My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed YES[] NO[I <br /> 2 Manufacturer's spec sheets attached for all equipment to be installed YES[] NO[] <br /> 3- Description of work to be completed(If add-Ing piping UDC's,or other UST <br /> �TInstallation equipment or performing fang fop <br /> Application es as n ary fora timety Ian review <br /> �h 1 <br /> 4• De4cription Of egni meat in be used(A draw' gs/bluepnnts as necessa ): <br /> 5- Ag eouioment is State ce tied or approved. YES[] NO[[ <br /> 6. Decontamination Procedures: <br /> a. Will Piping be decontaminated prior to removal? YES[] NO[j <br /> b. Identify contractor performing decontamination: <br /> Name <br /> Address Phonet_� <br /> City Zip <br /> c. Describe method to be used for decontamination: <br /> d. Describe how rinsate material will be stored onsite prior to mam7estmg offsite: <br /> e. Rinsate Hauler and permitted Treatment,Storage&Disposal FacrW. <br /> Harder Name <br /> Address phDne( Hauler Reg# <br /> Permitted Disposal Sile City <br /> 7. a- Describe the method that will be ubT¢ed to purge and/or inert the piping <br /> b- Piping Hauler. <br /> Name <br /> Addnrss Phone <br /> Hillier Registration V to hauled as hamrdous) City <br /> C. Piping Disposal Site: <br /> Name <br /> Address PhoneCity_ (_,) <br /> EPA IDC(d transported to a Permitted TSD faoay) Zp <br /> S. Is the sampling firm an independent third party from the contractor?YES[] NO[] <br /> g. Describe,in detail,how the soil and/or water sample(s)beneath the piping or dispenser wig be obtained: <br /> 10- Handling <br /> Nameme <br /> of excavated soil(Contaminated Soil Hazardous Waste Hailer): <br /> M <br /> Address Hauler Registration C Phone{ ) <br /> �' ZP <br /> b) If sod is not to be hauled,describe what will be done with it <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.