My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:30 PM
Creation date
11/4/2018 3:30:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
3/29/2018 4:52:50 PM
QuestysRecordID
3840376
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rti Awls, � qtr u� ly�iy <br /> STANDARD PROCEDURE FOR SOIL/GROUND WATER <br /> SAMPLING DURING REMOVAL OF UNDERGROUND FUEL TANKS <br /> When any subsurface fuel tank is removed, whether for permanent <br /> `ksite ,closure or tank replacement, the following activities shall <br /> ,be performed. <br /> 1.- Visual observation of excavation. All excavation surfaces <br /> shall be observed for evidence of leakage. Evidence of <br /> leakage would include stained soil, areas of free product, <br /> etc. The results of such observations shall be documented. <br /> 2. If the tank is less than 1, 000 gallons, one sample shall be <br /> collected from beneath the middle of the tank at a maximum <br /> of two feet below soil/backfill interface. If the tank is <br /> between 1, 000 and 10, 000 gallons, two soil samples shall be <br /> analyzed from beneath the tank, one from each end of each <br /> tank. If obviously stained or contaminated areas exist in <br /> locations other than the above locations, then additional <br /> soil samples may be collected and analyzed from these <br /> obviously stained or contaminated areas as instructed by the <br /> Regulatory Agencies. <br /> 3 . Soil samples shall be collected from the native soil at a <br /> maximum of two feet below the fill/native soil interface. <br /> The following soil sampling method shall be used at the tank <br /> removal site. <br /> • Immediately upon removal of the tank, a backhoe bucket of <br /> native soil shall be taken from between the native <br /> soil/backfill interface to a maximum of two feet below <br /> this interface. This soil shall be rapidly brought to <br /> the surface. <br /> Approximately three inches shall be rapidly scraped away <br /> from the surface of this soil, then a clean brass tube <br /> (at least three inches long) shall be driven into the <br /> soil with a wooden or rubber mallet. <br /> The ends of the brass tube shall be covered with aluminum <br /> foil, then plastic end caps, and finally wrapped with a <br /> suitable tape. <br />
The URL can be used to link to this page
Your browser does not support the video tag.