My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
930
>
2300 - Underground Storage Tank Program
>
PR0500994
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:27 PM
Creation date
11/4/2018 3:31:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0500994
PE
2381
FACILITY_ID
FA0004959
FACILITY_NAME
TRI VALLEY AUTO DISMANTLERS
STREET_NUMBER
930
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16718303
CURRENT_STATUS
02
SITE_LOCATION
930 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\930\PR0500994\BILLING.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />r VIYIV'N WIY <br />A. OWNERS TANK I.D.# B. MANUFACTURED BY: <br />C. DATE INSTALLED(MOIDAY/YEAR) D. TANK CAPACITY IN GALLONS: 0, <br />A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />2 PETROLEUM <br />B. <br />1a REGULAR <br />C. ❑ UNLEADED <br />3 DIESEL <br />❑ 8 AVIATIONGAS <br />4 GASAHOL <br />❑ ❑ 80 EMPTY <br />U2/1 PRODUCT <br />❑ 1DPREMIUM <br />❑ 7 METHANOL <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />UNLEADED ❑ <br />E2 LEADED ❑ <br />5 JETFUEL <br />99 OTHER (DESCRIBE IN ITEM D. BELO" <br />D. IF(A.1) IS NOTMARKED, ENTER NAME OFSUBSTANCE STORED C.A.S.#: <br />III. TANK CONSTRUCTION MARK ONE ITEM ON[ Y IN WIXF9A R ANnn nun All TWAT ARRI IFRIN.nYn <br />A. TYPE OF <br />DI <br />1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />3 GRAVITY A U 99 OTHER <br />SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK <br />❑ 99 OTHER <br />B. TANK1 <br />BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ S 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />5 ALUMINUM <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />LINING <br />❑ 5 GAN LINING <br />❑ S UNLINED <br />❑ 95 UNKNOWN99 <br />❑ OTHER <br />10 CATHODIC PROTECTION <br />IS LINING MATERIAL COMPATIBLE WITH 10D% METHANOL? <br />YES_ NO— <br />D. <br />D. CORROSION <br />❑ / POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION ❑ 91 NONE <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />IV. PIPING INFORMATION n.IRCF A IF Aunvc r.,..I no a Ic uuncer_en„un e—^.—,,. -, <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />A U <br />2 PRESSURE A U <br />3 GRAVITY A U 99 OTHER <br />B. <br />CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br />C. <br />MATERIAL AND <br />A U <br />1 BARE STEEL <br />A U <br />2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC)A U <br />4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U <br />6 CONCRETE A U <br />7 STEEL W/ COATING A U <br />S 10D% METHANOL COMPATIBLE WIFRP <br />PROTECTION <br />A U <br />9 GALVANIZED STEEL <br />A U <br />10 CATHODIC PROTECTION <br />A U 95 UNKNOWN A U <br />99 OTHER <br />D. <br />LEAK DETECTION <br />❑ 1 <br />AUTOMATIC LINE LEAK <br />DETECTOR ❑ 2 LINET.IGHTNESS TESTING ❑ 9 WT 5 TIAL <br />9B OTHER <br />❑ <br />MONITORING <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br />❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ❑ NO E7SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE. IS TRUE AND CORRFC..T <br />APPLICANTS NAME <br />(PRINTED A SIGNATURE) DATE <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE I.D.# W 1/10117T>TI�T� e,*R" <br />PERMRNUMBER PERMIT APPROVED BV/DATE P _ Alnt ^L•�ITE <br />/Zu—q/LQL/J C <br />FORM B (9-90) 1 mlb runM MUD I lit AL;WMPANIED BY A PERMIT APPLICATION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.