Laserfiche WebLink
Facility Name: Costco # <br />1031 Manteca (page 2) <br />D. Results of Testing/Servicing <br />Coco=he follawi� - .. <br />the <br />to' <br />.c�e au sensors visual) inspected, functionally tested, <br />Were all sensors installed at loweste ui ment will not interfere with their and confirmed opoint of seconds eratianal? <br />If alarms are tion� °ntainment andmodem) operationI a remote positioned sothat othermonitorinon, isFor pressurzed all communications a uiystems, 9 pment(e.g <br />containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If <br />does the turbine automaticallhuhe piping secondary <br />yes: which sensors initiate positive shutdown? (Check all that aispenser Containment Sensors.id you confirm °Ply)Sump Sensors; IRpositive shutdown due to leaks and sensor failure/disconnection? Emer Shut Down (ESD) was tested and found to beworkin ateach station. <br />or tank systems that utilize the monitorin s stem as the rima ®Yes; ❑ No. <br />he overfill warning alarm visible and audible at the tank fil poit� and ope'ratin ruing erl ? , is <br />hat percent of tank capacity does the alarm trigger? 90% 9 properly. At <br />jYes* ❑ No Was any monitoring equipment replaced? If yes, identi s ecific sensors, <br />probes, or <br />equipment replaced and list the manufacturer name and model or all replacement parts in Sect onr <br />E, below. <br />Yes* ®No Was liquid found inside any secondary containment systems designed as dr s stems. <br />that app )❑ product; ❑ Water; ❑ Brine. If es, describe causesgn Section E, below.? (Check all <br />Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if <br />applicable <br />Yes [-]No* Is all monitorina eaninmant <br />E. Comments: <br />