|
COSTCO
<br />VICINITY MAP
<br />LOCATOR MAP
<br />4E
<br />wall.
<br />al ROUT N
<br />MON DR
<br />PROPOSED TiWNSFORMER .
<br />LIX'llnON � .
<br />INSTAL OVERFILL HARM
<br />AND ACKNOWLEDGE, $A"
<br />INSTAL EMERGENCY PUMP SHUTOFF
<br />SWiYGI PER UFC REQUIREMENTS
<br />8
<br />3' OVER 2" HU
<br />6
<br />4' ONR 3' FRP
<br />A
<br />3" oVEA 7
<br />PER FF.
<br />6
<br />3" OVER v FT
<br />(m)
<br />3' OVER 2"
<br />4' OWSR 3"
<br />3' OVER 2'
<br />(TYP.)
<br />HOSE PER
<br />KT MW
<br />GROUND WATER LEVEL NOTE.
<br />A 5095 REPORT OF THIS SUE LOCARCH HAS REVEALED THAT
<br />GROUNDWATER WAS ETNCOLIN RED Al D TO 10 FEET RFLOiAI THE
<br />CKWNU SURiACE WITH A MACMUU EXPLORED DEPTH OF 26.S FET.
<br />TANKSSHALL BE WSTW LFS w CONCRETE IMABUEN AND RATER
<br />FABRIC PER WNURWCIURERS' CUMUMMES. TNN( Fi(CAVAT IN 9
<br />Be PTR DELA REOUREMENTS ANO BE PERFORMED TOIOMNG ME
<br />RECOMUEN'OVTONSOF THE SOR
<br />, ILS REPOT
<br />SOILS REPORT N':
<br />KTFMiTES BTA.
<br />NO.
<br />2626 FIST MYRTLE STREET
<br />STOCKTOR, CA 95205-4794
<br />(2091
<br />CARL FRMOSCD HENDERSON. P.E. LICENSE j7i115
<br />REPORT j 81050.001 MAY S. 2007
<br />TANK EXCAVATIONNOTE-.
<br />TAP( EKCIVARMS $HALL BE PER 05TH HBOUIREMENIS ANA BE PERFORMED
<br />FONLDMNO THE RECOMMERDATIONS OF THE SODS REPORT. TANKS
<br />aC1VARMS THAT REWRE SHOAWO $RVA BE ENGIN w AND PFRMNTUI
<br />SFPAAA3EY AND Sl BE THE RESPONSIBILITY DF THE W &U NC
<br />CONTRACTOR.
<br />BR��EL, DROP�REQUIREMENT.-
<br />PHOT TO FUEL Dow. THE G.C. SHELL HAVE THE VFEDER AGOT MONITORING
<br />SYSTEM! OPEIUl10.WL COSTCO )MOLEStlE RILL HOT SmCD AE FUE TDR
<br />DEWERY UNITE THE NUKISORNAH HAS AF7H W THE SHE FOR FIRST
<br />FLET. DROP, IEEDCO ROOT IS OPERATIONAL AND MONHNONG ME
<br />TANKS/UHES AND THE SIZE i5 ADCEssUTE FOR FUEL TRUCKS
<br />WHIR011FR
<br />ENCLOSURE
<br />41IN1TALL EUERCENCY Ml
<br />SRUTOFF SMTGI PER UFC
<br />REQUIREMENTS
<br />AND
<br />BASED ON FIELD SURVEYS AND 'S-WAT' RECORDS. THE GENERAL CONTRACTOR
<br />SHALL 'POTHOLE' THE EMONO MKHIES TO YPTUY THE DMETER AND LOCATION
<br />(INCL, ELEVATORS) PRIOR TG CONSTRCICILON. ANY gSOREPA CIES W THE
<br />LOCATION OF THE E)RSRNU RPE OR INCGMPARBHHY OF WE DESIGN WALL BE
<br />DROUGHT N ME IMMEDIATE ATTENTION OF THE MOMS RURESENTAIVE, AND
<br />'F
<br />BAARGHAOOMW CONSULTING ENGINEERS (425-251-6222).
<br />V I U I 1 CONONJ I}NOTE'
<br />CAV=*
<br />TSE CONTRACIOR SHALL BE RESPOISIOM-FOR VER7YING TSE LOCATION.
<br />MUNSON '
<br />U NSCU, ANO DEPTH OF ASL RAISING UTILITIES WHETHER SHORN ON THESE
<br />PLANS M NOT BY POT HOLING AHE UTAMES AND SURVEYING TIE HO)ZONTAL
<br />ANO VERICAL LOCATION PRIOR TO CONSTRIXIMM THIS SHALL INCLUDE CALWO
<br />UTUTy LOCATE O 1 (8M1 227-2600 AND THEN POT HOWNC All OF ME
<br />E)RSBNG UTUTES AT LOOCGATOES W NEW Brim CR059NGS To PHYSICALLY
<br />VERFYWHETHER M HOT CMUi EIOST. LOCATIONS OF SAID UTILITIES AS
<br />"m ON THESE POUFS ARE BASED UPON THE UNVERIFIED POBLIC INFGRMANOH
<br />AND ARE sUB.IECT TO VAHMM ATIF CONFLICTS SHOULD OCCUR THE CONTRACTOR
<br />SHALL CCHMT vMMAUSEF COLSULw; ENOPPEERs. AHG TD RESOLVE ALL
<br />PROBLEMS AIDS TCI PROCEDIHG 9ATN CONSNRUCnou.
<br />EWATERING NOTE-
<br />RASW UPON THE GEOTECHWM. REPORT, UEWARA W DT THE TANK
<br />EXCAVMM MY BE PE.OUM. OA. WW1 CONTACT THE Ll ' STORY
<br />WATER DIMEDY AGENCY HANKY 3U�OICNPN OVER THIS PROTECT AND
<br />OMAN IR IMUREMFNTS FOR OSCHMICNO TO WEIR STORY Ma
<br />FM11nC5.
<br />SHEET INFORMATION NOTE=
<br />RISE SHEET WFORIAYTON PRMDCD BY MEA A, WRIGHT. FILE WALE
<br />A06654�p"-01-24-20D].ZR9, OPTED 09.04.07.
<br />�■ �l�r�►Tir."�3l��G�7��1
<br />rol1_►�1�
<br />UTlAFAOP I I III UNREAD® I I I REAIILI
<br />SOK GA. 30( GAL III II "PGAL
<br />0 scar o}"' p 1 (90 0) WO 2600 UNDERGROUND TANK AND PIPING SITE
<br />• YOAOl1� '
<br />dG
<br />0 (]) 2" OA. SLAG( STEN
<br />P LETIT Dik CORROSION
<br />T-2 PROTECTED 70 GUOE.
<br />PAaNT MKTE
<br />- J 3NSTALL HEALY arm(TTP. OF 3) T� AR SEPARATOR ON 4'KC
<br />NNORICUM CONCRETE PAO
<br />(�Di.EVEL GAUGE (M. OF 3)
<br />22' MANWAY (TYP. 3 PLCs.)
<br />or
<br />GENERAL NOTES �
<br />PLP91C EEOND -I- - gFJa6sSmM MNOFRKRWND UITlIIKs
<br />[NAlE4. GAS, 1ELEPIKRE. 5FW'ER)
<br />-�--- -- - - 3' owe r Dass: wAu F®IGASS PRCGGCT RwNe (WDM TOAVST)
<br />0
<br />- - - - - - - - - - - - - 3' OVER Y DOUBLE WAIL FOUIRLASS WENT PPONG (SMITH FI6MGVSl)
<br />4' MFR 3. OR a OVER 2 00491E WNL FIBERGASS VAPDN RtGOIERY PPWP (STAINS HE+EROAST)
<br />6Fn�
<br />E^
<br />O
<br />SOME, MXCATES DISPENSER R EMW SNF POWTM
<br />GRUNT AND A E9 UTUR IS HEii I ASSURE THAT THE OND CUT SBASED MEETS ME DE LD
<br />1VI0 TND CSTALLAIOI IS PFRNTTD 10 AOA/5F 4Zi AND OUTS BASED ON ACTUAL FlDLP
<br />Z
<br />MDIT
<br />COIdTONS AND IHSTAUIRM TRGLNTOLES
<br />A
<br />FROOUC1 YMOR AND VENT M40 M TO SLOPE TOWMO IAAF( 1/6' PER FOOT MINIUM. 1/4' PER FOOT PRiFERHE➢. SIPHON -
<br />AND VENT STACK PIFIIRN TD SLOPE 1/E' P N FOOT,
<br />Ii
<br />• W33MD/RY CONTAINMENT HMG IS WOW BY NONE pELY. NOT GDAPU C Y. All PRODUCT. %.T AA VAPOR REOWERY
<br />O LL
<br />MMO TG BE DOUBLE CMTAT9R "BIER- 5 PPE FOR OUTMONS REGARdNG F63 BOVDER CEMPICATIW ANO/CR
<br />OWN,
<br />41IN1TALL EUERCENCY Ml
<br />SRUTOFF SMTGI PER UFC
<br />REQUIREMENTS
<br />AND
<br />BASED ON FIELD SURVEYS AND 'S-WAT' RECORDS. THE GENERAL CONTRACTOR
<br />SHALL 'POTHOLE' THE EMONO MKHIES TO YPTUY THE DMETER AND LOCATION
<br />(INCL, ELEVATORS) PRIOR TG CONSTRCICILON. ANY gSOREPA CIES W THE
<br />LOCATION OF THE E)RSRNU RPE OR INCGMPARBHHY OF WE DESIGN WALL BE
<br />DROUGHT N ME IMMEDIATE ATTENTION OF THE MOMS RURESENTAIVE, AND
<br />'F
<br />BAARGHAOOMW CONSULTING ENGINEERS (425-251-6222).
<br />V I U I 1 CONONJ I}NOTE'
<br />CAV=*
<br />TSE CONTRACIOR SHALL BE RESPOISIOM-FOR VER7YING TSE LOCATION.
<br />MUNSON '
<br />U NSCU, ANO DEPTH OF ASL RAISING UTILITIES WHETHER SHORN ON THESE
<br />PLANS M NOT BY POT HOLING AHE UTAMES AND SURVEYING TIE HO)ZONTAL
<br />ANO VERICAL LOCATION PRIOR TO CONSTRIXIMM THIS SHALL INCLUDE CALWO
<br />UTUTy LOCATE O 1 (8M1 227-2600 AND THEN POT HOWNC All OF ME
<br />E)RSBNG UTUTES AT LOOCGATOES W NEW Brim CR059NGS To PHYSICALLY
<br />VERFYWHETHER M HOT CMUi EIOST. LOCATIONS OF SAID UTILITIES AS
<br />"m ON THESE POUFS ARE BASED UPON THE UNVERIFIED POBLIC INFGRMANOH
<br />AND ARE sUB.IECT TO VAHMM ATIF CONFLICTS SHOULD OCCUR THE CONTRACTOR
<br />SHALL CCHMT vMMAUSEF COLSULw; ENOPPEERs. AHG TD RESOLVE ALL
<br />PROBLEMS AIDS TCI PROCEDIHG 9ATN CONSNRUCnou.
<br />EWATERING NOTE-
<br />RASW UPON THE GEOTECHWM. REPORT, UEWARA W DT THE TANK
<br />EXCAVMM MY BE PE.OUM. OA. WW1 CONTACT THE Ll ' STORY
<br />WATER DIMEDY AGENCY HANKY 3U�OICNPN OVER THIS PROTECT AND
<br />OMAN IR IMUREMFNTS FOR OSCHMICNO TO WEIR STORY Ma
<br />FM11nC5.
<br />SHEET INFORMATION NOTE=
<br />RISE SHEET WFORIAYTON PRMDCD BY MEA A, WRIGHT. FILE WALE
<br />A06654�p"-01-24-20D].ZR9, OPTED 09.04.07.
<br />�■ �l�r�►Tir."�3l��G�7��1
<br />rol1_►�1�
<br />UTlAFAOP I I III UNREAD® I I I REAIILI
<br />SOK GA. 30( GAL III II "PGAL
<br />0 scar o}"' p 1 (90 0) WO 2600 UNDERGROUND TANK AND PIPING SITE
<br />• YOAOl1� '
<br />dG
<br />0 (]) 2" OA. SLAG( STEN
<br />P LETIT Dik CORROSION
<br />T-2 PROTECTED 70 GUOE.
<br />PAaNT MKTE
<br />- J 3NSTALL HEALY arm(TTP. OF 3) T� AR SEPARATOR ON 4'KC
<br />NNORICUM CONCRETE PAO
<br />(�Di.EVEL GAUGE (M. OF 3)
<br />22' MANWAY (TYP. 3 PLCs.)
<br />or
<br />GENERAL NOTES �
<br />PLP91C EEOND -I- - gFJa6sSmM MNOFRKRWND UITlIIKs
<br />[NAlE4. GAS, 1ELEPIKRE. 5FW'ER)
<br />-�--- -- - - 3' owe r Dass: wAu F®IGASS PRCGGCT RwNe (WDM TOAVST)
<br />0
<br />- - - - - - - - - - - - - 3' OVER Y DOUBLE WAIL FOUIRLASS WENT PPONG (SMITH FI6MGVSl)
<br />4' MFR 3. OR a OVER 2 00491E WNL FIBERGASS VAPDN RtGOIERY PPWP (STAINS HE+EROAST)
<br />6Fn�
<br />E^
<br />O
<br />SOME, MXCATES DISPENSER R EMW SNF POWTM
<br />GRUNT AND A E9 UTUR IS HEii I ASSURE THAT THE OND CUT SBASED MEETS ME DE LD
<br />1VI0 TND CSTALLAIOI IS PFRNTTD 10 AOA/5F 4Zi AND OUTS BASED ON ACTUAL FlDLP
<br />Z
<br />MDIT
<br />COIdTONS AND IHSTAUIRM TRGLNTOLES
<br />A
<br />FROOUC1 YMOR AND VENT M40 M TO SLOPE TOWMO IAAF( 1/6' PER FOOT MINIUM. 1/4' PER FOOT PRiFERHE➢. SIPHON -
<br />AND VENT STACK PIFIIRN TD SLOPE 1/E' P N FOOT,
<br />Ii
<br />• W33MD/RY CONTAINMENT HMG IS WOW BY NONE pELY. NOT GDAPU C Y. All PRODUCT. %.T AA VAPOR REOWERY
<br />O LL
<br />MMO TG BE DOUBLE CMTAT9R "BIER- 5 PPE FOR OUTMONS REGARdNG F63 BOVDER CEMPICATIW ANO/CR
<br />AB-RT81 HMO UEMMO$ ANO STANDARD$, PLEASE CONTACT SCOTT WILSON AT (425) 4621- 5i¢
<br />• IT IS WE IN 11N7 OF THIS OEM TO PRIAIDE A TARK & MARK SYSTEM COMPLUNT PARI M-2461 REMREMENTS FOR
<br />1
<br />CONONOIS U I WRING OF ALL TANK & PIPING SY COMPONEHRS ACL UO)6EE WALL PRODUCT, TENT AND VAPOR P.POO
<br />W NA 6E UGHI GRED MA CANTutUANS VACUUM UTAIITOWNM, ALL TANK MERE SUMPS F0.L SUMPS AHD UISPENSER SOUPS
<br />MM- BE MMUORE0 BY CONTINUOUS HSURDSTATC SENSORS AL TANKS ANN" SPACES MAN. BE UOM9dED BY
<br />LAIONWS HYDROSTATIC SENSORS. ALL MOBTOif.YG DEMM & SYSTINS SHALL BE CERTIFIED FOR USE W CA IINOFR LC -113
<br />AND THE HAM)NAL LEAK O 1101 E NINWOWP.
<br />i^ IN
<br />TANK AND PIPING INSTALLATION NOTES
<br />TZF
<br />INSTALL THREE (3) 30.000 GAUDN 'OMTAIYUMT $OLUAMW DOUBLE WALL FIBERGLASS TANKS WITH HIMOSTARG AD.LIAR h
<br />1X1
<br />O SPACE MONITORED BY'Y®ER ROOT' TLS-35UT TAM AND PIPING MONITORING ARD ALARM SYSTEM. TANKS TO DE SET UV. 50' gY
<br />OB -OW TOM GRADE. SEE OM T-2 FOR ADDITIONAL WFTFU ATM. � SKEET T-3 FUH TANK WSTN.LATh7H REWIREME"M TANK
<br />INS TOM SHALO BE IN ACONUANCE WTH MANUFACTURER'S iMSTA"TION LNORUCROIS ALL TANK FTL AND TURBME SWAB D
<br />TO BE OWBLE WAIL AND NYBROSTAnCALLY MOITURED PER LG -162-% RECURMUNTS ALL TANK MOPS TO BE COUIFPE0 MRI
<br />TIRE SUPPRESSION DEUCES AL TANK SOUPS AND ASST PENETRATIONS
<br />iliilili••JJ„ (�
<br />AUTCUATC FNIERG PRONACC AND VAPOR INTO THE SUPS A
<br />STALL BE NOALUD BY FIaMO,AJS LIMITED CONTACT CHRIS SCHUN,Z AT (6511) 7w--BW0 TO CDOROiNATE INSTA um
<br />c
<br />(M INSTALL A Y MIN, murmKOEO WNGREHE SLAB MFR TANK$. SURFACE WATER SMALL BE DIVERTED AWAY FAN EACH MANHOLE
<br />BY FORWND A CONCRETE CROWN MTH A Y DRIP W UV FROM THE EBOE OF THE MAIQKOLE MIND TO THE SJRmouNowo SUB
<br />ELEYARm. TmR SLAB SHELL BE THICKENED AT TANK SUMPS TV BE NUST BELOW TOP OF TANK SUMPS SECONDARY COUANUENT
<br />TERNIMRON PER M-2461 REQUREUERTS. OENSIT"T SLAB PFR CML SLAB LNSTALLARM DETAILS AND SPECIAL REWRIUMM
<br />SHOWN DPI DETAILS 011 MX"93 T-4 AND T-5
<br />03INSTALL THREE (3) V EVR PHASE I APPROVED DUAL POINT FAIL ADAPTERS AND CAPS.
<br />INSTALL MOCK (3) 3' EVIL PHASE 1 APPROVED DUAL PONT STAGE I VAPOR RECOSERY M"TERS AND CAPS
<br />INSTALL ONE (1) FE PETRO IST 2 HP VAI SPEED TURBINE IN 311E PRIMARY 30,001 GALLON UNLEADED TANK (TANK 01 SERVES EIOT
<br />SIDE). INSTALL 01NE (1) FE. PE1HO IST 2 HP VARIABLE SPEED MGM IN THE SECONDARY 30,000 GAILON UNLEADED TAM( (TANK j2 MOVES
<br />ENTRANCE SluE THE Two UNLEADED RumMES MALL SERVE SEPARATE HALVES OF THE STAnm AS mm.. ME MoutDMY 30.000 GALLON
<br />IRREAMR, TANK (TANK 12). SHALL OF SPHONED M THE PRIUARY USING TANK jF WRITHE SIPHON CHECK VALVE PORE
<br />INSTALL WE (1) F.E. PERU) IST 2 HP VARIABLE S'EEO TURBINE W ME 30,000 GALLON UNLEADED PREMUM TANK (TANK PD TIE UIU A
<br />MMUU TURBINE SHAH. SERVE BOTH HALVES OF THE STATON AS S10N4.
<br />SET EACH UNDONE INTAKE AT G" FROM BQNON OF TANKS INSTALL MORE INTAKE FILTER SCREENS ON EACH TUAW4 - LIEHTIFY WITH A
<br />BRASS LABEL. THE INSPEUSEAS SERVED BY EACH PRODUCT PIPE WERE IT PENETRATED THE TURBINE SUMP, CONTRACTOR 10 LABEL NU TIHES
<br />AND CONTROLLERS AS TO MACH SAE DF THE STATION THEY MARE GREEN CONTROLLER LIGHTS ARE TO CO CUT WHCN TURBINES ARE CIF OR
<br />LOSE POWER, MMUES TO BE EQUIPPED WTH 0.1 GPH PRF RF UNE LEAK DETECTION AND PLAID DETECTORS ARE TO BE TESTED FOR THE .1
<br />GPH LEN( EPE LECTION PH GO TO STMT W. COUnACTgL TO MGYDE TEST DATA AT THE TWIT M PUNCH UST INSPECTION AND SHALL BE
<br />INCLUBCD W CLOSE OUT UNDER.
<br />d INSTALL 4" OVER 3' DOUBLE WALL RUER6UISS (SMITH FTRERCAST) STAGE II VAPOR RECOVERY HEADER FOR VAC A59SDo VAPOR RECOIERY
<br />S RNR SLOPE 1 PFR FOOT UIMUUU TO TANKS LL INSTA3' OWF3R 2' REMOA TEES WHERE HEATERS BRANCH TO CNs UsCSs.
<br />CONTRACTOR 70 HSTALL TRACER WKE WTH VAPM Puma TESnHG OF VAPOR LINES SHALL BE PERFOAMED PRfOR TO DACCH." PRIOR TO
<br />PAVING AND BEFORE STATION OPERATION. WUP PENETRATION SHALL BE ON LONG 9OF OF DISPENSER SITUP, VAPOR USES li,RTH MT SPACE
<br />SHAT OF COYTNUCUSLY VACUUM MMRI RED PER LO -'62-1 R;OAREUMM INSTALL 3" OYER 2" DOUBLE FRP CRD550VR HMO TO ROUTE
<br />O
<br />VAAM TUBING BETWEEN TURBINE ANO FILL SIMFS
<br />O
<br />{q
<br />3) 3' UVDT 2' OOVBIE WALL HBERGA53 (511RTH TBERCAST) GASOLINE SUPPLY LINES TO gSPENSERS. RMG SHE.W. 8E
<br />INSTALL THREE (3)3-09
<br />W
<br />�
<br />INSTALLED PER MAMUFACN111 SPEGFICAROHS AID INSIRUcnTHw PRANG WMLL BE INSTALLED WTH A SLOPE OF 7/8" PER FOOT UOPUDM
<br />O
<br />FROM THE FURTHEST DISPENSER SUMP DOWM TIE MRRWE SOUPS CONTRACTOR TD INSTALL ui W wRE BIM mixxi T PINING TESTING
<br />OF PRODUCT LNES SHALL BE PERTDRVIED PRIM 10 BASOILL FIRM TD PASHO AND BEFORE STARON OPERATION. PRODUCT fIJtES
<br />T
<br />RSA
<br />pima TI& SPACE SHALL BE COMMUWSLY YAOUM MMIRMEC PER LO -102-1 REWMEMLNNS
<br />INSTALL 'WEEDER ROOT TANK AND LOPE AJNVL CO NIM PARE NOBLL j TLS-35OR IN EW]PWENT ENCLOSURE OURDNG. SEE ELECTRICAL
<br />TRAWNGS FOR EXACT LOC47M.INSTALL -
<br />e2t75y1EL(
<br />0 ( (1 6' OF MOT
<br />1 OVER 2- STAL YNRE 1ZHUVENT�LN0. NTER5114TAL
<br />AS 91d.. TO
<br />TO .5 COi1RACTOR YFNT UNES SPACE
<br />IN
<br />YAW" MON! ED PER LG -I62 -T NTOAREIAEIIM INSTALL 3" O 2' DPIBLE FRP CROSSOVER PIPING TO ROUTE YAOIMM TUONO BETWEEN
<br />VN
<br />TURBINE ANO FILL SUMPS RE CROSS-ODNNECT PIPING WTO VENT VACUUM ZONE.
<br />(u'
<br />IO =MNATION PONT OF TMK WAIT TO BE A MMMUM OF 1Y ABOVE GRAVE AND NOT MIEN V FROM ANY WILIXNG CPETNG w PROPERTY
<br />UNE THAT CAN BE BUILT UPON. VENT RISERS SOUL BE INSTALLED IN ACCORDANCE WITH UNIFORM ME OWE REWIREYERM. INSTALL TWO (2)
<br />1' CONDUITS W/ PULL ROPE FROM MIT Mr M CONTROUFIT PA'CIGIAIAE FON NTURE TANK MALNOSTIC REQUIREMENTS
<br />cr ASTM- TWEE (3) SHOE FLOAT TANK NTHUAR SPACE HWi)AOSIATC LO6T0RW0 SENSORS.
<br />E2 mSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VERT A STAGE I YMM HEGOVEHY.
<br />CM NOML .1 CPN MAO PROD: TANK LEVET GAUGES AT LOCATIONS SIDA4.
<br />(W FAIRKS SHALL BE PAOPERLY MARKER AND TAGGED MIH STANDARD API IBURM;AT;m WA RAGS ANO O.NASS TAGS AT M.I. MANHOLES
<br />0D INSTALL 3' OVER 2' DOUBLE WALL FIBERGLASS (WIN FTBEHCAw) ACTIVE SRIGi BE711Em Nn OCTANE TANKS AS SHORN. SLOPE R/4' PER
<br />FOOT UP TO PRIMARY TANK (TNM jT)_ THE SIPHON ME WTERSTIRAL;SPACE WALL BE CONTINUOUSLY VACUUM MONITORED PER LG -162-1.
<br />18 4FSTAIL POST (6) O46ARC0 MCORE-500 SFRES, SINGLE HOSE PDT SDE. MIAn�PRWUCT DSPERSFRS AS SHORAN. d5PENTERED
<br />5 TO BE ETT
<br />WTH VAPOR ASSIST STAGE 6 HOSES AND NOT^ Pc BREAKAWAY VALVES AND UNDER OSPENSER CONTMNUTNT INCLUDING PROMOT AND VAPOR
<br />SHEAR VALVES, U047OW M SENSORS AND AUTOMATIC MUFFFE& DISPENSER SOUPS SHALL BE DOUBLE WALL TO AT LEAST TSE BOTTOM OF
<br />!\
<br />CONCRETE TRIM STAD AND HrgROSTAMCALLY MONITORED PER LG -162-1 ONPUMCE OPRO4. All COAUTE ENTERING ME 0SPfN9N SOUP$
<br />O
<br />SHALL BE PW COAIM ROD. SEE SHEET T -B FOR TYPICAL MSTAUATON MALS START UP DY OWNER'S RFPRFSENTATIM 46NU AL
<br />[CNTRACTR TO PURGE LINES WITH H A MA" OF 20D GALLONS THROUGH EACH HCSE1110 .ANY AIR PDKTKETS OR STMT UP PROBLEMS
<br />�
<br />WE W PPROPLI HSTAdAnOP OT INCORRECT MIND THAT OLSMDYS ELECTRONICS WILL BE BILLED BACK 10 THE CONTRACT TIER
<br />WRONG TEE PROO)CT LINES OF AW AND BEFORE TINE A/L lESi3N0, CgHTRACTOI IS TO REPL/,CE ME FACTORY INSTALLED CASOJNE FALTERS
<br />MTHTHEOWNERSUPPLIEDFRLTERSALL CONDUIT ROEIIID TO gSPEN SRS SHALL BE PVC COATED WGO.17
<br />IN
<br />HLL AUTO STAGE I VAPOR REWVERY WSRS & MWULAR USER SHALL ME ORWNDED TO PREVENT STAW 01SGIAROE WRING RILING
<br />CPERABONS SEE TANK EIECIRKCAL MAUNGS.
<br />NEW
<br />OOHHECTORSD TARKSFROMRE INVALLED PER
<br />RE O F MINM
<br />THE TAMC SUMPS TO THE VAPOR RENLWCW YENM TOLD. MEAND
<br />USC SSHHAH. A M FOR 44 FEET W N NO
<br />RUN PRIOR 70 PENETRATION INTO ANY SUMP CA CHANGE OF gRECTOF OF YORE THIN An DEOi PPR MNNFACMERS INSTALIATON
<br />4ppF[5511,h..
<br />REWINEIN£R1S
<br />i
<br />19 WE OWNER'S REAL. ESTATE DEPARTMENT BILL IDENTIFY` THE UST AGENCY HAYNO .umsDtonom. ALL IMTAL DEUVEAY REWAFMFHTS AND
<br />i
<br />TORUS AND SEND TO CONSULTING FRONTIER(N)LVANIHM PM) FOR DISTRIBUTION AND SIGNATURES CM RING EHdNFER (MPLYANNY02 PM)
<br />6
<br />SHAl1 SECURE THE OWNER'S AND INSTALLER'S WGNANRES AND 01ORIBUTE FORMS TO THE RCA. ESTATE DEPARIUENT, THE D%HEKS
<br />CASGUNE OPERATMS DEPARTMERT, WEciliniAL COURACTON APA THE UST AGENCY HAVING knit EOOW. REWIRED FO¢YS TFP[CM-Y
<br />INCWDE, BUT ARE NOT COATED 7D UST RMSTRATION, UA NOTPCATON AND UST CERTIFICATION. ALL AUTHORITIES HANKO ,UNIMCNON
<br />SHALL RE SA09TED AND MITTEN wCU
<br />C/Y 1L
<br />1NMAL OWVMY REWWFMPITS NENTARM SRT TO COMOO YMGIESASE CASOME OPERATIONS PWON
<br />M ORDERING GASOLINE GASOLINE DELIVERY AND ALL TANK TESTHG EENT. BE COYP[ETE PRIOR TO OPM91G,
<br />if
<br />OF CAL% r
<br />J HEW VWVUF ROOT WN NEVER AT EACH NEW OSPENSCI : AND A NEW VEEDEA-ROOT VAPOR PRF5SUBE Sfms* AT aiwzwsFR
<br />INSTAL (I0.0AST
<br />i0 THE TANKS PTR CARR EYEWIAE ORDER VR -202-A COMPLANCE REINWEMEMS. SEE STERE T-6 FDR UOTN wm
<br />DLOCXNEOECALS
<br />COMPLIANCEIINOTES
<br />L AN
<br />1, ARMMTCMRAD GYL DRAWINGS SHA3L TAKE PRECEDEMCE FOR RESFAFHCNO All BINEN90NS PROPEII Y UNES, EIEVAE.T AND
<br />SS
<br />EOOPNEMT LGCAMMS
<br />Z ALL DIMENSIONS MPD CONDITIONS WALL IRE CHECKED ANO VERIFIED W RTE TIED BEFORE STARTING MY WOG(. ANY OSCREPANCY SHAT BE
<br />CALLED TO THE ATTENTM OF THE O'M'ERS CONSTRUCTION PM OR MG2 PM FOR HIS M09C N ECTME PRCOEEUWG NM IDLE ROHN.
<br />I GENERAL COUPACTOK SHALL OBTAIN HECESSMY FEW11T FROM APPLICABLE AULNOES FOR EXCAVATEMS OF TRENCHED 5-0' OR MORE IR
<br />dk
<br />DEPTH INTO WHICH A PERSON IS REWIRED TO DESCEND.
<br />A AN UlM3THO12ED RELEASE RESPONSE PION MUST DE SUBMITTED AND I(YPROVTD BY GOVERNING AGENCY PRIOR TF TANK WERATIOMS
<br />5. ALL MATERIALS SHALL BE COMPARABLE WIN USE FOR THE INTENDED PUIWDg AS PER NATGNALY REWGRZED COWES, LOCAL CODES AND
<br />GOVERNING AMMONITES
<br />YF
<br />0. THE UkOERCROUID STORAGE TANK SYSISM WALL BE COPPATDIE WME PRODUCT STONED.
<br />�
<br />Y. ALL MM TOINO DEICES MAIL BE INSIONLED'PER MAUFACIURER'S siEConCATONS
<br />oo
<br />N
<br />6. GBIPRAL CONTRACTOR IS REQUIRED TO MOVIOE 72 HOUR (TYPIC)I.) HOTFICATLM 70 COVERMUC AGENCY POOR 70 TANK INSTALLATION.
<br />x
<br />j G
<br />t
<br />A TANK AND PIPMOUST SYSTEM TO BE MINER'S IBRD PARTY iN$PECTOR & GOVEISHWG AGENCY AT FOUR (4}
<br />4
<br />ME SPE SI
<br />SEPARATE
<br />M=ME
<br />o
<br />R NO HOLE SOAP
<br />A TANK NR HESE BEFORE SETPUNOIWO W HOE AND SOAP TEST.
<br />B.
<br />INN r ALL CGRO HY CONTAINULYMENT, IN PNNMATCAI G. IN ACC FGR 30 N H
<br />C INSPETMKCTION ALL Y CONFAWMENF, UNO.VONO TESIWO, IN ACCORD OF NTH
<br />Z
<br />N N
<br />VAINuFACA IC MINES.
<br />WKIELWES.
<br />N b
<br />FINAL mGTwRETT3
<br />P, FINAL WSIECAGA NtllA1NC ALL PORTWS a THE LEAK OETECIPII ST$TTl
<br />1A, Alt TANK SUMPS AND UNDER DISPENSER CONTAAlor AMPS SNAIL BE HYwaswTCAILY TESTER (LAKE TEST) MM $FADING WATCH TO
<br />TOP IREQUDNG COLLAR FIXE A PEPoKMI OF 24 HOURS TO INSURE THAT INE SUMPS ARE WhlrnT T. RECORD ME LEST RESATS AND
<br />SUBMIT TO OWNERS CONSTRUCTION PU OR MU PY.
<br />11. TANK SYSTEM, LEAD( 0CWCTDRS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVTRNLYG AGENCY PRIOR TO
<br />e4d
<br />TANK SYSTEM BEING PLACED IN OPERATION.
<br />d0
<br />12.HUM TD FIIEL BEING PUMPED, STATM MUST RAYS YFEOEH ROOT FUNGUON.LL MD womimNC ANwAAR $PACE$ OF FNM AND OSPENSEN
<br />J
<br />`�
<br />M PAUCRI OF ALL APPLICABLE UST CPERATHO FEES SHALL BE SUBMITTED M THE OMRMAd MISgGTMN WTR4 SOI DAYS GF TRE F➢OL NiECTKN.
<br />n
<br />H. EVIOEIJ[E CF TIlANGM ftESPONWSUIY SHALL BE SLBUITiE6 TO GOVERNING AGENCY (BY OWNER).
<br />t
<br />�vai
<br />16. MME AIA UM. SUMPS SHALL BE LGUyPED MPR WOHOSTHICTI'E gX3'WMNWATHO LLYEL INOCAR40 SENSORS USTED AND APPROVED PER
<br />H GONg
<br />Lc- I& WATER ALERT ONLY AcRYATEEO AT V MTH 72 HOUR MAWIEHANLE WANOOYP BFSORE Posmw 51UNOOMN. IUMTOATE POSTALE
<br />WUTDCM UPON MY GASCUNE OA WAVER LIVER AT OR ABOVE S.
<br />16. TANK TTV MEIHOO, BEFORE THE UNDERGROUND STORAGE TANK IS PlAiEO INTO USF, THE UNDELOIOUHD STORAGE TANK 91ALL RE RCOBB
<br />AFTER INSTALLA71M USNG DINE OF TIE FOLOWNG METHODS TO DUMONSTRATE TWAT THE TANK SYSTEM Is MoDDCT 11GHT:
<br />I) ENHANCED IFAK OElECTON F1.0 TEST (TRACER ItWT w) BY HIIA%hIR Oft SICENSED JFTIUAIE.
<br />TEST THAT HAS 1 CERTUED 8Y A
<br />'~
<br />2 AN WMT CAS PRESSURE T: PARTY AND APPROVID BY RIF 00 NO
<br />3) A TEST METHOD DEEMED EQUIVALENT iD ENHANCEDLEN( DElECT01 OR AN INFAF CA$ PRESWIRE }EST BY THE BORN IN REGIP.A MS
<br />ADOPTED WRSTAfNT TO THE APP•eNCAB1E GAMIER W TIKE CODE AN MDERODUND STORAGE TAG( INSTwm AN 7E$lED IN
<br />ACCORDANCE NTH THIS SECNON IS CQ WT FROM TEE REQUIREMENTS W CALIFORNIA HEALTH AM SAFETY CODE SECTION 252925.
<br />
|