My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Watertight { WTEI Turbine Enclosures for Fiber lass Rein forced Plastic IFRP) Tanks from Containment Solutions <br />7PITA{LAMENT <br />_lUTIQNS <br />0 <br />CHOOSE YOUR INDUSTRY Underground FRP Tanks <br />Petroleum Accessories: Turbine Enclosures <br />Lubricants Automotivti <br />Water / Wastewater Watertight FRP (WTE) Turbine Enclosure <br />Chemical <br />Stirvi€t The Watertight FRP Turbine Enclosure (WTE) body is mounted <br />on the tank collar. If a leakproof joint is required, cement the <br />enclosure body to the tank collar using the adhesive kit (Kit AD). <br />(it is recommended that the joint always be cemented.) All turbine <br />enclosures are supplied with adhesive kits. <br />• About SCSI <br />• Contact CSI <br />• Links <br />• Search <br />A minimum 36" diameter street box is required with all FRP <br />models to allow the removal of the FRP lid after the turbine <br />enclosure is installed. This also allows the removal of the manway <br />cover. <br />To leak test the turbine enclosure, use a standing water test. DO <br />NOT use an air pressure test. <br />WTE Features: <br />• Suitable for moderately high groundwater conditions <br />• Includes an FRP enclosure body (variable length in 12" <br />increments, 42" or 48" ID) <br />• FRP reducer (42" x 30" or 48" x 30" ID's) with o -ring <br />groove and o -ring gasket <br />• Push -on FRP lid (32.5" OD) with two handles <br />• Enclosure body is field cemented to the tank collar and the <br />reducer is field cemented to the enclosure body using the <br />supplied adhesive kits (Kit AD, two kits required) <br />• Reducer/enclosure body joint is on the exterior of the <br />enclosure body allowing easy field installation of the <br />adhesive without entering the enclosure <br />• Lid compresses the lubricated o -ring when it is pushed <br />onto the reducer top, providing a watertight seal with water <br />up to 12" over the lid <br />• Lid can be pushed into position by standing on the lid - <br />made with a non-skid exterior surface <br />. Lid includes two handles: One is offset to aid in the <br />removal of the lid and the other is centered on the lid <br />. 30" opening allows for the removal of a 22" manway lid <br />(28" OD) <br />• Enclosure must be vented at all times <br />http:llwww.containmentsolutions.com/products/underground_frp/accessoricslturbinefWTE.htmt 0 of 3)4120!20043:25:12 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.