My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 10:45:22 AM
Creation date
11/4/2018 2:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\BILLING 2013 - 2014.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN--PAGE 1 (One form per facility) <br /> TYPE OF ACTION ] 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol' <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Rat <br /> Costco Wholesale Gas Station#1031 <br /> BUSINESS SITE ADDRESS 2440 Daniels Street Rm. C17Y Manteca Rol. <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addr esses unauthorized releases from UST systems and supplements them ergeucy response plans and procedures in the fudilys Hazan ous Material s <br /> Business Plan. <br /> > If safe to do so,facility personnel will take i immediate measures m control or stop any rele we(e.g.,activate pump shut-ofE em.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the s econdary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable sp ills of hazardous materials. Absorbent in merial which has beco me too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardou s. Used absorbent material,reusable or waste,wi II be stored in a Prop erly 1 abeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> > Facility personnel will date rine w hether any water removed fm m s econdarycontain merit sy stems,m from clean-up activity,has been in co nlact with any <br /> hazardous material.If the water is contaminated,it will he managed az hazardous waste unless a waste deterinatim in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleu m shcen(i.e.,rainbow colon),it is contaminated. A thick flaming pet roleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> > We will review secondary containment system for possible deterioration if any of the following conditions occur. <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous mmerial collected in secondary containment; <br /> 3. Hazardous material,other than the p mduct/weste stored in the primary containment system,is placed inside secondary containment to tr eat or neun alize <br /> released product/waste,and the added material or resenting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is limed in the facility's Hazardous Materials Business Plan T his <br /> equipment is inspected at least monthly,and after each use,supplies we replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE 1F NEEDED: (Complete aril if Ec lble <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIs. R20. R10. <br /> RIL UL sit, <br /> R12. R22, all <br /> R13. R23. Fill. <br /> Rla. FiN. R31. <br /> R15. Us. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)1S/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Dennis Bock R40 TITLE Compliance Manager R50. <br /> NAME Dwight Larsen Ral. TITLE Operations Manger R51, <br /> NAME Rae. TITLE R51 <br /> NAME U3- TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> IYAdditioral system testing or data collection INInspectionbyqualifiedpersons EXRecalibmtionofequipment <br /> Other: <br /> Rha <br /> UST Response Plan(3/2008).1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.