My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
INSTALL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:58:43 AM
Creation date
11/4/2018 2:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\INSTALL 2008.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION INSTRUCTIONS for <br />HEALY SYSTEMS, INC. <br />CLEAN AIR SEPARATOR <br />The Model 9942, Healy Systems Clean Air Separator Installation consists of a 400 <br />gallon steel tank assembly (9961) that contains a fuel resistant bladder to contain <br />excess gasoline vapors that may develop in gasoline storage tanks during idle <br />periods of gasoline dispensing facility operation. The tank assembly weighs <br />approximately 800 pounds which makes it necessary to have a power assisted <br />lifting device available at the installation site to remove the tank from the <br />transportation vehicle and place it on the required concrete pad (see drawing 9900- <br />9945). The pad (level within 118"Ifoot) is located in close proximity to the storage <br />tank vent lines. The pad is a requirement of this installation. DO NOT PLACE THE <br />TANK DIRECTLY ON THE GROUND OR ASPHALT SURFACE. NOTICE: The installer <br />is responsible to assure that the installation meets the latest edition requirements of <br />NFPA 30 and NFPA 30A. No electrical connections are required. The tank <br />securement method shown in 9900-9945 shall be approved by the local authority <br />having jurisdiction with respect to wind and seismic loading. <br />In addition to the tank, there is a hardware kit that contains the following: <br />1 Healy Model HPVV or UL Approved Pressure/Vacuum vent valve <br />4 Locking 1" NPT Ball Valves <br />4 Pad locks (keyed alike) <br />1 Breather Assembly, Healy Model 9948 <br />1 Vapor Inlet Assembly, Healy Model 9956 <br />1 Float Check Valve Assembly, Model 9466G <br />Reference Healy Systems Installation drawing 9900-9942 for placement of the above <br />parts. The local contractor is responsible to provide all necessary, galvanized <br />piping, non -hardening, UL classified pipe joint compound and plumbing fittings. <br />The tank arrives at the site assembled and tested. All plumbing should be done <br />using galvanized steel pipe (Schedule 40) and approved nipples. Mounting <br />hardware should be galvanized or stainless steel. Careful attention must be paid to <br />the installation drawing C9900-9942 to assure proper operation of the bladder <br />system. The bladder assembly need not be initially inflated after installation. <br />It is important that the tank be secured to the concrete pad as shown on the diagram <br />to prevent any unintentional repositioning of the tank as the connecting plumbing to <br />the vent system is accomplished. <br />CAS 7104 cg <br />
The URL can be used to link to this page
Your browser does not support the video tag.