My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MATERIALS CHECKLIST <br /> ❑ Tools & Equipment ❑ Offsets, elbows, nipples, unions, Etc.. <br /> ❑ Concrete Anchor Bolts * ❑ Plastic caps (sow plugs) for nuts / bolts <br /> 7Y S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br /> PRE-INSTALLATION CHECKLIST <br /> ❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br /> ❑ Conversion Frame is free of damage? <br /> 0 Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br /> ❑ NO modification to the Conv-Frame is necessary? If so, Call 323-888-4133 immediately. <br /> INSTALLATION CHECKLIST <br /> ❑ Dispenser was carefully removed and any spills contained? <br /> ❑ Drawings for all components are on-site and have been reviewed for any problems? <br /> ❑ Conversion Frame is securely bolted to the existing UDC Sump with minimum 1/2" bolts? <br /> ❑ If OPP or a Non-Bravo Systems UDC is existing, were a minimum of 4 anchor bolts <br /> securely installed directly to the concrete? <br /> ❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br /> ❑ All product inlets are pre-plumbed with approved offsets, elbows, pipe, etc..? <br /> ❑ Conversion Frame was inspected for dents or damage? <br /> ❑ Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br /> 4 ii-ConversionFrame 3-25-08 <br /> S0 39hd V N 30anOS SPL66LZO08 0b :60 0TOZ/b0/0T <br />
The URL can be used to link to this page
Your browser does not support the video tag.