My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1991 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 1991 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:26:05 PM
Creation date
11/4/2018 3:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 2004
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 1991 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2004
QuestysRecordDate
4/25/2018 10:10:21 PM
QuestysRecordID
3869105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nov 06 01 02 : 18p Ryder Environmental [ 615 ) 890-5105 p. 5 <br /> FR01'1 RYDEF2 TR <br /> ANSPORTRTION FAX NO. : 2099433210 Nov. 02 2001 03: 14PM PS <br /> WRI=N MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRA A <br /> This monitoring program must be kept at the UST location at all tithes. Tic information on this m4 titoring, <br /> program are conditions of the operating permit. The pemtit holder must notify San Joaquin Co inry <br /> ErMronmental Health Division, phone (209) 468-3420 within iii days of any changes to the monis)ring <br /> procedures, unless required to obtain approval btfore malting the change. <br /> �] Required by Sections <br /> ,2632�(d)�and 264�1(fa())CC r� <br /> Facility Name !'1\ �� �L�l'�' ' t t` �1sLIIJ✓' �� ! I <br /> Facility Address i? E ��• r4 <br /> P. pescrrtt the fxequ c}' of perfo g the MO to g: r <br /> Tanl� tC, /k <br /> piping T — <br /> S. What methods and equipment, identified by [lame and model, will be u ed for <br /> performing the monitoring: <br /> Tank <br /> Piping <br /> C. Describe the lacmion(s) where the monitoring will be performed (facility p or plan <br /> should be attached): <br /> p. List the name(s) and titles) ©f the people responsible: for perf'ormixig the me nitoring <br /> and/or maintaining the equipment: <br /> E. Reporting format for monitoring: <br /> Tank -- - <br /> piping <br /> F Describe the preventive maintenance schedule for the monitoring equiprne�it. Note: <br /> Mr.intetlarice trust be ict accordun— with the manufacturers' maintenance schedule <br /> but not less than every 12 months: - <br /> G. Llescribe the training necessary for the operation of LIST system), includit g piping, <br /> and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.