My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 -2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2013 -2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/4/2018 3:20:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 -2016
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2013 -2016 .PDF
QuestysFileName
COMPLIANCE INFO 2013 -2016
QuestysRecordDate
3/28/2018 9:47:52 PM
QuestysRecordID
3839038
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_w--_-------------------------- <br /> The following is an itemized list of underground storage tank violations that have not <br /> been addressed for SRH FOOD & GAS as of July 15, 2015. <br /> Open violations from May 29,2015 inspection <br /> Violation#103-Current financial responsibility documents not submitted. <br /> Financial responsibility documents have not been submitted to the EHD. Current financial responsibility documents <br /> are required to be submitted annually. Immediately log into the California Environmental Reporting System (CERS): <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> Violation#107-Plot plan/site map not submitted or failed to completely show where monitoring is <br /> performed. <br /> An accurate UST Monitoring Site Plan was not submitted. A site plan must be submitted identifying the locations <br /> where monitoring will be performed. Immediately log into the California Environmental Reporting System (CERS) at <br /> http://cers.calepa.ca.gov/and upload a copy of the UST Monitoring Site Plan. <br /> Violation#126-Failed to report program data electronically. <br /> The UST Response Plan and Owner Statement of Designated UST Operator Compliance were not submitted to the <br /> the California Electronic Reporting System (CERS). Beginning January 1, 2014, all businesses are required to subm <br /> all new(or any changes to existing) UST information, including: UST Monitoring Site Plan, UST Certification of <br /> Financial Responsibility, UST Response Plan, UST Owner/Operator Written Agreement(if applicable), UST Letter fn <br /> Chief Financial Officer, and Owner Statement of Designated UST Operator Compliance online to the CERS at <br /> http://cers.calepa.ca.gov. Immediately upload the required forms to the CERS website. Be sure to include any othe <br /> relevant activities and required fields. <br /> Violation#207 -Designated operator did not inspect all required items and/or the inspection reports not <br /> completed. <br /> The designated operator failed to check and note the correct test dates for the secondary containment(SB989)testii <br /> on eleven of the designated operator monthly inspection reports in the last year. It was listed as: <br /> -3/19/14 on the April and May 2015 reports <br /> -3/20/13 on the September, October, November, and December 2014 and January and February 2015 reports <br /> -3/2013 on the July and August 2014 reports <br /> -3/2012 on the June 2014 report <br /> Secondary containment testing was conducted on March 19, 2012 and March 18, 2015. During the monthly <br /> inspection, the designated operator shall check that all required testing and maintenance for the UST system have <br /> been completed and document the dates they were done. Ensure that designated operators performing monthly <br /> inspections at this facility are including all of the required information on the reports. <br />
The URL can be used to link to this page
Your browser does not support the video tag.