Laserfiche WebLink
COSTCO <br />VICINITY MAP <br />LOCATOR MAP <br />4E <br />wall. <br />al ROUT N <br />MON DR <br />PROPOSED TiWNSFORMER . <br />LIX'llnON � . <br />INSTAL OVERFILL HARM <br />AND ACKNOWLEDGE, $A" <br />INSTAL EMERGENCY PUMP SHUTOFF <br />SWiYGI PER UFC REQUIREMENTS <br />8 <br />3' OVER 2" HU <br />6 <br />4' ONR 3' FRP <br />A <br />3" oVEA 7 <br />PER FF. <br />6 <br />3" OVER v FT <br />(m) <br />3' OVER 2" <br />4' OWSR 3" <br />3' OVER 2' <br />(TYP.) <br />HOSE PER <br />KT MW <br />GROUND WATER LEVEL NOTE. <br />A 5095 REPORT OF THIS SUE LOCARCH HAS REVEALED THAT <br />GROUNDWATER WAS ETNCOLIN RED Al D TO 10 FEET RFLOiAI THE <br />CKWNU SURiACE WITH A MACMUU EXPLORED DEPTH OF 26.S FET. <br />TANKSSHALL BE WSTW LFS w CONCRETE IMABUEN AND RATER <br />FABRIC PER WNURWCIURERS' CUMUMMES. TNN( Fi(CAVAT IN 9 <br />Be PTR DELA REOUREMENTS ANO BE PERFORMED TOIOMNG ME <br />RECOMUEN'OVTONSOF THE SOR <br />, ILS REPOT <br />SOILS REPORT N': <br />KTFMiTES BTA. <br />NO. <br />2626 FIST MYRTLE STREET <br />STOCKTOR, CA 95205-4794 <br />(2091 <br />CARL FRMOSCD HENDERSON. P.E. LICENSE j7i115 <br />REPORT j 81050.001 MAY S. 2007 <br />TANK EXCAVATIONNOTE-. <br />TAP( EKCIVARMS $HALL BE PER 05TH HBOUIREMENIS ANA BE PERFORMED <br />FONLDMNO THE RECOMMERDATIONS OF THE SODS REPORT. TANKS <br />aC1VARMS THAT REWRE SHOAWO $RVA BE ENGIN w AND PFRMNTUI <br />SFPAAA3EY AND Sl BE THE RESPONSIBILITY DF THE W &U NC <br />CONTRACTOR. <br />BR��EL, DROP�REQUIREMENT.- <br />PHOT TO FUEL Dow. THE G.C. SHELL HAVE THE VFEDER AGOT MONITORING <br />SYSTEM! OPEIUl10.WL COSTCO )MOLEStlE RILL HOT SmCD AE FUE TDR <br />DEWERY UNITE THE NUKISORNAH HAS AF7H W THE SHE FOR FIRST <br />FLET. DROP, IEEDCO ROOT IS OPERATIONAL AND MONHNONG ME <br />TANKS/UHES AND THE SIZE i5 ADCEssUTE FOR FUEL TRUCKS <br />WHIR011FR <br />ENCLOSURE <br />41IN1TALL EUERCENCY Ml <br />SRUTOFF SMTGI PER UFC <br />REQUIREMENTS <br />AND <br />BASED ON FIELD SURVEYS AND 'S-WAT' RECORDS. THE GENERAL CONTRACTOR <br />SHALL 'POTHOLE' THE EMONO MKHIES TO YPTUY THE DMETER AND LOCATION <br />(INCL, ELEVATORS) PRIOR TG CONSTRCICILON. ANY gSOREPA CIES W THE <br />LOCATION OF THE E)RSRNU RPE OR INCGMPARBHHY OF WE DESIGN WALL BE <br />DROUGHT N ME IMMEDIATE ATTENTION OF THE MOMS RURESENTAIVE, AND <br />'F <br />BAARGHAOOMW CONSULTING ENGINEERS (425-251-6222). <br />V I U I 1 CONONJ I}NOTE' <br />CAV=* <br />TSE CONTRACIOR SHALL BE RESPOISIOM-FOR VER7YING TSE LOCATION. <br />MUNSON ' <br />U NSCU, ANO DEPTH OF ASL RAISING UTILITIES WHETHER SHORN ON THESE <br />PLANS M NOT BY POT HOLING AHE UTAMES AND SURVEYING TIE HO)ZONTAL <br />ANO VERICAL LOCATION PRIOR TO CONSTRIXIMM THIS SHALL INCLUDE CALWO <br />UTUTy LOCATE O 1 (8M1 227-2600 AND THEN POT HOWNC All OF ME <br />E)RSBNG UTUTES AT LOOCGATOES W NEW Brim CR059NGS To PHYSICALLY <br />VERFYWHETHER M HOT CMUi EIOST. LOCATIONS OF SAID UTILITIES AS <br />"m ON THESE POUFS ARE BASED UPON THE UNVERIFIED POBLIC INFGRMANOH <br />AND ARE sUB.IECT TO VAHMM ATIF CONFLICTS SHOULD OCCUR THE CONTRACTOR <br />SHALL CCHMT vMMAUSEF COLSULw; ENOPPEERs. AHG TD RESOLVE ALL <br />PROBLEMS AIDS TCI PROCEDIHG 9ATN CONSNRUCnou. <br />EWATERING NOTE- <br />RASW UPON THE GEOTECHWM. REPORT, UEWARA W DT THE TANK <br />EXCAVMM MY BE PE.OUM. OA. WW1 CONTACT THE Ll ' STORY <br />WATER DIMEDY AGENCY HANKY 3U�OICNPN OVER THIS PROTECT AND <br />OMAN IR IMUREMFNTS FOR OSCHMICNO TO WEIR STORY Ma <br />FM11nC5. <br />SHEET INFORMATION NOTE= <br />RISE SHEET WFORIAYTON PRMDCD BY MEA A, WRIGHT. FILE WALE <br />A06654�p"-01-24-20D].ZR9, OPTED 09.04.07. <br />�■ �l�r�►Tir."�3l��G�7��1 <br />rol1_►�1� <br />UTlAFAOP I I III UNREAD® I I I REAIILI <br />SOK GA. 30( GAL III II "PGAL <br />0 scar o}"' p 1 (90 0) WO 2600 UNDERGROUND TANK AND PIPING SITE <br />• YOAOl1� ' <br />dG <br />0 (]) 2" OA. SLAG( STEN <br />P LETIT Dik CORROSION <br />T-2 PROTECTED 70 GUOE. <br />PAaNT MKTE <br />- J 3NSTALL HEALY arm(TTP. OF 3) T� AR SEPARATOR ON 4'KC <br />NNORICUM CONCRETE PAO <br />(�Di.EVEL GAUGE (M. OF 3) <br />22' MANWAY (TYP. 3 PLCs.) <br />or <br />GENERAL NOTES � <br />PLP91C EEOND -I- - gFJa6sSmM MNOFRKRWND UITlIIKs <br />[NAlE4. GAS, 1ELEPIKRE. 5FW'ER) <br />-�--- -- - - 3' owe r Dass: wAu F®IGASS PRCGGCT RwNe (WDM TOAVST) <br />0 <br />- - - - - - - - - - - - - 3' OVER Y DOUBLE WAIL FOUIRLASS WENT PPONG (SMITH FI6MGVSl) <br />4' MFR 3. OR a OVER 2 00491E WNL FIBERGASS VAPDN RtGOIERY PPWP (STAINS HE+EROAST) <br />6Fn� <br />E^ <br />O <br />SOME, MXCATES DISPENSER R EMW SNF POWTM <br />GRUNT AND A E9 UTUR IS HEii I ASSURE THAT THE OND CUT SBASED MEETS ME DE LD <br />1VI0 TND CSTALLAIOI IS PFRNTTD 10 AOA/5F 4Zi AND OUTS BASED ON ACTUAL FlDLP <br />Z <br />MDIT <br />COIdTONS AND IHSTAUIRM TRGLNTOLES <br />A <br />FROOUC1 YMOR AND VENT M40 M TO SLOPE TOWMO IAAF( 1/6' PER FOOT MINIUM. 1/4' PER FOOT PRiFERHE➢. SIPHON - <br />AND VENT STACK PIFIIRN TD SLOPE 1/E' P N FOOT, <br />Ii <br />• W33MD/RY CONTAINMENT HMG IS WOW BY NONE pELY. NOT GDAPU C Y. All PRODUCT. %.T AA VAPOR REOWERY <br />O LL <br />MMO TG BE DOUBLE CMTAT9R "BIER- 5 PPE FOR OUTMONS REGARdNG F63 BOVDER CEMPICATIW ANO/CR <br />OWN, <br />41IN1TALL EUERCENCY Ml <br />SRUTOFF SMTGI PER UFC <br />REQUIREMENTS <br />AND <br />BASED ON FIELD SURVEYS AND 'S-WAT' RECORDS. THE GENERAL CONTRACTOR <br />SHALL 'POTHOLE' THE EMONO MKHIES TO YPTUY THE DMETER AND LOCATION <br />(INCL, ELEVATORS) PRIOR TG CONSTRCICILON. ANY gSOREPA CIES W THE <br />LOCATION OF THE E)RSRNU RPE OR INCGMPARBHHY OF WE DESIGN WALL BE <br />DROUGHT N ME IMMEDIATE ATTENTION OF THE MOMS RURESENTAIVE, AND <br />'F <br />BAARGHAOOMW CONSULTING ENGINEERS (425-251-6222). <br />V I U I 1 CONONJ I}NOTE' <br />CAV=* <br />TSE CONTRACIOR SHALL BE RESPOISIOM-FOR VER7YING TSE LOCATION. <br />MUNSON ' <br />U NSCU, ANO DEPTH OF ASL RAISING UTILITIES WHETHER SHORN ON THESE <br />PLANS M NOT BY POT HOLING AHE UTAMES AND SURVEYING TIE HO)ZONTAL <br />ANO VERICAL LOCATION PRIOR TO CONSTRIXIMM THIS SHALL INCLUDE CALWO <br />UTUTy LOCATE O 1 (8M1 227-2600 AND THEN POT HOWNC All OF ME <br />E)RSBNG UTUTES AT LOOCGATOES W NEW Brim CR059NGS To PHYSICALLY <br />VERFYWHETHER M HOT CMUi EIOST. LOCATIONS OF SAID UTILITIES AS <br />"m ON THESE POUFS ARE BASED UPON THE UNVERIFIED POBLIC INFGRMANOH <br />AND ARE sUB.IECT TO VAHMM ATIF CONFLICTS SHOULD OCCUR THE CONTRACTOR <br />SHALL CCHMT vMMAUSEF COLSULw; ENOPPEERs. AHG TD RESOLVE ALL <br />PROBLEMS AIDS TCI PROCEDIHG 9ATN CONSNRUCnou. <br />EWATERING NOTE- <br />RASW UPON THE GEOTECHWM. REPORT, UEWARA W DT THE TANK <br />EXCAVMM MY BE PE.OUM. OA. WW1 CONTACT THE Ll ' STORY <br />WATER DIMEDY AGENCY HANKY 3U�OICNPN OVER THIS PROTECT AND <br />OMAN IR IMUREMFNTS FOR OSCHMICNO TO WEIR STORY Ma <br />FM11nC5. <br />SHEET INFORMATION NOTE= <br />RISE SHEET WFORIAYTON PRMDCD BY MEA A, WRIGHT. FILE WALE <br />A06654�p"-01-24-20D].ZR9, OPTED 09.04.07. <br />�■ �l�r�►Tir."�3l��G�7��1 <br />rol1_►�1� <br />UTlAFAOP I I III UNREAD® I I I REAIILI <br />SOK GA. 30( GAL III II "PGAL <br />0 scar o}"' p 1 (90 0) WO 2600 UNDERGROUND TANK AND PIPING SITE <br />• YOAOl1� ' <br />dG <br />0 (]) 2" OA. SLAG( STEN <br />P LETIT Dik CORROSION <br />T-2 PROTECTED 70 GUOE. <br />PAaNT MKTE <br />- J 3NSTALL HEALY arm(TTP. OF 3) T� AR SEPARATOR ON 4'KC <br />NNORICUM CONCRETE PAO <br />(�Di.EVEL GAUGE (M. OF 3) <br />22' MANWAY (TYP. 3 PLCs.) <br />or <br />GENERAL NOTES � <br />PLP91C EEOND -I- - gFJa6sSmM MNOFRKRWND UITlIIKs <br />[NAlE4. GAS, 1ELEPIKRE. 5FW'ER) <br />-�--- -- - - 3' owe r Dass: wAu F®IGASS PRCGGCT RwNe (WDM TOAVST) <br />0 <br />- - - - - - - - - - - - - 3' OVER Y DOUBLE WAIL FOUIRLASS WENT PPONG (SMITH FI6MGVSl) <br />4' MFR 3. OR a OVER 2 00491E WNL FIBERGASS VAPDN RtGOIERY PPWP (STAINS HE+EROAST) <br />6Fn� <br />E^ <br />O <br />SOME, MXCATES DISPENSER R EMW SNF POWTM <br />GRUNT AND A E9 UTUR IS HEii I ASSURE THAT THE OND CUT SBASED MEETS ME DE LD <br />1VI0 TND CSTALLAIOI IS PFRNTTD 10 AOA/5F 4Zi AND OUTS BASED ON ACTUAL FlDLP <br />Z <br />MDIT <br />COIdTONS AND IHSTAUIRM TRGLNTOLES <br />A <br />FROOUC1 YMOR AND VENT M40 M TO SLOPE TOWMO IAAF( 1/6' PER FOOT MINIUM. 1/4' PER FOOT PRiFERHE➢. SIPHON - <br />AND VENT STACK PIFIIRN TD SLOPE 1/E' P N FOOT, <br />Ii <br />• W33MD/RY CONTAINMENT HMG IS WOW BY NONE pELY. NOT GDAPU C Y. All PRODUCT. %.T AA VAPOR REOWERY <br />O LL <br />MMO TG BE DOUBLE CMTAT9R "BIER- 5 PPE FOR OUTMONS REGARdNG F63 BOVDER CEMPICATIW ANO/CR <br />AB-RT81 HMO UEMMO$ ANO STANDARD$, PLEASE CONTACT SCOTT WILSON AT (425) 4621- 5i¢ <br />• IT IS WE IN 11N7 OF THIS OEM TO PRIAIDE A TARK & MARK SYSTEM COMPLUNT PARI M-2461 REMREMENTS FOR <br />1 <br />CONONOIS U I WRING OF ALL TANK & PIPING SY COMPONEHRS ACL UO)6EE WALL PRODUCT, TENT AND VAPOR P.POO <br />W NA 6E UGHI GRED MA CANTutUANS VACUUM UTAIITOWNM, ALL TANK MERE SUMPS F0.L SUMPS AHD UISPENSER SOUPS <br />MM- BE MMUORE0 BY CONTINUOUS HSURDSTATC SENSORS AL TANKS ANN" SPACES MAN. BE UOM9dED BY <br />LAIONWS HYDROSTATIC SENSORS. ALL MOBTOif.YG DEMM & SYSTINS SHALL BE CERTIFIED FOR USE W CA IINOFR LC -113 <br />AND THE HAM)NAL LEAK O 1101 E NINWOWP. <br />i^ IN <br />TANK AND PIPING INSTALLATION NOTES <br />TZF <br />INSTALL THREE (3) 30.000 GAUDN 'OMTAIYUMT $OLUAMW DOUBLE WALL FIBERGLASS TANKS WITH HIMOSTARG AD.LIAR h <br />1X1 <br />O SPACE MONITORED BY'Y®ER ROOT' TLS-35UT TAM AND PIPING MONITORING ARD ALARM SYSTEM. TANKS TO DE SET UV. 50' gY <br />OB -OW TOM GRADE. SEE OM T-2 FOR ADDITIONAL WFTFU ATM. � SKEET T-3 FUH TANK WSTN.LATh7H REWIREME"M TANK <br />INS TOM SHALO BE IN ACONUANCE WTH MANUFACTURER'S iMSTA"TION LNORUCROIS ALL TANK FTL AND TURBME SWAB D <br />TO BE OWBLE WAIL AND NYBROSTAnCALLY MOITURED PER LG -162-% RECURMUNTS ALL TANK MOPS TO BE COUIFPE0 MRI <br />TIRE SUPPRESSION DEUCES AL TANK SOUPS AND ASST PENETRATIONS <br />iliilili••JJ„ (� <br />AUTCUATC FNIERG PRONACC AND VAPOR INTO THE SUPS A <br />STALL BE NOALUD BY FIaMO,AJS LIMITED CONTACT CHRIS SCHUN,Z AT (6511) 7w--BW0 TO CDOROiNATE INSTA um <br />c <br />(M INSTALL A Y MIN, murmKOEO WNGREHE SLAB MFR TANK$. SURFACE WATER SMALL BE DIVERTED AWAY FAN EACH MANHOLE <br />BY FORWND A CONCRETE CROWN MTH A Y DRIP W UV FROM THE EBOE OF THE MAIQKOLE MIND TO THE SJRmouNowo SUB <br />ELEYARm. TmR SLAB SHELL BE THICKENED AT TANK SUMPS TV BE NUST BELOW TOP OF TANK SUMPS SECONDARY COUANUENT <br />TERNIMRON PER M-2461 REQUREUERTS. OENSIT"T SLAB PFR CML SLAB LNSTALLARM DETAILS AND SPECIAL REWRIUMM <br />SHOWN DPI DETAILS 011 MX"93 T-4 AND T-5 <br />03INSTALL THREE (3) V EVR PHASE I APPROVED DUAL POINT FAIL ADAPTERS AND CAPS. <br />INSTALL MOCK (3) 3' EVIL PHASE 1 APPROVED DUAL PONT STAGE I VAPOR RECOSERY M"TERS AND CAPS <br />INSTALL ONE (1) FE PETRO IST 2 HP VAI SPEED TURBINE IN 311E PRIMARY 30,001 GALLON UNLEADED TANK (TANK 01 SERVES EIOT <br />SIDE). INSTALL 01NE (1) FE. PE1HO IST 2 HP VARIABLE SPEED MGM IN THE SECONDARY 30,000 GAILON UNLEADED TAM( (TANK j2 MOVES <br />ENTRANCE SluE THE Two UNLEADED RumMES MALL SERVE SEPARATE HALVES OF THE STAnm AS mm.. ME MoutDMY 30.000 GALLON <br />IRREAMR, TANK (TANK 12). SHALL OF SPHONED M THE PRIUARY USING TANK jF WRITHE SIPHON CHECK VALVE PORE <br />INSTALL WE (1) F.E. PERU) IST 2 HP VARIABLE S'EEO TURBINE W ME 30,000 GALLON UNLEADED PREMUM TANK (TANK PD TIE UIU A <br />MMUU TURBINE SHAH. SERVE BOTH HALVES OF THE STATON AS S10N4. <br />SET EACH UNDONE INTAKE AT G" FROM BQNON OF TANKS INSTALL MORE INTAKE FILTER SCREENS ON EACH TUAW4 - LIEHTIFY WITH A <br />BRASS LABEL. THE INSPEUSEAS SERVED BY EACH PRODUCT PIPE WERE IT PENETRATED THE TURBINE SUMP, CONTRACTOR 10 LABEL NU TIHES <br />AND CONTROLLERS AS TO MACH SAE DF THE STATION THEY MARE GREEN CONTROLLER LIGHTS ARE TO CO CUT WHCN TURBINES ARE CIF OR <br />LOSE POWER, MMUES TO BE EQUIPPED WTH 0.1 GPH PRF RF UNE LEAK DETECTION AND PLAID DETECTORS ARE TO BE TESTED FOR THE .1 <br />GPH LEN( EPE LECTION PH GO TO STMT W. COUnACTgL TO MGYDE TEST DATA AT THE TWIT M PUNCH UST INSPECTION AND SHALL BE <br />INCLUBCD W CLOSE OUT UNDER. <br />d INSTALL 4" OVER 3' DOUBLE WALL RUER6UISS (SMITH FTRERCAST) STAGE II VAPOR RECOVERY HEADER FOR VAC A59SDo VAPOR RECOIERY <br />S RNR SLOPE 1 PFR FOOT UIMUUU TO TANKS LL INSTA3' OWF3R 2' REMOA TEES WHERE HEATERS BRANCH TO CNs UsCSs. <br />CONTRACTOR 70 HSTALL TRACER WKE WTH VAPM Puma TESnHG OF VAPOR LINES SHALL BE PERFOAMED PRfOR TO DACCH." PRIOR TO <br />PAVING AND BEFORE STATION OPERATION. WUP PENETRATION SHALL BE ON LONG 9OF OF DISPENSER SITUP, VAPOR USES li,RTH MT SPACE <br />SHAT OF COYTNUCUSLY VACUUM MMRI RED PER LO -'62-1 R;OAREUMM INSTALL 3" OYER 2" DOUBLE FRP CRD550VR HMO TO ROUTE <br />O <br />VAAM TUBING BETWEEN TURBINE ANO FILL SIMFS <br />O <br />{q <br />3) 3' UVDT 2' OOVBIE WALL HBERGA53 (511RTH TBERCAST) GASOLINE SUPPLY LINES TO gSPENSERS. RMG SHE.W. 8E <br />INSTALL THREE (3)3-09 <br />W <br />� <br />INSTALLED PER MAMUFACN111 SPEGFICAROHS AID INSIRUcnTHw PRANG WMLL BE INSTALLED WTH A SLOPE OF 7/8" PER FOOT UOPUDM <br />O <br />FROM THE FURTHEST DISPENSER SUMP DOWM TIE MRRWE SOUPS CONTRACTOR TD INSTALL ui W wRE BIM mixxi T PINING TESTING <br />OF PRODUCT LNES SHALL BE PERTDRVIED PRIM 10 BASOILL FIRM TD PASHO AND BEFORE STARON OPERATION. PRODUCT fIJtES <br />T <br />RSA <br />pima TI& SPACE SHALL BE COMMUWSLY YAOUM MMIRMEC PER LO -102-1 REWMEMLNNS <br />INSTALL 'WEEDER ROOT TANK AND LOPE AJNVL CO NIM PARE NOBLL j TLS-35OR IN EW]PWENT ENCLOSURE OURDNG. SEE ELECTRICAL <br />TRAWNGS FOR EXACT LOC47M.INSTALL - <br />e2t75y1EL( <br />0 ( (1 6' OF MOT <br />1 OVER 2- STAL YNRE 1ZHUVENT�LN0. NTER5114TAL <br />AS 91d.. TO <br />TO .5 COi1RACTOR YFNT UNES SPACE <br />IN <br />YAW" MON! ED PER LG -I62 -T NTOAREIAEIIM INSTALL 3" O 2' DPIBLE FRP CROSSOVER PIPING TO ROUTE YAOIMM TUONO BETWEEN <br />VN <br />TURBINE ANO FILL SUMPS RE CROSS-ODNNECT PIPING WTO VENT VACUUM ZONE. <br />(u' <br />IO =MNATION PONT OF TMK WAIT TO BE A MMMUM OF 1Y ABOVE GRAVE AND NOT MIEN V FROM ANY WILIXNG CPETNG w PROPERTY <br />UNE THAT CAN BE BUILT UPON. VENT RISERS SOUL BE INSTALLED IN ACCORDANCE WITH UNIFORM ME OWE REWIREYERM. INSTALL TWO (2) <br />1' CONDUITS W/ PULL ROPE FROM MIT Mr M CONTROUFIT PA'CIGIAIAE FON NTURE TANK MALNOSTIC REQUIREMENTS <br />cr ASTM- TWEE (3) SHOE FLOAT TANK NTHUAR SPACE HWi)AOSIATC LO6T0RW0 SENSORS. <br />E2 mSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VERT A STAGE I YMM HEGOVEHY. <br />CM NOML .1 CPN MAO PROD: TANK LEVET GAUGES AT LOCATIONS SIDA4. <br />(W FAIRKS SHALL BE PAOPERLY MARKER AND TAGGED MIH STANDARD API IBURM;AT;m WA RAGS ANO O.NASS TAGS AT M.I. MANHOLES <br />0D INSTALL 3' OVER 2' DOUBLE WALL FIBERGLASS (WIN FTBEHCAw) ACTIVE SRIGi BE711Em Nn OCTANE TANKS AS SHORN. SLOPE R/4' PER <br />FOOT UP TO PRIMARY TANK (TNM jT)_ THE SIPHON ME WTERSTIRAL;SPACE WALL BE CONTINUOUSLY VACUUM MONITORED PER LG -162-1. <br />18 4FSTAIL POST (6) O46ARC0 MCORE-500 SFRES, SINGLE HOSE PDT SDE. MIAn�PRWUCT DSPERSFRS AS SHORAN. d5PENTERED <br />5 TO BE ETT <br />WTH VAPOR ASSIST STAGE 6 HOSES AND NOT^ Pc BREAKAWAY VALVES AND UNDER OSPENSER CONTMNUTNT INCLUDING PROMOT AND VAPOR <br />SHEAR VALVES, U047OW M SENSORS AND AUTOMATIC MUFFFE& DISPENSER SOUPS SHALL BE DOUBLE WALL TO AT LEAST TSE BOTTOM OF <br />!\ <br />CONCRETE TRIM STAD AND HrgROSTAMCALLY MONITORED PER LG -162-1 ONPUMCE OPRO4. All COAUTE ENTERING ME 0SPfN9N SOUP$ <br />O <br />SHALL BE PW COAIM ROD. SEE SHEET T -B FOR TYPICAL MSTAUATON MALS START UP DY OWNER'S RFPRFSENTATIM 46NU AL <br />[CNTRACTR TO PURGE LINES WITH H A MA" OF 20D GALLONS THROUGH EACH HCSE1110 .ANY AIR PDKTKETS OR STMT UP PROBLEMS <br />� <br />WE W PPROPLI HSTAdAnOP OT INCORRECT MIND THAT OLSMDYS ELECTRONICS WILL BE BILLED BACK 10 THE CONTRACT TIER <br />WRONG TEE PROO)CT LINES OF AW AND BEFORE TINE A/L lESi3N0, CgHTRACTOI IS TO REPL/,CE ME FACTORY INSTALLED CASOJNE FALTERS <br />MTHTHEOWNERSUPPLIEDFRLTERSALL CONDUIT ROEIIID TO gSPEN SRS SHALL BE PVC COATED WGO.17 <br />IN <br />HLL AUTO STAGE I VAPOR REWVERY WSRS & MWULAR USER SHALL ME ORWNDED TO PREVENT STAW 01SGIAROE WRING RILING <br />CPERABONS SEE TANK EIECIRKCAL MAUNGS. <br />NEW <br />OOHHECTORSD TARKSFROMRE INVALLED PER <br />RE O F MINM <br />THE TAMC SUMPS TO THE VAPOR RENLWCW YENM TOLD. MEAND <br />USC SSHHAH. A M FOR 44 FEET W N NO <br />RUN PRIOR 70 PENETRATION INTO ANY SUMP CA CHANGE OF gRECTOF OF YORE THIN An DEOi PPR MNNFACMERS INSTALIATON <br />4ppF[5511,h.. <br />REWINEIN£R1S <br />i <br />19 WE OWNER'S REAL. ESTATE DEPARTMENT BILL IDENTIFY` THE UST AGENCY HAYNO .umsDtonom. ALL IMTAL DEUVEAY REWAFMFHTS AND <br />i <br />TORUS AND SEND TO CONSULTING FRONTIER(N)LVANIHM PM) FOR DISTRIBUTION AND SIGNATURES CM RING EHdNFER (MPLYANNY02 PM) <br />6 <br />SHAl1 SECURE THE OWNER'S AND INSTALLER'S WGNANRES AND 01ORIBUTE FORMS TO THE RCA. ESTATE DEPARIUENT, THE D%HEKS <br />CASGUNE OPERATMS DEPARTMERT, WEciliniAL COURACTON APA THE UST AGENCY HAVING knit EOOW. REWIRED FO¢YS TFP[CM-Y <br />INCWDE, BUT ARE NOT COATED 7D UST RMSTRATION, UA NOTPCATON AND UST CERTIFICATION. ALL AUTHORITIES HANKO ,UNIMCNON <br />SHALL RE SA09TED AND MITTEN wCU <br />C/Y 1L <br />1NMAL OWVMY REWWFMPITS NENTARM SRT TO COMOO YMGIESASE CASOME OPERATIONS PWON <br />M ORDERING GASOLINE GASOLINE DELIVERY AND ALL TANK TESTHG EENT. BE COYP[ETE PRIOR TO OPM91G, <br />if <br />OF CAL% r <br />J HEW VWVUF ROOT WN NEVER AT EACH NEW OSPENSCI : AND A NEW VEEDEA-ROOT VAPOR PRF5SUBE Sfms* AT aiwzwsFR <br />INSTAL (I0.0AST <br />i0 THE TANKS PTR CARR EYEWIAE ORDER VR -202-A COMPLANCE REINWEMEMS. SEE STERE T-6 FDR UOTN wm <br />DLOCXNEOECALS <br />COMPLIANCEIINOTES <br />L AN <br />1, ARMMTCMRAD GYL DRAWINGS SHA3L TAKE PRECEDEMCE FOR RESFAFHCNO All BINEN90NS PROPEII Y UNES, EIEVAE.T AND <br />SS <br />EOOPNEMT LGCAMMS <br />Z ALL DIMENSIONS MPD CONDITIONS WALL IRE CHECKED ANO VERIFIED W RTE TIED BEFORE STARTING MY WOG(. ANY OSCREPANCY SHAT BE <br />CALLED TO THE ATTENTM OF THE O'M'ERS CONSTRUCTION PM OR MG2 PM FOR HIS M09C N ECTME PRCOEEUWG NM IDLE ROHN. <br />I GENERAL COUPACTOK SHALL OBTAIN HECESSMY FEW11T FROM APPLICABLE AULNOES FOR EXCAVATEMS OF TRENCHED 5-0' OR MORE IR <br />dk <br />DEPTH INTO WHICH A PERSON IS REWIRED TO DESCEND. <br />A AN UlM3THO12ED RELEASE RESPONSE PION MUST DE SUBMITTED AND I(YPROVTD BY GOVERNING AGENCY PRIOR TF TANK WERATIOMS <br />5. ALL MATERIALS SHALL BE COMPARABLE WIN USE FOR THE INTENDED PUIWDg AS PER NATGNALY REWGRZED COWES, LOCAL CODES AND <br />GOVERNING AMMONITES <br />YF <br />0. THE UkOERCROUID STORAGE TANK SYSISM WALL BE COPPATDIE WME PRODUCT STONED. <br />� <br />Y. ALL MM TOINO DEICES MAIL BE INSIONLED'PER MAUFACIURER'S siEConCATONS <br />oo <br />N <br />6. GBIPRAL CONTRACTOR IS REQUIRED TO MOVIOE 72 HOUR (TYPIC)I.) HOTFICATLM 70 COVERMUC AGENCY POOR 70 TANK INSTALLATION. <br />x <br />j G <br />t <br />A TANK AND PIPMOUST SYSTEM TO BE MINER'S IBRD PARTY iN$PECTOR & GOVEISHWG AGENCY AT FOUR (4} <br />4 <br />ME SPE SI <br />SEPARATE <br />M=ME <br />o <br />R NO HOLE SOAP <br />A TANK NR HESE BEFORE SETPUNOIWO W HOE AND SOAP TEST. <br />B. <br />INN r ALL CGRO HY CONTAINULYMENT, IN PNNMATCAI G. IN ACC FGR 30 N H <br />C INSPETMKCTION ALL Y CONFAWMENF, UNO.VONO TESIWO, IN ACCORD OF NTH <br />Z <br />N N <br />VAINuFACA IC MINES. <br />WKIELWES. <br />N b <br />FINAL mGTwRETT3 <br />P, FINAL WSIECAGA NtllA1NC ALL PORTWS a THE LEAK OETECIPII ST$TTl <br />1A, Alt TANK SUMPS AND UNDER DISPENSER CONTAAlor AMPS SNAIL BE HYwaswTCAILY TESTER (LAKE TEST) MM $FADING WATCH TO <br />TOP IREQUDNG COLLAR FIXE A PEPoKMI OF 24 HOURS TO INSURE THAT INE SUMPS ARE WhlrnT T. RECORD ME LEST RESATS AND <br />SUBMIT TO OWNERS CONSTRUCTION PU OR MU PY. <br />11. TANK SYSTEM, LEAD( 0CWCTDRS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVTRNLYG AGENCY PRIOR TO <br />e4d <br />TANK SYSTEM BEING PLACED IN OPERATION. <br />d0 <br />12.HUM TD FIIEL BEING PUMPED, STATM MUST RAYS YFEOEH ROOT FUNGUON.LL MD womimNC ANwAAR $PACE$ OF FNM AND OSPENSEN <br />J <br />`� <br />M PAUCRI OF ALL APPLICABLE UST CPERATHO FEES SHALL BE SUBMITTED M THE OMRMAd MISgGTMN WTR4 SOI DAYS GF TRE F➢OL NiECTKN. <br />n <br />H. EVIOEIJ[E CF TIlANGM ftESPONWSUIY SHALL BE SLBUITiE6 TO GOVERNING AGENCY (BY OWNER). <br />t <br />�vai <br />16. MME AIA UM. SUMPS SHALL BE LGUyPED MPR WOHOSTHICTI'E gX3'WMNWATHO LLYEL INOCAR40 SENSORS USTED AND APPROVED PER <br />H GONg <br />Lc- I& WATER ALERT ONLY AcRYATEEO AT V MTH 72 HOUR MAWIEHANLE WANOOYP BFSORE Posmw 51UNOOMN. IUMTOATE POSTALE <br />WUTDCM UPON MY GASCUNE OA WAVER LIVER AT OR ABOVE S. <br />16. TANK TTV MEIHOO, BEFORE THE UNDERGROUND STORAGE TANK IS PlAiEO INTO USF, THE UNDELOIOUHD STORAGE TANK 91ALL RE RCOBB <br />AFTER INSTALLA71M USNG DINE OF TIE FOLOWNG METHODS TO DUMONSTRATE TWAT THE TANK SYSTEM Is MoDDCT 11GHT: <br />I) ENHANCED IFAK OElECTON F1.0 TEST (TRACER ItWT w) BY HIIA%hIR Oft SICENSED JFTIUAIE. <br />TEST THAT HAS 1 CERTUED 8Y A <br />'~ <br />2 AN WMT CAS PRESSURE T: PARTY AND APPROVID BY RIF 00 NO <br />3) A TEST METHOD DEEMED EQUIVALENT iD ENHANCEDLEN( DElECT01 OR AN INFAF CA$ PRESWIRE }EST BY THE BORN IN REGIP.A MS <br />ADOPTED WRSTAfNT TO THE APP•eNCAB1E GAMIER W TIKE CODE AN MDERODUND STORAGE TAG( INSTwm AN 7E$lED IN <br />ACCORDANCE NTH THIS SECNON IS CQ WT FROM TEE REQUIREMENTS W CALIFORNIA HEALTH AM SAFETY CODE SECTION 252925. <br />