Laserfiche WebLink
(3) A list of facility employees who have been trained by the designated UST operator(s), <br /> shall be maintained on-site or off-site at a readily available location, if approved by <br /> the local agency. The list shall be provided to the local agency upon request. The list <br /> shall include the dates of training for all facility employees, and the hiring dates for <br /> all facility employees hired on or after July 1, 2005. <br /> Records of employee training by the designated operator were not found on site <br /> at the time of the July 13, 2005 routine UST inspection. Facility was asked to submit <br /> copies of employee training by the designated operator to this office within 30 days <br /> on the inspection report, but were never received. <br /> V. ATTACHMENTS <br /> Attachment 1 —UST—Facility form(Former Form A) showing tank owner <br /> Attachment 2—June 11, 2004 routine UST inspection report <br /> Attachment 3 —UST—Tank forms (former Form B), monitoring and response plans, and <br /> financial responsibility documents submitted on July 20, 2004 <br /> Attachment 4—July 21, 2004 follow up letters to June 11, 2004 routine UST inspection <br /> report <br /> Attachment 5—August 19, 2004 routine UST inspection report <br /> Attachment 6—August 19, 2004 routine hazardous waste inspection report <br /> Attachment 7—Photos of measuring sticks found in 87 and 89 drop tubes during August <br /> 19, 2004 routine UST inspection <br /> Attachment 8—August 19, 2004 monitoring system certification and leak detector test <br /> report <br /> Attachment 9—Amended operating permit printed on August 24, 2004 showing facility <br /> is out of compliance <br /> Attachment 10—Notification of secondary containment testing scheduled for November <br /> 5, 2002 <br /> Attachment 11 —Notification of secondary containment testing scheduled for January 10, <br /> 2003 <br /> Attachment 12—Notification of secondary containment testing scheduled for March 23, <br /> 2003 <br /> Attachment 13 —March 23, 2003 secondary containment test report(tank annular results <br /> only) <br /> Attachment 14—August 15, 2003 secondary containment test report (tank top sumps not <br /> tested) <br /> Attachment 15—Photo of facility on September 16, 2004 in operation without a valid <br /> operating permit <br /> Attachment 16—Permit application SR0041422 <br /> Attachment 17—July 13, 2005 routine UST inspection report <br /> Attachment 18 —July 13, 2005 monitoring system certification and leak detector test <br /> report <br /> Attachment 19—July 13, 2005 routine hazardous waste inspection report <br /> Attachment 20—August 24, 2005 follow up letters to July 13, 2005 UST inspection <br /> report <br /> 11 <br />