Laserfiche WebLink
D. Results of Testing/Servicing JUN 17 2016 <br /> Software Version Installed: 329.01 <br /> Com lets the followingchecklist: <br /> rEl o' Is o' Is o' Wereed,functionally tested,and confirmed operational?o' Were all sensors installed al lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> A' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> A fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ® Sump/Trench <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.,no mechanical overfill prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audible at the tank fill points)and operating property? If so,at what percent of tank capacity <br /> does the alar trigger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; []Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,9 applicable <br /> ® Yes ❑ No' Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: FATINA ON SITE ALL PASSED HAD TO ADJUST 91 LD THEN PASSED <br /> Monitoring System CerOficatlon Page 2 of 4 2/21/07 <br />