My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 10 08 02: 03p Eli Iv Contractors Inc 209461 -42 p. 3 <br /> 4F ou-)UU [� <br /> 12-11-US <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans&apprieations as originals vall be retained by EHD) <br /> 1. Site map enctosed YES❑ NO[y <br /> 2 Manuf ulutefs spec sheets attached foray equipment to be installed YFSI[ NO[) <br /> 3. Description ofworkto be completed(Irad_ ding piping,UDC's,or other USTequipment <br /> use a UST Insfaltation plication or performing tank top upgrade. <br /> ` pages 4-8 a;nary for a timely n revi <br /> e <br /> 4, (� <br /> Description of equipm 1 to be used Att tlrawingsrblurIIi��e ..dry � � hCPAO b1f <br /> 5_ M equipment isShatCYceA ed or approved YFS[]•p U <br /> 6. Decontamination Procedures: <br /> a.V144 piping be decontaminated prior to removal? YES(1. NO Cl <br /> b. Iderdify contractorperforming decordamination: <br /> Name <br /> hDnAddress P <br /> city <br /> Zip <br /> r- Desarbe method to be used for decantamroatiore <br /> d_Describe how rirtsate maledW wal be stored onsite prior to manikstitg offsite_ <br /> e. Rinsate Hauler and perm ted Tr_atmAnt,Storage&Disp=l PaGW <br /> Hauler Name <br /> Address PhOnc(__) Hauler Rep# <br /> Permitted pisposat 5de Cdy f'p <br /> 7. a. Describe the method that vnll be uhS¢ed fo purge andlor mert the piping' <br /> b.Piping Haulor. <br /> Name <br /> Address Phone <br /> Mauler Regi>dntion t'(d hauled as hamrdous) Cdy - 22p <br /> Q Piping Disposal Sde: <br /> Name <br /> Address Phone L_j <br /> EPA,'...44poilvo In a Penr died 75D fadity) City. zp <br /> 8_ Is the sampfctg firm an independent Ihid party from the contractor?YES[] NO[] <br /> 9. Describe,in detaa,how the SOO and/or water samples)beneath the piping or dispenser will be obtained: <br /> 10. ceding of ft=Vated sa(Contaminaled'Soa Hazardous Waste Ha(ger): <br /> Address Hauler Regisbabon C Phone <br /> �dY Tip <br /> b)if soli is not to be hauled, describe what will be done with it <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.