My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1991 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 1991 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:26:05 PM
Creation date
11/4/2018 3:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 2004
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 1991 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2004
QuestysRecordDate
4/25/2018 10:10:21 PM
QuestysRecordID
3869105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A11110, AN& <br /> INDIVIDUM TANK INFORMATION AND EST RESULTS <br /> .rmp rankrK*)gY <br /> TEST DATE:12/27/01 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER2220094 <br /> CLIENT:vERTEx SERVICES, LLC AUSTIN,TEXAS 78757(512)451-6334 SITE:RyDER 1071A <br /> . .................. <br /> .......... <br /> ....................... X, <br /> ............. <br /> Xw <br /> �" . . .............. <br /> X <br /> ............. <br /> Tank ID: 1/MAIN I Tank manifolded: yEs Bottom to top fill in inches.- 3.68.8 <br /> Product'. DIESEL Vent manifolded: YES Bottom to grade in inches: <br /> Capacity in gallons: 12,110 Vapor recovery manifolded! No Fill pipe length in inches: 72.8 <br /> Diameter in inches: 96.00 Overfill protection:YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 391 Overspill protection: yEs Stage I vapor recovery: NONE <br /> Material-, DW STEEL Installed: ATG Stage I I vapor recovery-, NONE <br /> CP installed on: <br /> COMMENTS <br /> Note that line "A" refers to the Main supply line, line "B" refers to sat 1, line "c" refers to sat 2, line 'Id" <br /> refers to sat 5. For information on sat 6 refer to "RESERVE DIESEL line 'Id". <br /> xxn:........ ..... <br /> ............. <br /> .......... <br /> est met o <br /> --5]1,11��11;"K'��ETECTOR 4TEST RESULTS .'..-T h <br /> .............. <br /> start in End (i in New/passed Failed/replaced New/passed Failedireplaced <br /> Dipped Water Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Dipped Product Level: Make! <br /> Probe Water Level: Model: <br /> Ingress Detected: Water Bubble Ullage S/N: <br /> Test time: Open time in sec: <br /> Inclinometer reading: Holding psi: <br /> VacuTect Test Type: NOT Resiliency cc-, NOT NOT <br /> VacuTect Probe Entry Point: TESTED est leak rate ml/m: TESTED TESTED <br /> Pressure Set Point: Metering psi-. <br /> Tank water level in inches-, Calib. leak in gph: <br /> Water table depth in inches: Results: <br /> Determined by (method): <br /> Result: COMMENTS <br /> COMMENTS <br /> INF <br /> TE 88_ <br /> . ........... <br /> .............. <br /> ST�RIESULTS� <br /> ........... <br /> ..... ... <br /> L t�� <br /> Material: DW FIBERG FIBERGLASS FIBERGLASS FIBERGLASS <br /> Impact Valves Operational: YES Diameter(in): 2.0 2.0 2.0 2.0 <br /> Length(ft)-. 100.0 25.0 25.0 25.0 <br /> COMMENTS Test psi: 50 50 <br /> Bleedback cc: 0 30 25 <br /> Test time (min): 30 30 30 <br /> Test 1:Start time: 13:17 13:14 <br /> Finish psi: 0 30 NOT 35 <br /> Vol change cc: 0 22 17 <br /> Test 2: Start time: 13:28 TESTED 13:25 <br /> Finish psi: 0 32 37 <br /> Vol change cc: a 17 15 <br /> Test 3:Start time: 13:39 13:36 <br /> Finish psi: 0 33 37 <br /> Vol change cc: 0 17 15 <br /> Final gph: 0.000 0.030 0.025 <br /> Result:NOT COMPLETE PASS PASS <br /> Pump type: PRESSURE PRESSURE PRESSURE PRESSURE <br /> Pump make.- RED JACKET NONE NONE NONE <br /> Printed 01/08/200208:11 CCHAPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.