Laserfiche WebLink
SWRCB,January 2002 • Pageof___, <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑Other(Spec) _ <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: _ <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: _ <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure and starting test: <br /> Test Stair Time: _ <br /> Initial Reading(Ri): _ <br /> Test End Time: <br /> Final Reading(RF): _ <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass ❑Fail Pass ❑Fail Pass ❑ Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Not Tested with this event! <br />