My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISD Flow Meter Installation Guide Before You Begin <br />This product is to be installed and operated in the highly combustible <br />environment of a gasoline dispenser where flammable liquids and explosive <br />vapors may be present. <br />Improper installation may result in fire or explosion causing serious injury or <br />death. <br />The following hazards exist: <br />1. Electrical shock resulting in serious injury or death may result if power is <br />Jon during installation and the device is improperly installed. <br />2. Product leakage could cause severe environmental damage or explosion <br />resulting in death, serious personal injury, property loss and equipment <br />damage. <br />Observe the following precautions: <br />c. 1. Read and follow all instructions in this manual, including all safety <br />r warnings. <br />2. Comply with all applicable codes including: the National Electrical Code; <br />federal, state, and local codes; and other applicable safety codes. <br />3. Before installing this device, turn Off, tag/lock out power to the system, <br />including console and submersible pumps. <br />4. To protect yourself and others from being struck by vehicles, block off <br />your work area during installation or service. <br />5. Substitution of components may impair intrinsic safety. <br />Before You Begin <br />• A level 1 or higher certified Veeder-Root Technician must be available (on site) to assist in this type of <br />installation. <br />• Comply with all recommended safety practices identified by OSHA (Occupational Safety and Health <br />Administration) and your employer. <br />• Follow all installation requirements as per NFPA (National Fire Protection Association) 30, 30A, and 70. <br />• Review and comply with all the safety warnings in the installation manuals and any other national, State or Local <br />requirements. <br />• A 2 -conductor, 18 AWG shielded cable must be installed in intrinsically safe conduit from each dispenser to the <br />intrinsically safe wiring compartment of the TLS console. <br />• Debris from plumbing modifications should be flushed through the piping system prior to installing the ISD <br />Vapor Flow Meter. <br />• Use only UL recognized Gas/TFE yellow teflon tape on all fittings. Do not use pipe dope to seal pipe threads or <br />fittings in and out of the ISTD Vapor Flow Meter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.