Laserfiche WebLink
Dec 11 08 09: 53a Eli Iv Contractors Inc 209461—q42 p. 2 <br /> A%.1 Fiberglass-Composite Pipe Division <br /> AMERON <br /> INTERNATIONAL. DUALOY " Z✓000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Arneron International Fiberglass-Composite Pipe Division <br /> hereby certifies that <br /> Chuck Dowdy <br /> Elite IV Contractors, Inc. <br /> has completed training on the proper installation procedures for <br /> the Du.aIoy 3000 UL Listed fiberglass piping systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3000 <br /> ' /L El /LCX <br /> _ <br /> California <br /> Location Of Tanning <br /> September l., 2006 <br /> DateofM.ming <br /> BiU Robbins <br /> Issued By <br /> Certificate valid for three years from date of issue <br /> 9720 Cypresswood Drive, Houston, TX 77070 <br /> FPb�gb <br />