My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a9 i Be sure to always READ THE DRAWINGS or plans to make <br /> ++ a sure that your mounting points are the same. Call Bravo <br /> Systems if any problem occurs. <br /> A►2 - Position and bolt down conversion frame to the dispenser pan using the anchor plates of the <br /> conversion frame with minimum 1/2" Diameter bolts. Use plastic caps to cover the bolts/nuts. <br /> For Non-Bravo Sumps -A minimum of Four anchor bolts must be secured directly to concrete. <br /> A►3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br /> A►4 - Pre-ptumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br /> if necessary. <br /> DEPENDING ON NEW DISPENSER USED AND/OR <br /> j OFFSET APPLICATION, THE RISER ON THE DISPENSER MAY <br /> NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br /> TAKEN UP BY THE USE OF OFFSETS, ELBOWS, ETC... <br /> AS - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br /> � m <br /> Filter <br /> Filter <br /> Filter <br /> Dispenser <br /> Base <br /> Aor�ine Meters <br /> BRAVO <br /> OFFSET <br /> Anchor Bolt BRAVOII <br /> OFFSET <br /> Cocnrete Anchor <br /> Anchor Bolts <br /> Plate <br /> 0 <br /> BRAVO BOX <br /> FOR OLD Equipment shown is for <br /> ° DISPENSER illustration purposes only <br /> C 4. <br /> and is not a reference <br /> for your layout within <br /> the hydraulic cabinet <br /> Y <br /> 2 ii-Conversion Frame 3-25-08 <br /> 60 39VJ C N 39anos SPL66LZ00B 0760 0TOZIb0/0T <br />
The URL can be used to link to this page
Your browser does not support the video tag.