Laserfiche WebLink
9 0 <br />ISD Pressure Sensor Installation Installation Steps <br />Installation Steps <br />n4��; 1. Before installing this device, turn Off, tag/lock out power to the system, including console and submersible <br />pumps. <br />2. Determine which dispenser is closest to the tank being monitored. Remove that dispenser's lower sheet metal <br />doors to gain access to the vapor plumbing, <br />3. Locate a suitable port or plumb a suitable "T" fitting in one of the locations listed below (listed in order of <br />preference): <br />a. The main vapor return line (see Figure 1) - this is the preferred position, <br />b. In the vapor return line between shear valve and main vapor return line, or <br />c. If the vapor flow meter is above the vapor shear valve, in the shear valve housing below the shear valve <br />mechanism, Mote: 1 to 2 ports are typically available on a shear valve, If you have to use one of these ports, <br />make certain it accesses the plumbing beiow the valve mechanism. <br />4. Install one of the 68CA-4-4 male connecters (item 2 in Table 1) from the kit into the tapped hole. <br />5. Install ISD Pressure Sensor (item 1 in Table 1) vertically to the dispenser frame or piping using the 2 -inch <br />conduit clamp, rubber shim, and necessary bolts, nuts, and washers from the included Universal Sensor <br />Mounting kit. Wrap the rubber shim (item 10 in Table 1) around the sensor before inserting it into the clamp. <br />Also make sure the sensor cable outlet is facing up and the pressure sensing port tube in the base of the <br />sensor is facing down. <br />6. Attach one end of the 62CA-4 union (item 3 in Table 1) to the pressure sensing port in the base of the ISD <br />Pressure Sensor. <br />7. Install the remaining 68CA-4-4 male connectors (item 2 in Table 1) from the kit into each of the three ports in <br />the 3 -way calibration valve (item 13 in Table 1). <br />8. Measure, fabricate, and install a 1/4" OD copper tube (item 12 in Table 1) that runs between the 62CA-4 union <br />in the base of the sensor and the center port of the 3 -way calibration valve. <br />9. Measure, fabricate, and install a 1/4" OD copper tube that runs between the 1/4" tube end of the male connector <br />fitting installed beneath the shear valve and one of the two unused ports on the 3 -way valve, being careful not <br />to create any potential liquid traps, <br />10.Screw the 59CA-4 plug, item 4, from the kit onto the last port's male connector. Make sure the valve's handle <br />is set to connect the sensor to the vapor return line and not to the capped (ambient) port. <br />Important! All plumbing's pitch to drain should be 1/4" vertical per 12" horizontal to eliminate liquid traps. <br />1 1.Route the cable from ISD Pressure Sensor to the ISD Flow Meter/ISD Pressure Sensor junction box in the <br />dispenser. Observing polarity, connect the sensor wiring to the field wiring from console and cap with wire nuts <br />(see Figure 2). <br />4 <br />