Specify): 49027 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> I.CONTINUOUS MONITORING OF PLPF/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490.38 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a DRY ❑b.LIQUID FILLED_❑c.P_RESS_URDZED ®d.UNDER VACUUM 09029 <br /> PANEL MANUFACTURER:Veeder Root(VR) 490'30 MODEL#: TLS-350R °90-51 <br /> LEAK SENSOR MANUFACTURER VR suaW Interstitial&VR rump interior 490.N MODEL#(S): 304&112 490'33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑It.NO 4W34 <br /> FAILURE(DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 42636) 490-56 <br /> MLLD MANUFACTURER(S): 49°'37 MODEL#(S)_ 490-31 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(.LLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49 N <br /> ELLD MANUFACTURER(S)Veeder Root _ °90'00' MODEL#(S): 8484"1 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ® 1.MINIMUM MONTHLY 0.2 g.p.h. ® 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 10 a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 4 5 <br /> TEST FRE UENCY Ia &ANNUALLY b.EVERY 3 YEARS D a OTHERS if 490.4649047 <br /> 5.VISUAL PIPE MONITORING. 49°4s <br /> FREQUENCY ® a.DAILY ❑ b.WEEKLY ❑C.MM.MONTHLY&EACH TIME SYSTEM OPERATED- 49°49 <br /> •Albwd(or m99iio,m or4vtwe6 cm ora,el i NSC 5281.5 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(aN3)l. 49050 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7IS CONNECTED TO THE TANK SYSTEM <br /> 490-5 <br /> ❑ <br /> 99.OTHERS 490.52(Specify) 49x53 <br /> UPCF UST-D(1212007)1/4 <br />