Laserfiche WebLink
ISD Vapor Flow.Meter Installation Steps - Vacuum Assist System Above Shear Valve <br /> -r -T+7 <br /> T,5--rO- -7 a- <br /> _T, <br /> Before installing this device, turn Off, tagllook out power to the system, including console end submersi a I- -4 _T+7 _1 MWUW <br /> pumps. SMART 0- + + <br /> SElAOR <br /> g2amp <br /> 2, Remove the dispenser's lower sheet W <br /> noted doors to access the,vapor plumbing. <br /> —J W <br /> 3. Loosen any factory installed mounts and/or brackets necessary to provide roornto disconnect the vacuum SMART SENSIDS INTERFACE M06ulE I <br /> W Z :3 <br /> motor outlet plumbing. g PC 0 0 <br /> Atisch Cable shields;to Growid LL < <br /> 4� Disconnect the factory installed plumbing between the outlet of the vacuum motors and the field installed Lug Closest to Conduit Entry <br /> , 3 U <br /> plumbing above the vapor shear valvo,if present (gee example installation in Figure 1). Retain the ----------- W <br /> manufacturers installed piping for later use. <br /> This manual contains instructions to install aVeoder-Root ISD (In-Startion Diagnostic)Vapor Flow Molar in a 0 z (j) < W <br /> dispenser I a vapor return line i —J <br /> n vacuum assist. systems. par Flow Matter with , —J 0 Z <br /> 5. Remove my unneeded field installed plumbing above the vapor shear valve,The Va <br /> LL — W <br /> flanges attached can be used for sizing the required hoed space of approximately 8 inches.Approximately 3 P- — <br /> - - -------------------- -J <br /> This manual assumes all preliminary alto preparation is completed, and thatwiring from the consoloto. theyapor ) 1�-, an M Z <br /> Flow Meter junction box is in place and meststire.requirements set out in the TLS-3YX Series Site Prep manual, inchesof clearance is required on both,sides of the piping to accommodate this width,of themeter body. Z' M < <br /> Ft9d Conduit -< 0 <br /> of 0 —J <br /> 6. Working th rough theYacuum motor mounting plate, if present, cannect the upper flange to factory installed (antare Console <br /> plumbing. Note that this may need to be tomporari Suspended across'the vacuum motor in unfingplate through an f.S.Bay (L -1 0 W < <br /> ly a C) <br /> Contract" Certification Requirements while the lower plumbingwork progresses. . I . g g (3 <br /> 0- 0- 00 Z <br /> Y. install any plumbing and the lower flange that will dcnnect between the outlet ride of the Vapor Flow Meter ]So nowmeter#I ISD pressure Sainsor 03 < 0 <br /> Veeder-Root requires the following. minimum training certifications for contractors who will installarid Setup the and the shear valve or lower vapor return lina. Note: Elbows should be kept to a minimum (straight vertical Cs 0 <br /> ISD Mcwinnoten;and (J) C <br /> equipmerit discussed in this manual; F)Iurnbingispreferable)�Tc;.imoro�e efficiency andto4educe the Fiskof liquid trope, all horizontal Plumbing <br /> ISD Pressure Sensor <br /> musticepitched todrain., Is 101a) <br /> Level 1 Contractors holding valid Level I Certification are approved to perform wiring and concluit routing, 0) <br /> equipment mounting, probe and sensor installation tank and line preparation,and line leak 8. Clean all debris around the Unletand outlet plumbing priorto installing the Vapor Flow Meter. Do not blow <br /> vent do agin RgumG. Connecting Vapor Flow Meter to 8martSerl Interface Module <br /> detector installation. compressed air through the Vapor Flow Meter to pro m g the inte. mal sa,teens. of ac Of of 0 <br /> Level 213 or 4 Contractors holding valid LoW 2, S. or 4 Certifications are approved to perform installation 9. Install the o-fing into the lower mounfing flarigo. r- 1- r� <br /> cc CD C, <br /> chmokout,startuIp, programming and operations training, troubleshooting and, servicing for all i 0� Talm a anal(chips,debris, sealant, etoI does not enter the olaen.piping orVapor Flow <br /> V6oder-Root Tank Monitoring Syritemsi including Line Leak Detection and associated Mete g as'.. t'ly tfic's"n me'tot if E; �2 �2 <br /> accessories. care to that and then soonest the Vapor Flow Meter t the upper flange. Nato that the <br /> r ful insert the I <br /> flow arrow on the side of the motor body mu Sip oint down, <br /> Warranty Registrations may.only be Submitted Isy selected Distributors. P <br /> <KKK< <br /> 11. Connect the lower flange to the Vapor Flow Maten., <br /> Related Manuals . 12. Tighten any tome fittirigs and hardware <br /> of a rn For complete installation and operation <br /> Route the Wiring into the jurniction.1cm via the supplied dar grip. sae bly, <br /> �76012-879 TLS-3XX Series Consoles Site Prop Manual 14. Connect the wires from the Vapor Flow Meter to the field witing from the consola and sap With Wire nOts (See <br /> . 1 I ' ll , -11 %- . . 4 - instructions refer to: <br /> Figure M. <br /> 577013-800 In-StatiQn, Diagnostics Install, Setup Operation Manual <br /> 15. After all other ISD Vapor Flow Metem and the ISD Pressulre Sensor are installed, presourks the tank ullage RootTM -Sta <br /> Veeder In tion Diagnostics <br /> space and vapor piping torat least 2 inches WC and lest for leaks using leak detection solution. <br /> sitety Precautions , I . 1 1 ., .1 ' ' 1 11 � � ":. I ." 1 1, <br /> (ISD) Install, Setup, & Operation <br /> 77 -7 - - - - - - - <br /> The following safety symbols may be Used throughout this manual to alert you to important safety hazards and Base of dspenser cabind. -800 Revision E <br /> .0.rboautions. Manual Ni? 577013 <br /> EXPLOMVE FLAMMABLE Mum <br /> Fuels and their vy ors am extremely Fuels and tftorva�ors are extremely 1"N!"T <br /> explosive if gni-ted. flammable. threaded pipe.,,. UP <br /> 1-11.5'NPT xiir'�lealmppl� <br /> 5116xS/4" <br /> At , Iwo <br /> wkw4hors(typ) lFlaingewith.1.14PTIbreaded lrTetgyp� I W <br /> TURN POW&OFF J CQ <br /> < <br /> � Irl In I )5dstsln,I an dissup led Live p,ower to a device crashes a INLET op -1 inlet Fitior X.1,rabax 0 <br /> otential shock oz. potential shock herand.Turn Off <br /> '*�gm device A p 00 <br /> aid met, P <br /> =deMcoanclassociatod <br /> when servicing the Unit. st P P9 el) <br /> W 0) <br /> _J < <br /> Cable <br /> Ro Maer <br /> T- W <br /> -ADALLR USESAFETY BARRICADES <br /> RE ELATED MANUAL$ <br /> a res <br /> Knowledge,ofall mlaiedproc din Unauthorleed people orvehicTies in (AP wax.) <br /> cars to you a Spin work is important the work area am dangerous.Always <br /> I 3f <br /> Read and understand ail manuals use safety conosorbarricades, <br /> tho=f you do not undarstand =t%a d ortiala to block <br /> a an Youry coidgip 0 <br /> p ask sort who does. <br /> D <br /> �ou!oorin i g c; <br /> OR— <br /> saoll" <br /> f- (suourrien <br /> OUTLET <br /> Now OEM= supplied)) <br /> i I . . I -, X I I A. � 0 <br /> This product 16 Ito be Installed and operated In the fildfily combustible -11.5 NPT steal nitf;lo <br /> environment of a gasoline dispenser where flammable liquids and explosive Irsolllvilrpiirni�rl . I I , 1, 1 1 . ., <br /> and 13, <br /> vapors maybe present stampedin M wing fulng <br /> Italian,m I sly result in fire or explosio point[mcbm <br /> improper Insta ri causing serious Inju ry or . : I <br /> . . I . I I I. I I . ; <br /> death. T'n' IV" 0a"inn TLS Console <br /> The Tolowl -- ----------- ------ <br /> Fig hazards exist: Top ol v 5 sh <br /> =rdum ne a. <br /> :1. Electrical shockresulting In serlous Injury or death mayresultif poweirls cedestal island ------------- .tolada�lxr ------ <br /> L <br /> .on during Installation and the devIcols Improperly Installed. �Jl 4 <ZD <br /> o "S All 6 0 <br /> I-------------77-7- <br /> Product leakage could cause severe environmental damage or explosion <br /> resulting In dmth�Serious Personal Injury, property loss and equipment <br /> ��o --------- --- -------------------- <br /> darridge. <J Q D��l XaslpouJs14qnrai 1: .: , ., .. .. . % I . I . I .I 1 0 V . <br /> )0 -�4 <br /> observe the following Precautions: introducing livid Inrig <br /> 0 C�1- - TP-m4clynanio <br /> 10 00,��-- Vaporteturniotenk 0 <br /> I. Read and follow all Instructions In this manual,Including oil Solely, <br /> ul <br /> co Cr <br /> 2-Comply with,all apFfreabie codes Includilng:the National ElectricalCone; < <br /> ��60 kl�o 191"0 a Ll- <br /> federal, state;:and coal codes;and other applicable Safety codes. W <br /> 3. Before Install Ing thils device,turnoff,tagilmic out power.to the system, Figure i. ExamplievapoF flow hister hastallatlonAboveShearValve <br /> -J 0 <br /> including console and submersible Pumps, W <br /> 4.1 To protect yourself and others from being struck by vehicles, block pit <br /> area dijijob inSA <br /> youtwork otsiarvico�, <br /> S. Substitution of components may Impair Intrinsic safety. <br /> To <br /> siousnas. From <br /> interface Module,i , Flow Meter <br /> Before You Beon <br /> TESS/ <br /> find Veeder-Roo I t Techn cian mu I at be available. (on site) to assist in this typo of Epoxy seated connocEons,in a <br /> A level I or higher Carl HA BB <br /> instaflatio wimthorproofiunotion box <br /> Comply With all recommended safety practices identified by OSHA (Occupational Safety and Health Figure 2. Field wiring Vapor flow Meter.ObserVe polarity <br /> Adminotration) ancIpu am f en <br /> pay <br /> ip 130A <br /> Follow all installation re uiremeriteas per NFRA (National Fire Protection Association) 00, 80A, <br /> od 70 C I v I IL �X� <br /> Seal and Connect Field Wrin TV <br /> Review and comply with all thei safety Warnings in theirst Italian manuals and, any other national, State or Local., ctkC <br /> requirements, <br /> 1. �Seal Wire huts with epoxy sealant following the instructionsin Figure 5., <br /> A 2-conduclor, 18 AVVG shielded cable must be installedin intrinsically safe conduit from each dispenser to the <br /> intrinsically safe wiring compartment of the TLS console. 'o <br /> Debrisfrom plumbing modifications should be flushed throu In the piping System prior to installing the ISD -C Z Z <br /> Vapor Flow Meter. <br /> CA ON laintis irritating to eyes, respiratorysystern, and skin. Carl cause allergic skin reaction. <br /> 0 a to Seal pipe.threads I or as" <br /> UT' `EPax' <br /> 00 ins. <br /> U G I n a . ox resin and Cyclmliphafic epoxymboxylate..Precautions'Wear Suitable protective clothing, <br /> Se only UL recognized asfTFEyel ow Nation tape on all fittings: Do hot use piped p t I ep y <br /> gloy a <br /> fittings in and out ofthe ISD Vapor Raw Meter. eye,and face protection. Use only in well ventilated areas.Washthoroughly beforeea ing, drinkm.g, or <br /> kin <br /> Veeder-Robt Parts <br /> L] <br /> From probe, <br /> sarlsor or <br /> • Veeder-Root ISD Vapor Flow Meter (PIN 231847-001). transducer To console <br /> Makesuraftl <br /> • Sensor Installation kit. See Table 1 , rho ends of cable <br /> sub- <br /> sheathing are <br /> merged In sealant T,a vula p h; <br /> Table I�-Vapor Flow,Meter installation Kit(PIN 330020445) <br /> Wire nuts <br /> guy, Descr.liation PIN of <br /> Rom <br /> Instructions: U) <br /> I ISI)Va, porFlow Meter 331847-OQ2 NOTE:when temp I eratureis beIoVy50'FJ10'C),Imep resin in 4� Mix.1.huoughly to a Uniform color by aquas I zing contents X <br /> a warm piece prior to mixing log,in an ansIdepocket next . back and forth 25-30 times. < n <br /> 2 Rangowith V NPTthroadedhote 232091-001 5 Squeeze mixed,wam resin into one end of bag ardegloff Z <br /> to body). other end- :5 M on <br /> 1.Opari epoxy sealant package,and remove resin palk. LLJ N C-J 0 <br /> �4 6/16-19 UNC-212x314"Irex head bolt 51410QA26 6 Slowly hiserl Mail connections into sealing rck Until they In C-4 00 .0 6 <br /> 2 Holdin resin u 0 <br /> 9 pak as shom In A, bend pak along long fit snugly against t a opposite end as shovai n C. <br /> length. 7.Tivist open sort of bag and me tie%mp to Close It off and 0 00 (a OD 95 <br /> 4 2 1-11.6 NPT x 2 male to male threaded 576008-656 position the fie wrapped end up until the resin)ails. Z on <br /> steel nipple 3.As shown In B,fionly squeeze the HED SIDE of the resin, <br /> forcing it through the center seal and Into BLACK SIDE. t, <br /> 6 1 Inlatilter 332092-001 4 cn -6 <br /> E <br /> U0 <br /> 6 1 Cuthet 0-ring (Parker slze 0 2-218,Nitric) 512700-M to n <br /> cli Z cli C14 S <br /> Figure 5. Epoxy sealing field whing <br /> 7 1 Cord gnip�N)Lp 331028-001 <br /> 8 1 Sealing pack <br /> 514100-304 2. Push the epoxy sealed bag into the junction box. Replace and tighten the junction box cover. 0 *OV <br /> 6 <br /> 9 2 Wire nut 576008-461 S. Terminate field wiring into TILS Console and connect to Smart Sensor Module located in the Intrinsically safe <br /> 10 2 Tie wrap 5109 01-337 wiring compartment of the TLS as shown in Figure 6. Note: you must obsenie polarity! Also, the cable length <br /> between the console and sensor must list exceed the distance Stated in the TLS-3YX Site Prep manual (P/N <br /> 11 4 5/16"Lockwasher 514100436 5M13-879). <br /> 4. Replace the lower sheet metal doors in the dispenser. . <br /> 504 of the National Electrical <br /> Note:Intrinsically safe devices must be installed in accordance witInArticle <br /> Code,ANSIJNFPA 70,for installation in the United States, or Section 16 of the Canadian Electrical Code for <br /> Tools Required <br /> installations in Canada. <br /> This intrinsically safe flow meter P/N 331847-001, has only been evaluated for connection to a LIL listed TLS- <br /> 1 . Pipe wrench suitable for tightening I�inch NPT pipic� 850 Series Liquid Level Gauge I Leak Detector. <br /> it <br /> �v <br /> 2. 1 /2" socket wrench to install Vapor Flow Meter flange bolts. <br /> 3. Necessary pipe fifter's equipment and a non-hazardous work space suitable to modify dispenser vapor line for <br /> 0 <br /> Vapor Flow Meter installation,when necessary. <br /> W <br />