My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DON
>
8576
>
2300 - Underground Storage Tank Program
>
PR0231079
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 4:27:27 PM
Creation date
11/4/2018 3:04:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231079
PE
2381
FACILITY_ID
FA0003873
FACILITY_NAME
STOCKTON CITY MUNIC UTILITY
STREET_NUMBER
8576
STREET_NAME
DON
STREET_TYPE
AVE
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
8576 DON AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DON\8576\PR0231079\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/8/2012 8:00:00 AM
QuestysRecordID
142141
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> STATE OF CALIFORNIA :• �; <br /> STATE WATER RESOURCES CONTROL BOARD s' ° <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT O 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT O 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE TANK REMOVED 7% <br /> DBAOR FACILITY NAME WHERE TANK IS INSTALLED JTo n Fiial, <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.0 D B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANK NTENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUNLEADEDIr <br /> 3 DIESEL 6 AVIATIONGAS <br /> A El PETROLEUM El 80 EMPTY 1 PRODUCT ❑ lb PREMIUM 4 L ❑ 7 METHANOL <br /> UNLEADED E7] 5 JETFUEL <br /> FUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED Q 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A.S.i <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,8,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL Q 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> S. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 8 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 10D% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 10D%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 <br /> MONITORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMA TE tTb,.fMO/DAY/YR) 2.ESTIMATED OUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL? YES ❑ NO <br /> THIS FoRif HAS AEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 8 91GNAMRE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBERS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNITY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# 39 p 3 � <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> fily— <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATION <br /> FORMS (12-91) - <br /> FOROro1896 <br /> 'o.0 4U <br />
The URL can be used to link to this page
Your browser does not support the video tag.