My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d 4 <br /> INFINITY GENERAL ENGINEERING CONST& DESIGN <br /> 6716 CASTRO VERDE WAY <br /> ELKGROVE CA95757 <br /> BUS #916-275-1138 <br /> FAX# 916-372-2007 <br /> Email choudrv05Cc,,.yahoo.com <br /> Lic#918438 <br /> To: SAN JOAQUIN ENVIRONMENTAL HEALTH DEPARTMENT <br /> Subject: SCOPE OF WORK <br /> Installation of Enhanced Vapor Recovery II (EVR) <br /> Property address for the installation <br /> 749 E. Charter way <br /> Stockton Ca <br /> Dear Mr. VON FLUE <br /> I am writing this letter to describe a scope of work to be conducted at the property stated <br /> above, the Healy system (Clean Air Separator)Phase II Enhanced Vapor Recovery <br /> (EVR)would be installed to fulfill requirement set forth by the AIR RESOURCES <br /> BOARD and to comply with the local and county requirements. The Healy system phase <br /> II installation would include NEW VERTICAL HEALY TANK(CLEAN AIR <br /> SEPARATOR), adjacent to the existing Vent Lines, tie system in with 1"steel, <br /> Install bollards as needed around the vertical tank, install foundation for the vertical tank, <br /> There would be no underground trenching and disturbance, no impact below ground, <br /> there would be no new dispensers, the existing conduit would be utilize for the electrical <br /> wiring. <br /> The IN STATION DIAGNOSTICS (ISD) would be installing during the upcoming <br /> phase, the ISD WOULD NOT BE INCLUDED AS PART OF THIS INSTALLATION. <br /> B.Z. MAINTENANCE WOULD PERFORM ISD UPON ISD INSTALLATION IN <br /> FUTURE. <br /> The testing of the Healy system diagnostics testing would be performed by the B.Z. <br /> MAINTENANCE. The B.Z. MAINTENANCE WOULD PERFORM AS A SUB <br /> CONTRACTOR and would perform any type of testing requested by the local and <br /> county officials. <br /> I can be reached at 916-275-1138 should you have questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.