My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep 22 08 10:40a Reliable Petroleum 209-845-8953 p.12 <br /> With a 7196-inch socket (99 LD-3000 requires a 518-inch socket), turn the nut no more than 3 <br /> seconds as if looking at an analog clock dial face in a clock-wise direction_ (NEVER TURN <br /> COUNTER CLOCK-WISEI) <br /> Re-test the leak detector and note step through time. <br /> If a 3 GPH leak is not detected, perform another adjustment and re-test. <br /> You may have to perform this adjustment several times before the leak detector slows down <br /> and detects the leak. <br /> To explain what is occurring during the adjustment you should know that the piston assembly <br /> consists of a piston, hollow shaft, spring, and metering poppet. While turning the retaining nut <br /> of this assembly, you are turning the whole assembly. The metering poppet is what contacts <br /> the metering pin of the leak detector while in the reset position and the leak search position. <br /> The metering pin will never move. By changing the position of the metering poppet to the pin, <br /> the flow rate will change when adjusting. This also changes the step through time of the leak <br /> detector. <br /> By adjusting to find a 3 GPH leak, we are reducing flow into the line to make the leak detector <br /> more sensitive to finding a leak. <br /> You may notice that when performing the adjustment, the step through time may start to speed <br /> up. The slowest position may be 180 degrees from the fastest position. If the time is speeding <br /> Lip, continue the adjustment and you will see the leak detector start to slow down. <br /> Always test for a 3 GPH leak after each adjustment. Always adjust in a clock-wise <br /> direction. <br /> If this is the first time you have attempted to adjust a VMI leak detector, we ask that you call <br /> Vrni (800 367-0185) for technical assistance. <br /> Vaporlcss iManufacturing,Inc. <br /> 8700 East Long Mesa Drive, Prescott valley,Arizona 86314 <br /> 800-367-0185 928-775-5191 Fax. 928-775-5309 <br /> Email: vmittfvaporiess.com Website: Nvwtiv.va orless.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.