Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all Environm information <br /> Health Department,(209)468-3420 monitoring program e <br /> conditions of the operating permit.The permit holder must notify <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h). <br /> tQ PAS 1� DATE J <br /> FACIi.ITY NAME �aC tT <br /> FACILITY ADDRESS l a 1 '1 S LSA <br /> u <br /> i <br /> l.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance S <br /> 2.Describe the frequency of performing the monitoring for: <br /> ' PIPING <br /> DA+ L L 1 <br /> TANKS t <br /> 3.Describe the location(s)�o+f where the monitoring will be performed. ie: location of sensors 'n <br /> tJ <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel YAN aHrd <br /> Name and Model of Line Leak Detectors TA 10 U 0liA <br /> Name and Model of Annular Sensors <br /> Name and Model of Piping Sensors <br /> Name and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes O No 2�' <br /> Does the turbine shut down if a sensor is disconnected? Yes❑ No C3' <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No U' <br /> 6.How will the alarm history and subsequent maintenance be recorded?_ <br /> Qf2�o S t Al ®�Wt t2 ' 4PFr't QE"A410 Qto&9 S <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? —AUN JE <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before January1,1003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> O Nc�tNQ �F�'rA *3 �,tit+�6aek <br /> equipment. Jt� (�Nl� <br /> r►crr <br /> (:\Unit nl\Usnmonitoringpim.doc <br /> 5/30/2002 <br />