My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r s <br /> Software Version Installed: _ <br /> Co rrplete the following eltecklist: <br /> Yes ❑ No's Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors Visually_inspected,functional) tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper Operation? <br /> Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> NIA operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak,fails to operat ,or is electrically disconnected? If yes: which sensors initiate <br /> positive shat-dawn? (Check all that apply) C�Sump/Trench Sensors;`Dispenser ntainment Sensors. <br /> Did ou confirm positive shrit-down due to IRAs and sensor fail ure/d connection Yes; ❑No. <br /> 0 Yes ❑�No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alai-in visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what.percent of tank capacity does the alarm trigger? <br /> 0 Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts in Section E,below. <br /> 3 Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Product; ❑ Water. If es,describe causes in Section E,below.. <br /> Yes ❑ Noy' Was monitoringsystem set-upreviewed to ensure proper settings?Attach set a reports, if applicable <br /> Yes ❑ No* Is all monitoringequipment oerational per manufacturer's specifications? <br /> ` * In Section E below,describe how and when these deficiencies were or will be corrected, <br /> E. Comments: <br /> _ a <br /> k�X ' y`1 ()V-"A_69- Y _0 t� <br /> Page 2 of 3 03101 .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.