Laserfiche WebLink
D. Results of Testing/Servicing <br /> 27�� <br /> Software Version Installed: <br /> Com lets lbs following checklist: <br /> Yes ❑ No' Is the audible alarm operational? <br /> Yes ❑ No' Is the visual alarm operational? <br /> Yes ❑ No' Were all sensors visually Inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> prooer operation. <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communicafions equipment(e.g.modem)operational? <br /> WA <br /> Yes ❑ No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ WA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> SumpfTrench Sensors; X Dispenser Containment Sensors. Did you confine positive shutdown due to leaks and sensor <br /> ailure/disconnection? Yes; n No. <br /> fy Yes ❑ No' For tank systems that utilize the monitoring system as the primary lank overfill warning device(i.e.no mechanical overfill prevention <br /> ❑ WA valve is installed),is the overfill wang visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank capacity does the alarm trig <br /> ri rnialaer? % <br /> ❑ Yes' No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replace ant parts in Section E,below. <br /> ❑ Yes' No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)C Product; ❑Water. If <br /> eS <br /> ,describe causes in Section E,below. <br /> Yes [I No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No' Is all monitonng equipment operational per manufacturers specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Ill sez&R9 11JGf� a -�- 9 25eR <br /> 4 <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />