Laserfiche WebLink
I�titoring System Certification • <br /> Site Address: 3633 DUCK CREEK DR. @ Date of Testing/Service: 10/24/2002 <br /> OFF HWY 99 @ MARIPOSA RD <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 119.02 <br /> Complete the following checklist: <br /> ❑x Yes EINO. Is the audible alarm operational? <br /> Yes ❑No` Is the visual alarm operational? <br /> Q Yes ❑No• Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No` <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> ❑ <br /> interfere with their proper operation? <br /> ® Yes ❑No` NIA If alarms are relayed to a remote monitoring station,is all communications equipment(e.g. modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ Yes ©No` ❑NIA monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ Yes ❑No <br /> ❑ Yes ❑No ❑x NIA For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes' ©No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ®No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> © Yes ®NaWas monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> ® Yes ❑No` Is all monitoring equipment operational per manufacturers'specifications? <br /> In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> Aux DSL lines and LD not tested at this time. <br /> page 2 of 3 <br />